← Back
Two stories - detached, small or mid-size
149-11 19 AVENUE
QUEENS · BIN 4105855
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,635 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar1p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ETNEAL REALTY NY309/13/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/05/2025$1.1M—Private party → ETERNAL REALTY NY LLC$703/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CELTIC WAY CONSULTING LLC405/29/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CELTIC WAY CONSULTING LLC9780105/29/2026
Building Lifecycle
All (34)Filed (4)Special Inspection (30)
05/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01379840-S2
05/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01379840-S1
05/29/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01379840-S3
05/28/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/30/2026
Special inspection requirement — Protection of exposed foundation insulation
04/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
Q01379840-I1
03/29/2026
Special inspection requirement — Energy Code Compliance Inspections
KAI HUANG
03/29/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/29/2026
Special inspection requirement — Mechanical Systems
03/29/2026
Special inspection requirement — Masonry
03/29/2026
Special inspection requirement — Structural Steel - Details
03/29/2026
Special inspection requirement — Concrete - Cast-In-Place
03/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/29/2026
Special inspection requirement — Heating Systems
03/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/29/2026
Special inspection requirement — Structural Steel - Welding
03/29/2026
Special inspection requirement — Subgrade Inspections
03/29/2026
Special inspection requirement — Final
03/29/2026
Special inspection requirement — Footing and Foundation
03/29/2026
Special inspection requirement — Energy Code Compliance Inspections
03/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/29/2026
Special inspection requirement — Structural Wood Frame
03/29/2026
Special inspection requirement — Fenestration air leakage
03/29/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/29/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/29/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/29/2026
Special inspection requirement — Insulation placement and R values
03/29/2026
Special inspection requirement — Fenestration areas
03/29/2026
Special inspection requirement — Permanent certificate
03/29/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/29/2026
Special inspection requirement — Metering
03/29/2026
Special inspection requirement — Ventilation and air distribution system
03/29/2026
Special inspection requirement — Electric vehicle service equipment requirements
Nothing on file for this building.
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
05/28/2026Subsurface Investigations (Borings/Test Pits)—special
04/30/2026Protection of exposed foundation insulation—energy_progress
03/29/2026Energy Code Compliance InspectionsKAI HUANGprogress
03/29/2026Structural Stability – Alterations of existing buildings—special
03/29/2026Mechanical Systems—special
03/29/2026Masonry—special
03/29/2026Structural Steel - Details—special
03/29/2026Concrete - Cast-In-Place—special
03/29/2026Fire-Resistant Penetrations and Joints—special
03/29/2026Heating Systems—special
03/29/2026Structural Steel - High Strength Bolting—special
03/29/2026Structural Steel - Welding—special
03/29/2026Subgrade Inspections—special
03/29/2026Final—progress
03/29/2026Footing and Foundation—progress
03/29/2026Energy Code Compliance Inspections—progress
03/29/2026Fire-Resistance Rated Construction—progress
03/29/2026Structural Wood Frame—progress
03/29/2026Fenestration air leakage—energy_progress
03/29/2026HVAC-R and service water heating system controls—energy_progress
03/29/2026HVAC-R and service water piping design and insulation—energy_progress
03/29/2026Fenestration and door U-factor and product ratings—energy_progress
03/29/2026Duct leakage testing, insulation and design—energy_progress
03/29/2026Insulation placement and R values—energy_progress
03/29/2026Fenestration areas—energy_progress
Latest 25 of 36.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026Q01379840-S1Request digital key ↗
08/16/2026Q01379840-S3Request digital key ↗
08/16/2026Q01379840-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01379840-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01379840-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026Q01379840-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026Q01379840-S1Open ↗
08/16/2026Q01379840-I1Open ↗
08/16/2026Q01379840-S3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01379840-S3Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026Q01379840-S3Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026Q01379840-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01379840-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/16/2026Q01379840-S1Open ↗
08/16/2026Q01379840-I1Open ↗
▸DOB NOWSOIL REPORT2
08/16/2026Q01379840-S1Open ↗
08/16/2026Q01379840-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01379840-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01379840-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01379840-I1Open ↗