← Back
Condo, residential unit in 2-10 unit building
1489 STERLING PLACE
BROOKLYN · BIN 3036574
💬 Discuss this project
1901Year Built
2Stories
R1Building Class
R6Zoning
5,083 sfGross Floor Area
8Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential unit in 2-10 unit building · Owner of record: BH STERLING REALTY GROUP LLC · 2,555 sf lot · 1.99 FAR built · Flood zone X
Locations of Work
StructuralFire ProtectionGeneral
Roof2p · 2 filings · 13 docs
Penthouse2p · 1 filing · 10 docs
Floor 32p · 1 filing · 10 docs
Floor 2
Floor 1
Cellar1p · 1 filing · 3 docs
Basement3p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GIM CONSTRUCTION1403/22/2026
BEDSTUY MANAGEMENT103/22/2026
BH STERLING REALTY GROUP LLC1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC703/07/2023
ASHRAF CORP205/02/2022
SEAD CONSULTING ENGINEERS410/29/2021
ADVANCE DESIGN GROUP, INC104/21/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DANICO SERVICES403/21/2026
SION CONSULTING ENGINEERING1403/21/2026
KNF SERVICES CROP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GIM CONSTRUCTION INCGeneral Contractor1207/08/2026
LAKHI GENERAL CONTRACTORGeneral Contractor207/08/2026
LENS ELECTRIC INC 003366General Contractor203/22/2026
ALL PRO PLBG & HTG INCPlumbing207/08/2026
SION HOURIZADEHElectrical103/21/2026
ALL PRO PLBG & HTG INCFire Protection107/08/2026
LENS ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161103/07/2023
Building Lifecycle
All (152)Filed (13)Permit Issued (12)Signed Off (9)Violation (60)Inspection (6)Objection (22)Special Inspection (30)
06/11/2025
Violation issued (HPD, closed)
A
04/11/2024
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
09/19/2023
Violation issued (HPD, closed)
A
03/20/2023
Signed off — Alteration
Installing 8 HVAC ELECTRIC DUCTLESS MULTI-ZONE HEAT PUMP MITSUBISHI UNITS....MODEL NO.: MXZ-2B20NA-1, COOLING:18.000 - 20.000 BTU. HEATING: 22.000 BTU.MEA NO.: 384-04-E COL. 5, EFFICIENCY: 18 SEER > 13 SEER REQ. MIN. EFFICIENCY & 8.9 HSPF
B00356901-I1
03/20/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/20/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/20/2023
Special inspection requirement — Final
FAHAD FATEH
03/17/2023
Objection raised — Other
03/17/2023
Objection resolved — Addressed
03/16/2023
Signed off — Alteration
VERTICAL AND HORIZONTAL ENLARGEMENT & CONVERSION OF AN EXISTING 3 ST. 2 FA. BLDG. TO A 4 STORY W/ PENT., 8 FA BLDG. NEW PLUMBING FIXTURES.. REMOVE THE VIOLATIONS NO. 35242532K, 34562390K, 34622691X, 34622692H.
B00301648-I1
03/15/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
03/15/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
03/15/2023
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
FAHAD FATEH
03/15/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
03/15/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
03/15/2023
Special inspection requirement — Electrical energy consumption
FAHAD FATEH
03/15/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
03/15/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/14/2023
Objection resolved — Addressed
03/10/2023
Objection raised — Mechanical
03/10/2023
Objection raised — Energy
03/09/2023
Objection raised — Other
03/07/2023
Filed — Alteration
VERTICAL AND HORIZONTAL ENLARGEMENT & CONVERSION OF AN EXISTING 3 ST. 2 FA. BLDG. TO A 4 STORY W/ PENT., 8 FA BLDG. NEW PLUMBING FIXTURES.. REMOVE THE VIOLATIONS NO. 35242532K, 34562390K, 34622691X, 34622692H.
B00301648-P1
03/06/2023
Filed — Alteration
Installing 8 HVAC ELECTRIC DUCTLESS MULTI-ZONE HEAT PUMP MITSUBISHI UNITS....MODEL NO.: MXZ-2B20NA-1, COOLING:18.000 - 20.000 BTU. HEATING: 22.000 BTU.MEA NO.: 384-04-E COL. 5, EFFICIENCY: 18 SEER > 13 SEER REQ. MIN. EFFICIENCY & 8.9 HSPF
B00356901-P2
03/03/2023
Signed off — Alteration
B00339771-I1
03/02/2023
Special inspection requirement — Final
FAHAD FATEH
03/02/2023
Special inspection requirement — Soil Percolation Test - Individual On-Site Private Sewage Disposal Systems
FAHAD FATEH
03/02/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
03/02/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
03/02/2023
Special inspection requirement — HVAC and service water heating system controls
FAHAD FATEH
03/02/2023
Special inspection requirement — Electrical energy consumption
FAHAD FATEH
03/02/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
03/02/2023
Special inspection requirement — HVAC and service water heating equipment
FAHAD FATEH
03/02/2023
Special inspection requirement — HVAC insulation and sealing
FAHAD FATEH
03/02/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
03/02/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/14/2023
Filed — Alteration
Installing 8 HVAC ELECTRIC DUCTLESS MULTI-ZONE HEAT PUMP MITSUBISHI UNITS....MODEL NO.: MXZ-2B20NA-1, COOLING:18.000 - 20.000 BTU. HEATING: 22.000 BTU.MEA NO.: 384-04-E COL. 5, EFFICIENCY: 18 SEER > 13 SEER REQ. MIN. EFFICIENCY & 8.9 HSPF
B00356901-P1
02/09/2023
Signed off — Alteration
B00483923-I1
02/07/2023
Signed off — Alteration
B00480882-I1
02/07/2023
Signed off — Alteration
POST APPROVAL AMENDMENT WITH MONOR CHAGES ON THE STRUCTURALDRAWINGS AS MARKED UP.
B00350501-I1
02/06/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/06/2023
Special inspection requirement — Final
sion hourizadeh
02/06/2023
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
01/26/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/18/2023
Signed off — Alteration
B00474470-I1
01/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/13/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/09/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/05/2022
Signed off — Alteration
INSTALL MEDIUM DUTY PIPE SCAFFOLDING IN ORDER TO FOR A VERTICAL & HORIZONTAL ENLARGEMENT & CONVERSION OF AN EXISTING 3 STORY 2 FAMILY BUILDING TO A 4 STORY WITH PENTHOUSE, 8 FAMILY RESIDENTIAL BUILDING UNDER JOB # 322002514.
B00696762-I1
09/30/2022
Permit issued — Plumbing
B00301648-I1-PL
08/11/2022
Inspection — Pass-Final Scaffold Non-Directive 14
Pass
View inspection ↗
07/25/2022
Signed off — Alteration
B00696745-I1
06/29/2022
Permit issued — Supported Scaffold
B00696762-I1-SF
Latest 60 of 152 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC09/30/2022
DOB NOWSupported ScaffoldSigned-offLAKHI GENERAL CONTRACTOR06/29/2022
DOB NOWSidewalk ShedSigned-offLAKHI GENERAL CONTRACTOR05/05/2022
DOB NOWSprinklersSigned-offALL PRO PLBG & HTG INC05/03/2022
DOB NOWConstruction FenceSigned-offRICHTER + RATNER BUILDERS01/31/2022
DOB NOWStructuralSigned-offRICHTER + RATNER BUILDERS01/31/2022
DOB NOWMechanical SystemsSigned-offRICHTER + RATNER BUILDERS12/20/2021
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC10/06/2021
DOB NOWStructuralSigned-offRICHTER + RATNER BUILDERS07/14/2021
DOB NOWSupport of ExcavationSigned-offRICHTER + RATNER BUILDERS07/02/2021
DOB NOWFoundationSigned-offRICHTER + RATNER BUILDERS07/01/2021
DOB NOWConstruction FenceSigned-offRICHTER + RATNER BUILDERS04/27/2021
BIS—ISSUEDGIM CONSTRUCTION INC03/02/2022
BIS—ISSUEDGIM CONSTRUCTION INC04/26/2021
1 project · most recent 01/07/2022
General Wiring
FiledStatusContractorScope
01/07/2022CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/13/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/09/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/11/2022Pass-Final Scaffold Non-Directive 14PassView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
03/20/2023Mechanical SystemsFAHAD FATEHspecial
03/20/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/20/2023FinalFAHAD FATEHprogress
03/15/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
03/15/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
03/15/2023Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsFAHAD FATEHspecial
03/15/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
03/15/2023Maintenance informationFAHAD FATEHenergy_progress
03/15/2023Electrical energy consumptionFAHAD FATEHenergy_progress
03/15/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
03/15/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/02/2023FinalFAHAD FATEHprogress
03/02/2023Soil Percolation Test - Individual On-Site Private Sewage Disposal SystemsFAHAD FATEHspecial
03/02/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
03/02/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
03/02/2023HVAC and service water heating system controls FAHAD FATEHenergy_progress
03/02/2023Electrical energy consumptionFAHAD FATEHenergy_progress
03/02/2023Maintenance informationFAHAD FATEHenergy_progress
03/02/2023HVAC and service water heating equipment FAHAD FATEHenergy_progress
03/02/2023HVAC insulation and sealing FAHAD FATEHenergy_progress
03/02/2023Mechanical SystemsFAHAD FATEHspecial
03/02/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
02/06/2023Mechanical SystemsFAHAD FATEHspecial
02/06/2023Finalsion hourizadehprogress
02/06/2023Energy Code Compliance Inspectionssion hourizadehprogress
Latest 25 of 33.
▾Documents — 170 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch4
09/01/2026B00480882-I1Request digital key ↗
09/01/2026B00483923-I1Request digital key ↗
08/30/2026B00696745-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/02/2026B00356901-I1Request digital key ↗
08/15/2026B00356901-P1Request digital key ↗
08/15/2026B00356901-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00350501-I1Request digital key ↗
08/15/2026B00350501-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00301648-I1Request digital key ↗
08/15/2026B00301648-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/01/2026B00474470-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/02/2026B00339771-I1Request digital key ↗
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION15
02/24/2023322002514Open ↗
02/15/2023322002514Open ↗
02/14/2023322002514Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION5
03/24/2022322002514Open ↗
03/10/2022322002514Open ↗
03/10/2022322002514Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/30/2021322002514Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/29/2022322111200Open ↗
▸BISPARTIAL DEMO PLAN & DS1 (FOR AL/EW-OT PERMITS)1
03/30/2021322002514Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
12/28/2022322002514Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
06/12/2020322002514Open ↗
▸BISVERIFY TAX LOT1
04/25/2023322002514Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
02/07/2023322002514Open ↗
▸BISZONING DIAGRAM1
06/12/2020322002514Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
06/12/2020322002514Open ↗
▸Seals & Professional Certifications43
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00301648-P1Open ↗
09/02/2026B00301648-I1Open ↗
09/01/2026B00480882-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
08/31/2026B00301648-I1Open ↗
08/31/2026B00301648-I1Open ↗
08/31/2026B00301648-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
08/31/2026B00301648-I1Open ↗
08/31/2026B00301648-I1Open ↗
08/26/2026B00301648-P1Open ↗
Showing 3 of 10 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
12/04/2020340746474Open ↗
08/27/2020340759806Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
10/29/2019322002514Open ↗
10/29/2019322002514Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/27/2020340759806Open ↗
▸Trade Schedules & Equipment4
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/13/2022322002514Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/13/2022322002514Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/28/2023322002514Open ↗
▸BISEQUIPMENT USE PERMITS1
03/28/2023322002514Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
06/12/2020322002514Open ↗
10/29/2019322002514Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/30/2021322002514Open ↗
▸BISSTREET TREE SIGNOFF1
12/13/2022322002514Open ↗
▸Environmental & Asbestos7
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/27/2020340759806Open ↗
06/12/2020322002514Open ↗
10/29/2019322002514Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/01/2026B00480882-I1Open ↗
09/01/2026B00483923-I1Open ↗
08/13/2026B00339771-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B00350501-I1Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
04/25/2023322002514Open ↗
03/30/2021322002514Open ↗
09/25/2020340759806Open ↗
Showing 3 of 4 on file for this type
▸BISINTERIOR LIGHTING POWER1
12/13/2022322002514Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/13/2022322002514Open ↗
▸BISFENESTRATION AREAS1
12/13/2022322002514Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/13/2022322002514Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/13/2022322002514Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/13/2022322002514Open ↗
▸BISLIGHTING CONTROLS1
12/13/2022322002514Open ↗
▸BIS* HVAC INSULATION AND SEALING1
12/13/2022322002514Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
10/29/2019322002514Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2022322002514Open ↗
▸BISEXTERIOR LIGHTING POWER1
12/13/2022322002514Open ↗
▸BISFENESTRATION AIR LEAKAGE1
12/13/2022322002514Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00301648-I1Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY6
03/30/2021322002514Open ↗
03/30/2021322002514Open ↗
09/14/2020340759806Open ↗
Showing 3 of 6 on file for this type
▸BISSOIL REPORT2
08/27/2020340759806Open ↗
06/12/2020322002514Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
02/06/2023322002514Open ↗
04/22/2021322002514Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/21/2023322002514Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/13/2022322002514Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/13/2022322002514Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/13/2022322002514Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/13/2022322002514Open ↗
▸BISMASONRY1
12/13/2022322002514Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
09/25/2020340759806Open ↗
▸BISSOIL PERC. TEST-INDIVID ON-SITE PRIVATE SEWAGE DISP.(SEPTIC)1
12/13/2022322002514Open ↗
▸BISMECHANICAL SYSTEMS1
12/13/2022322002514Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/29/2022322111200Open ↗
11/29/2022322111200Open ↗
11/29/2022322111200Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
02/24/2023322002514Open ↗
02/15/2023322002514Open ↗
07/11/2022322002514Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/24/2020340746474Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
01/19/2023322002514Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT3
09/25/2020340759806Open ↗
06/12/2020322002514Open ↗
10/29/2019322002514Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/10/2022322002514Open ↗
03/30/2021322002514Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
04/10/2023322002514Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
03/30/2021322002514Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
04/25/2023322002514Open ↗
02/28/2023322002514Open ↗
07/27/2022322002514Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
11/30/2022322111200Open ↗
10/29/2019322002514Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/27/2020340759806Open ↗
▸Other Documents3
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
09/25/2020340759806Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/13/2022322002514Open ↗
▸DOB NOWAdjoining Owners Notification1
09/01/2026B00480882-I1Open ↗