← Back
Two stories - detached, small or mid-size
149-17 DELAWARE AVENUE
QUEENS · BIN 4122034
💬 Discuss this project
1915Year Built
2.5Stories
A1Building Class
R3XZoning
1,987 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction27p · 1 filing · 20 docs
Floor 1Under Construction29p · 1 filing · 20 docs
CellarUnder Construction38p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TLL CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/20/2024$1.2M—Private party → Private party$629/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC801/28/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 DESIGN1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LXC CONSTRUCTION INCGeneral Contractor407/08/2026
TLL CONSTRUCTION INCGeneral Contractor204/09/2026
KWONG MING ELECTRIC INCElectrical103/22/2026
PLUMBING NYC INCPlumbing107/08/2026
VILLAGE P & H NY INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373701/28/2026
TRIANGLE INSPECTION & TES7495401/28/2026
Building Lifecycle
All (58)Filed (8)Permit Issued (6)Signed Off (1)Violation (1)Inspection (8)Objection (4)Special Inspection (30)
09/08/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/04/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2026
Permit issued — Foundation
Q01129519-I1-GC-CX
06/01/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-S1
05/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/15/2026
Permit issued — Plumbing
Q20943957-I1-PL
03/10/2026
Permit issued — Construction Fence
Q01129519-S1-FN
03/10/2026
Violation issued (ECB, closed)
Construction
02/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
02/04/2026
Special inspection requirement — Structural Steel - Details
KY FU
02/04/2026
Special inspection requirement — Structural Steel - High Strength Bolting
KY FU
02/04/2026
Special inspection requirement — Chimneys and vents
KY FU
02/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KY FU
02/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
KY FU
02/04/2026
Special inspection requirement — Concrete - Cast-In-Place
KY FU
02/04/2026
Special inspection requirement — Mechanical Systems
KY FU
02/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
02/04/2026
Special inspection requirement — Final
KY FU
02/04/2026
Special inspection requirement — Footing and Foundation
KY FU
02/04/2026
Special inspection requirement — Energy Code Compliance Inspections
KY FU
02/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
KY FU
02/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
KY FU
02/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
KY FU
02/04/2026
Special inspection requirement — Ventilation and air distribution system
KY FU
02/04/2026
Special inspection requirement — Interior lighting power
KY FU
02/04/2026
Special inspection requirement — Air barrier - visual inspection
KY FU
02/04/2026
Special inspection requirement — Fenestration air leakage
KY FU
02/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
KY FU
02/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
KY FU
02/04/2026
Special inspection requirement — Maintenance information
KY FU
02/04/2026
Special inspection requirement — Fenestration areas
KY FU
02/04/2026
Special inspection requirement — Duct leakage testing, insulation and design
KY FU
02/04/2026
Special inspection requirement — Electric vehicle service equipment requirements
KY FU
02/04/2026
Special inspection requirement — Protection of exposed foundation insulation
KY FU
02/04/2026
Special inspection requirement — Permanent certificate
KY FU
02/04/2026
Special inspection requirement — Air barrier — testing
KY FU
02/04/2026
Special inspection requirement — Insulation placement and R values
KY FU
02/04/2026
Special inspection requirement — Masonry
KY FU
01/30/2026
Objection resolved — Addressed
01/30/2026
Objection resolved — Addressed
01/29/2026
Objection raised — Scope
01/29/2026
Objection raised — Inspections
01/28/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-P3
12/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/08/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/24/2025
Filed — Alteration
install plumbing fixtures in cellar, 1st and 2n dfl
Q01129521-P2
09/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-P2
09/10/2025
Filed — Alteration
install plumbing fixtures in cellar, 1st and 2n dfl
Q01129521-P1
05/05/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-P1
04/30/2025
Permit issued — General Construction
Q01129519-I1-GC-CX
04/17/2025
Permit issued — Plumbing
Q01129521-I1-PL
04/16/2025
Permit issued — Construction Fence
Q01129519-S1-FN
11/26/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-S1
11/26/2024
Filed — Alteration
install plumbing fixtures in cellar, 1st and 2n dfl
Q01129521-I1
11/25/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
vertical and horizontal extent existing one family and convert into two family, required new c of o for two family
Q01129519-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedLXC CONSTRUCTION INC06/04/2026
DOB NOWPlumbingSigned-offPLUMBING NYC INC04/15/2026
DOB NOWConstruction FenceSigned-offTLL CONSTRUCTION INC03/10/2026
DOB NOWGeneral ConstructionPermit IssuedLXC CONSTRUCTION INC04/30/2025
DOB NOWPlumbingSigned-offVILLAGE P & H NY INC04/17/2025
DOB NOWConstruction FenceSigned-offTLL CONSTRUCTION INC04/16/2025
1 project · most recent 01/28/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026Permit IssuedLXC CONSTRUCTION INCAir Conditioning Systems, Ventilation Systems
Cooling
Gree ×28
Ventilation
1 project · most recent 09/24/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/24/2025Signed-offVILLAGE P & H NY INCGas, Storm, Water/Sanitary
2 projects · most recent 04/25/2025
General Wiring
FiledStatusContractorScope
04/25/2025Permit IssuedKWONG MING ELECTRIC INCGeneral Wiring
04/11/2025CompleteKWONG MING ELECTRIC INC3 meters, 3 new_meters
1 project · most recent 01/28/2026
Steel Concrete Masonry
FiledStatusContractorScope
01/28/2026Permit IssuedLXC CONSTRUCTION INCSteel, Concrete, Masonry
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
09/08/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/04/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/30/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 134
DateRequirementInspectorRole
02/04/2026Concrete - Cast-In-PlaceKY FUspecial
02/04/2026Mechanical SystemsKY FUspecial
02/04/2026Fire-Resistant Penetrations and JointsKY FUspecial
02/04/2026FinalKY FUprogress
02/04/2026Footing and FoundationKY FUprogress
02/04/2026Energy Code Compliance InspectionsKY FUprogress
02/04/2026Fire-Resistance Rated ConstructionKY FUprogress
02/04/2026HVAC-R and service water heating equipmentKY FUenergy_progress
02/04/2026HVAC-R and service water piping design and insulationKY FUenergy_progress
02/04/2026Ventilation and air distribution systemKY FUenergy_progress
02/04/2026MasonryKY FUspecial
02/04/2026Interior lighting powerKY FUenergy_progress
02/04/2026Air barrier - visual inspectionKY FUenergy_progress
02/04/2026Fenestration air leakageKY FUenergy_progress
02/04/2026HVAC-R and service water heating system controlsKY FUenergy_progress
02/04/2026Fenestration and door U-factor and product ratingsKY FUenergy_progress
02/04/2026Maintenance informationKY FUenergy_progress
02/04/2026Fenestration areasKY FUenergy_progress
02/04/2026Duct leakage testing, insulation and designKY FUenergy_progress
02/04/2026Electric vehicle service equipment requirementsKY FUenergy_progress
02/04/2026Protection of exposed foundation insulationKY FUenergy_progress
02/04/2026Permanent certificateKY FUenergy_progress
02/04/2026Excavations - Sheeting, Shoring, and BracingKY FUspecial
02/04/2026Air barrier — testing KY FUenergy_progress
02/04/2026Insulation placement and R valuesKY FUenergy_progress
Latest 25 of 134.
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026Q01129521-P2Request digital key ↗
08/19/2026Q01129521-P1Request digital key ↗
08/19/2026Q01129521-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q01129519-P3Open ↗
08/13/2026Q01129519-P1Open ↗
08/13/2026Q01129519-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp4
08/13/2026Q01129519-I1Open ↗
08/13/2026Q01129519-P1Open ↗
08/13/2026Q01129519-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q01129519-P1Open ↗
08/13/2026Q01129519-P2Open ↗
08/13/2026Q01129519-P3Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications142
▸DOB NOWProgress Inspector Seal & Signature92
09/24/2026Q01129521-P2Open ↗
09/24/2026Q01129521-P2Open ↗
09/24/2026Q01129521-P2Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature42
09/24/2026Q01129521-P2Open ↗
09/23/2026Q01129519-P1Open ↗
09/23/2026Q01129519-P1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/19/2026Q01129521-I1Open ↗
08/19/2026Q01129521-P1Open ↗
08/13/2026Q01129519-P3Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q01129519-P2Open ↗
08/13/2026Q01129519-P1Open ↗
08/13/2026Q01129519-P3Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
06/26/2025440821210Open ↗
▸BISSTREET TREE CHECKLIST1
06/26/2025440821210Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01129519-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q01129519-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/19/2026Q01129521-I1Open ↗
08/19/2026Q01129521-P1Open ↗
08/13/2026Q01129519-P1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01129519-I1Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026Q01129519-P3Open ↗
08/13/2026Q01129519-P2Open ↗
08/13/2026Q01129519-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q01129519-P3Open ↗
08/13/2026Q01129519-P2Open ↗
08/13/2026Q01129519-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/13/2026Q01129519-P3Open ↗
08/13/2026Q01129519-P2Open ↗
08/13/2026Q01129519-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
06/26/2025440821210Open ↗
06/26/2025440821210Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01129519-I1Open ↗