← Back
BuildNYC
Gas station with service / auto repair
149-04 ROCKAWAY BOULEVARD
QUEENS · BIN 4625884
💬 Discuss this project
1964Year Built
1Stories
G4Building Class
R5DZoning
786 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Gas station with service / auto repair · Owner of record: Shurgett · 15,107 sf lot · 0.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofBolla MarketUnder Construction12p · 2 filings · 20 docs
Floor 1Bolla Market, PapaJohns PizzaUnder Construction38p · 3 filings · 20 docs
CellarBolla MarketUnder Construction11p · 3 filings · 20 docs
Site & exteriorBolla MarketUnder Construction35p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Bolla EM Realty310/10/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Pegasus Associates107/03/2026
Highpoint Associates1304/07/2026
Cornerstone503/11/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Highpoint Associates1503/21/2026
Casino Development Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Bolla ConstructionGeneral Contractor610/14/2026
Bolla ConstructionScaffold107/04/2026
Maccarone PlumbingPlumbing110/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Skytesting Civil8448804/07/2026
High Point Engineering1151102/19/2026
Building Lifecycle
All (81)Filed (19)Permit Issued (8)Objection (24)Special Inspection (30)
10/14/2026
Permit issued — Plumbing
Q01352314-S2-PL
10/13/2026
Permit issued — General Construction
Q00883908-S5-GC
10/13/2026
Permit issued — Mechanical Systems
Q00883908-S2-MS
10/13/2026
Permit issued — Earth Work
Q00883908-S1-GC-CX
10/13/2026
Permit issued — Structural
Q01352314-S1-GC-CX
10/09/2026
Permit issued — General Construction
Q00883908-I1-GC
09/30/2026
Permit issued — General Construction
Q01352314-I1-GC
09/02/2026
Objection resolved — Resolved
08/19/2026
Objection raised — Other
07/03/2026
Filed — Alteration
Q01416140-I1
07/02/2026
Permit issued — Protection and Mechanical Methods
Q01327446-S1-PMM
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2026
Special inspection requirement — Mechanical Systems
06/12/2026
Special inspection requirement — Final
06/12/2026
Special inspection requirement — Energy Code Compliance Inspections
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2026
Special inspection requirement — Subgrade Inspections
ROBERT KARPOWICZ
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBERT KARPOWICZ
04/08/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT KARPOWICZ
04/08/2026
Special inspection requirement — Masonry
ROBERT KARPOWICZ
04/08/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT KARPOWICZ
04/08/2026
Special inspection requirement — Final
Christopher Tartaglia
04/07/2026
Filed — Alteration
Removal of (3) 10,000-gallon underground storage tanks w/ associated piping. Installation of (1) 12,000-gallon underground storage tank & (1) 12,000-gallon compartment tank w/ associated piping, islands & dispensers. No change in use, egress or occupancy.
Q01103898-P2
03/13/2026
Special inspection requirement — Final
Christopher Tartaglia
03/13/2026
Special inspection requirement — Subgrade Inspections
ROBERT KARPOWICZ
03/13/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
ROBERT KARPOWICZ
03/13/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ROBERT KARPOWICZ
03/13/2026
Special inspection requirement — Concrete - Cast-In-Place
ROBERT KARPOWICZ
03/13/2026
Special inspection requirement — Masonry
ROBERT KARPOWICZ
03/11/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-P1
02/27/2026
Objection resolved — Addressed
02/19/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-S5
02/19/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-S4
02/19/2026
Special inspection requirement — Subgrade Inspections
ROBERT KARPOWICZ
02/16/2026
Filed — Alteration
Q01352314-S2
02/13/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-S1
02/13/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-S2
02/13/2026
Filed — New Building
Subsequent filing for site/civil work only.
Q00883908-S3
02/13/2026
Special inspection requirement — Insulation placement and R values
ROBERT KARPOWICZ
02/13/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT KARPOWICZ
02/13/2026
Special inspection requirement — Fenestration areas
ROBERT KARPOWICZ
02/13/2026
Special inspection requirement — Insulation placement and R values
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ROBERT KARPOWICZ
02/13/2026
Special inspection requirement — Fenestration air leakage
02/13/2026
Special inspection requirement — Fenestration air leakage
ROBERT KARPOWICZ
02/13/2026
Special inspection requirement — Fenestration areas
02/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/13/2026
Special inspection requirement — Air barrier - visual inspection
02/12/2026
Objection resolved — Addressed
02/12/2026
Special inspection requirement — Air barrier — testing
ROBERT KARPOWICZ
02/12/2026
Special inspection requirement — Exterior lighting power
ROBERT KARPOWICZ
02/02/2026
Filed — Alteration
Installation of 30' curb cut located on Rockaway Avenue as indicated on plans. No change to use, egress or occupancy.
Q01352297-S1
02/02/2026
Filed — Alteration
Q01352314-I1
02/02/2026
Filed — Alteration
Q01352314-S1
02/02/2026
Filed — Alteration
Installation of 30' curb cut located on Rockaway Avenue as indicated on plans. No change to use, egress or occupancy.
Q01352297-I1
02/02/2026
Filed — Alteration
Installation of 30' curb cut located on Rockaway Avenue as indicated on plans. No change to use, egress or occupancy.
Q01352297-S2
12/16/2025
Filed — Alteration
Subsequent filing for use of mechanical construction equipment to lift, hoist and move material, earth, and personnel on site. No change in use, egress or occupancy.
Q01327446-S1
12/16/2025
Filed — Alteration
Subsequent filing for use of mechanical construction equipment to lift, hoist and move material, earth, and personnel on site. No change in use, egress or occupancy.
Q01327446-I1
08/21/2025
Objection raised — Scope
08/21/2025
Objection resolved — Addressed
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMaccarone Plumbing10/14/2026
DOB NOWGeneral ConstructionPermit IssuedBolla Construction10/13/2026
DOB NOWMechanical SystemsPermit IssuedBolla Construction10/13/2026
DOB NOWEarth WorkPermit IssuedBolla Construction10/13/2026
DOB NOWStructuralPermit IssuedBolla Construction10/13/2026
DOB NOWGeneral ConstructionPermit IssuedBolla Construction10/09/2026
DOB NOWGeneral ConstructionPermit IssuedBolla Construction09/30/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedBolla Construction07/02/2026
2 projects · most recent 04/07/2026
Concrete
FiledStatusContractorScope
04/07/2026——Concrete
12/16/2025Permit IssuedBolla Construction2 scope_items
▾Special Inspection Requirements (DOB NOW) — 85
DateRequirementInspectorRole
06/12/2026Final—progress
06/12/2026Mechanical Systems—special
06/12/2026Structural Stability – Alterations of existing buildings—special
06/12/2026Fire-Resistant Penetrations and Joints—special
06/12/2026Energy Code Compliance Inspections—progress
04/08/2026FinalChristopher Tartagliaprogress
04/08/2026Subsurface Conditions – Fill Placement & In-Place DensityROBERT KARPOWICZspecial
04/08/2026Excavations - Sheeting, Shoring, and BracingROBERT KARPOWICZspecial
04/08/2026Concrete - Cast-In-PlaceROBERT KARPOWICZspecial
04/08/2026Subgrade InspectionsROBERT KARPOWICZspecial
04/08/2026MasonryROBERT KARPOWICZspecial
03/13/2026MasonryROBERT KARPOWICZspecial
03/13/2026Subgrade InspectionsROBERT KARPOWICZspecial
03/13/2026Subsurface Conditions – Fill Placement & In-Place DensityROBERT KARPOWICZspecial
03/13/2026FinalChristopher Tartagliaprogress
03/13/2026Excavations - Sheeting, Shoring, and BracingROBERT KARPOWICZspecial
03/13/2026Concrete - Cast-In-PlaceROBERT KARPOWICZspecial
02/19/2026Subgrade InspectionsROBERT KARPOWICZspecial
02/13/2026Insulation placement and R valuesROBERT KARPOWICZenergy_progress
02/13/2026Fenestration air leakage—energy_progress
02/13/2026Fenestration air leakageROBERT KARPOWICZenergy_progress
02/13/2026Fenestration and door U-factor and product ratingsROBERT KARPOWICZenergy_progress
02/13/2026Fenestration areasROBERT KARPOWICZenergy_progress
02/13/2026Air barrier - visual inspectionROBERT KARPOWICZenergy_progress
02/13/2026Fenestration and door U-factor and product ratings—energy_progress
Latest 25 of 85.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Bolla MarketRetailCellar, Floor 1, Roof
Project Q01416140 Alteration · Objections · 07/03/2026
Project Q00883908 New Building · Permit Entire · 06/29/2023
PapaJohns PizzaRestaurant / Food ServiceFloor 1
Project Q01352297 Alteration · Permit Entire · 02/02/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/21/2026Q01103898-P1Request digital key ↗
08/21/2026Q01103898-P2Request digital key ↗
08/21/2026Q01103898-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q00883908-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00883908-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00883908-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/21/2026Q01103898-P1Open ↗
08/21/2026Q01103898-P2Open ↗
08/21/2026Q01103898-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/02/2026Q01103898-I1Open ↗
09/01/2026Q00883908-S1Open ↗
09/01/2026Q00883908-S1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q00883908-S1Open ↗
09/01/2026Q00883908-S1Open ↗
08/28/2026Q01352314-S1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026Q00883908-I1Open ↗
08/13/2026Q00883908-S1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00883908-I1Open ↗
08/13/2026Q00883908-S5Open ↗
08/13/2026Q00883908-S1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT3
08/13/2026Q01352314-S1Open ↗
08/13/2026Q00883908-I1Open ↗
08/13/2026Q00883908-S1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026Q01352314-S1Open ↗
08/13/2026Q00883908-I1Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram1
08/13/2026Q00883908-S1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026Q00883908-S5Open ↗
08/13/2026Q00883908-I1Open ↗
08/13/2026Q00883908-S1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00883908-I1Open ↗
08/13/2026Q00883908-S5Open ↗
08/13/2026Q00883908-S1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01327446-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/13/2026Q00883908-I1Open ↗