← Back
Two family frame
149-25 17 ROAD
QUEENS · BIN 4105794
💬 Discuss this project
1930Year Built
2Stories
B2Building Class
R3AZoning
1,680 sfGross Floor Area
2Units
0 Open Violations
Two family frame · 3,000 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 210p · 2 filings · 20 docs
Floor 19p · 1 filing · 20 docs
Cellar9p · 1 filing · 20 docs
1 job · most recent 10/06/2021
Gas Water/Sanitary
FiledStatusContractorScope
10/06/2021Permit IssuedAAA TOTAL PLUMBING, INCGas, Water/Sanitary
Building Lifecycle
All (43)Filed (6)Permit Issued (5)Signed Off (1)Violation (2)Objection (6)Special Inspection (23)
12/19/2022
Signed off — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION WORK AS PER PLAN SUBMITTED. APPLY NEW ROOFING ON TOP OF EXISTING. PL WORK TO BE FILED UNDER DOBNow APPLICATION#: Q00461157. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00461155-I1
12/13/2022
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION WORK AS PER PLAN SUBMITTED. APPLY NEW ROOFING ON TOP OF EXISTING. PL WORK TO BE FILED UNDER DOBNow APPLICATION#: Q00461157. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00461155-P1
12/12/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
KO SHEK WONG
12/12/2022
Special inspection requirement — Concrete - Cast-In-Place
KO SHEK WONG
12/12/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KO SHEK WONG
12/12/2022
Special inspection requirement — Masonry
KO SHEK WONG
12/12/2022
Special inspection requirement — Energy Code Compliance Inspections
KO SHEK WONG
12/12/2022
Special inspection requirement — Final
KO SHEK WONG
12/12/2022
Special inspection requirement — Permanent certificate
KO SHEK WONG
12/12/2022
Special inspection requirement — Interior lighting power
KO SHEK WONG
12/12/2022
Special inspection requirement — Fenestration air leakage
KO SHEK WONG
12/12/2022
Special inspection requirement — Air barrier - visual inspection
KO SHEK WONG
12/12/2022
Special inspection requirement — Fenestration areas
KO SHEK WONG
08/08/2022
Permit issued — General Construction
Q00461155-I1-GC
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/06/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow JOB#: Q00461155. CAP & REMOVE HWH, OIL TANK & OIL BOILER AT CELLAR. INSTALL NEW COMBI-BOILER, 3-PIECES BATHROOM AT CEL; REPLACE KITCHEN & BATHROOM ON 1ST & 2ND FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00461157-P3
08/24/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow JOB#: Q00461155. CAP & REMOVE HWH, OIL TANK & OIL BOILER AT CELLAR. INSTALL NEW COMBI-BOILER, 3-PIECES BATHROOM AT CEL; REPLACE KITCHEN & BATHROOM ON 1ST & 2ND FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00461157-P2
08/23/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KO SHEK WONG
08/23/2021
Special inspection requirement — Energy Code Compliance Inspections
KO SHEK WONG
08/23/2021
Special inspection requirement — HVAC-R and service water heating equipment
KO SHEK WONG
08/23/2021
Special inspection requirement — HVAC-R and service water heating system controls
KO SHEK WONG
08/23/2021
Special inspection requirement — Maintenance information
KO SHEK WONG
08/23/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
KO SHEK WONG
08/11/2021
Permit issued — Plumbing
Q00461157-I1-PL
07/08/2021
Permit issued — General Construction
Q00461155-I1-GC
04/08/2021
Permit issued — Plumbing
Q00461157-I1-PL
03/22/2021
Permit issued — General Construction
Q00461155-I1-GC
03/11/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow JOB#: Q00461155. CAP & REMOVE HWH, OIL TANK & OIL BOILER AT CELLAR. INSTALL NEW COMBI-BOILER, 3-PIECES BATHROOM AT CEL; REPLACE KITCHEN & BATHROOM ON 1ST & 2ND FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00461157-P1
03/11/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
KO SHEK WONG
03/11/2021
Special inspection requirement — Maintenance information
KO SHEK WONG
03/11/2021
Special inspection requirement — HVAC-R and service water heating system controls
KO SHEK WONG
03/11/2021
Special inspection requirement — HVAC-R and service water heating equipment
KO SHEK WONG
03/11/2021
Special inspection requirement — Energy Code Compliance Inspections
KO SHEK WONG
03/11/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
KO SHEK WONG
03/03/2021
Objection resolved — Addressed
03/03/2021
Objection resolved — Addressed
02/22/2021
Filed — Alteration
FILE PLUMBING WORK IN-CONJUNCTION WITH DOBNow JOB#: Q00461155. CAP & REMOVE HWH, OIL TANK & OIL BOILER AT CELLAR. INSTALL NEW COMBI-BOILER, 3-PIECES BATHROOM AT CEL; REPLACE KITCHEN & BATHROOM ON 1ST & 2ND FL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00461157-I1
02/16/2021
Objection resolved — Addressed
02/12/2021
Objection raised — Scope
02/12/2021
Objection raised — Inspections
02/12/2021
Objection raised — Other
01/29/2021
Filed — Alteration
RENOVATE CELLAR, 1ST & 2ND FLOOR FOR AN EXISTING 2 STORY, 2 FAMILY HOUSE. NEW PARTITION WORK AS PER PLAN SUBMITTED. APPLY NEW ROOFING ON TOP OF EXISTING. PL WORK TO BE FILED UNDER DOBNow APPLICATION#: Q00461157. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Q00461155-I1
10/20/2003
Violation issued (ECB, closed)
Boilers
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/25/2020$900K—Private party → Private party$536/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WKS INC.612/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOOD-WILL MECHANICAL CORP.General Contractor407/08/2026
AAA TOTAL PLUMBING, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WKS INC.4521612/13/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offGOODWILL MECHANICAL08/08/2022
DOB NOWPlumbingPermit IssuedAAA TOTAL PLUMBING, INC08/11/2021
DOB NOWGeneral ConstructionSigned-offGOODWILL MECHANICAL07/08/2021
DOB NOWPlumbingPermit IssuedAAA TOTAL PLUMBING, INC04/08/2021
DOB NOWGeneral ConstructionSigned-offGOODWILL MECHANICAL03/22/2021
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/12/2022Fenestration and door U-factor and product ratingsKO SHEK WONGenergy_progress
12/12/2022Concrete - Cast-In-PlaceKO SHEK WONGspecial
12/12/2022Fire-Resistant Penetrations and JointsKO SHEK WONGspecial
12/12/2022MasonryKO SHEK WONGspecial
12/12/2022Energy Code Compliance InspectionsKO SHEK WONGprogress
12/12/2022FinalKO SHEK WONGprogress
12/12/2022Permanent certificateKO SHEK WONGenergy_progress
12/12/2022Interior lighting powerKO SHEK WONGenergy_progress
12/12/2022Fenestration air leakageKO SHEK WONGenergy_progress
12/12/2022Air barrier - visual inspectionKO SHEK WONGenergy_progress
12/12/2022Fenestration areasKO SHEK WONGenergy_progress
08/23/2021Fire-Resistant Penetrations and JointsKO SHEK WONGspecial
08/23/2021Energy Code Compliance InspectionsKO SHEK WONGprogress
08/23/2021HVAC-R and service water heating equipmentKO SHEK WONGenergy_progress
08/23/2021HVAC-R and service water heating system controlsKO SHEK WONGenergy_progress
08/23/2021Maintenance informationKO SHEK WONGenergy_progress
08/23/2021HVAC-R and service water piping design and insulationKO SHEK WONGenergy_progress
03/11/2021HVAC-R and service water piping design and insulationKO SHEK WONGenergy_progress
03/11/2021Maintenance informationKO SHEK WONGenergy_progress
03/11/2021HVAC-R and service water heating system controlsKO SHEK WONGenergy_progress
03/11/2021HVAC-R and service water heating equipmentKO SHEK WONGenergy_progress
03/11/2021Energy Code Compliance InspectionsKO SHEK WONGprogress
03/11/2021Fire-Resistant Penetrations and JointsKO SHEK WONGspecial
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch - Plumbing4
08/27/2026Q00461157-I1Request digital key ↗
08/15/2026Q00461157-P1Request digital key ↗
08/15/2026Q00461157-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/27/2026Q00461155-P1Request digital key ↗
08/15/2026Q00461155-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWRestrictive Declaration/Easement 16
08/13/2026Q00461157-P2Open ↗
08/13/2026Q00461155-I1Open ↗
08/13/2026Q00461157-P3Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature18
09/07/2026Q00461157-P2Open ↗
09/07/2026Q00461157-P2Open ↗
09/07/2026Q00461157-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/27/2026Q00461155-P1Open ↗
08/27/2026Q00461155-I1Open ↗
08/13/2026Q00461157-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/07/2026Q00461157-P2Open ↗
08/28/2026Q00461157-P1Open ↗
08/22/2026Q00461155-P1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/27/2026Q00461155-P1Open ↗
08/15/2026Q00461155-I1Open ↗
08/13/2026Q00461157-P2Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00461155-I1Open ↗