← Back
Two stories - detached, small or mid-size
149-26 15 ROAD
QUEENS · BIN 4105696
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R3AZoning
1,188 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,500 sf lot · 0.34 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/09/2021$870K—THANK YOU DADDY TRUST DTD 08/24/2020 → Private party$732/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC411/29/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
R & T ELECTRICAL CORPElectrical103/22/2026
PAN LINK CONSTRUCTION INCGeneral Contractor107/08/2026
YX CONSTRUCTION INCGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330411/29/2021
Building Lifecycle
All (39)Filed (4)Permit Issued (3)Signed Off (2)Inspection (6)Special Inspection (24)
05/06/2022
Signed off — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584625-I1
03/30/2022
Signed off — Alteration
INTERIOR RENOVATION AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584602-I1
02/28/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/25/2022
Permit issued — General Construction
Q00584602-I1-GC
02/02/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/03/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
12/03/2021
Special inspection requirement — Metering
Jinfar Liu
12/03/2021
Special inspection requirement — Lighting controls
Jinfar Liu
12/03/2021
Special inspection requirement — Interior lighting power
Jinfar Liu
12/03/2021
Special inspection requirement — Final
Jinfar Liu
12/03/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
11/29/2021
Filed — Alteration
INTERIOR RENOVATION AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584602-P1
11/26/2021
Special inspection requirement — Lighting controls
Jinfar Liu
11/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
11/26/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
11/26/2021
Special inspection requirement — Final
Jinfar Liu
11/26/2021
Special inspection requirement — Metering
Jinfar Liu
11/26/2021
Special inspection requirement — Interior lighting power
Jinfar Liu
10/22/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/22/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/18/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
10/18/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
10/18/2021
Special inspection requirement — Metering
Jinfar Liu
10/18/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
10/18/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
10/18/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
10/13/2021
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584625-P1
10/06/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Jinfar Liu
10/06/2021
Special inspection requirement — Energy Code Compliance Inspections
Jinfar Liu
10/06/2021
Special inspection requirement — Metering
Jinfar Liu
10/06/2021
Special inspection requirement — HVAC-R and service water heating system controls
Jinfar Liu
10/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
Jinfar Liu
10/06/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
09/17/2021
Permit issued — Plumbing
Q00584625-I1-PL
09/16/2021
Permit issued — General Construction
Q00584602-I1-GC
09/13/2021
Filed — Alteration
INSTALL PLUMBING FIXTURES AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584625-I1
09/13/2021
Filed — Alteration
INTERIOR RENOVATION AS SHOWN ON PLAN @ CELLAR, 1ST & 2ND FLOOR.
Q00584602-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPAN LINK CONSTRUCTION INC02/25/2022
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/17/2021
DOB NOWGeneral ConstructionSigned-offYX CONSTRUCTION INC09/16/2021
1 project · most recent 03/22/2022
General Wiring
FiledStatusContractorScope
03/22/2022CompleteR & T ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/28/2022Pass-Final General Construction Non-Directive 14PassView ↗
02/02/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/22/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/22/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/22/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
12/03/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
12/03/2021MeteringJinfar Liuenergy_progress
12/03/2021Lighting controlsJinfar Liuenergy_progress
12/03/2021Interior lighting powerJinfar Liuenergy_progress
12/03/2021FinalJinfar Liuprogress
12/03/2021Energy Code Compliance InspectionsJinfar Liuprogress
11/26/2021Lighting controlsJinfar Liuenergy_progress
11/26/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
11/26/2021Energy Code Compliance InspectionsJinfar Liuprogress
11/26/2021FinalJinfar Liuprogress
11/26/2021MeteringJinfar Liuenergy_progress
11/26/2021Interior lighting powerJinfar Liuenergy_progress
10/18/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
10/18/2021HVAC-R and service water heating system controlsJinfar Liuenergy_progress
10/18/2021MeteringJinfar Liuenergy_progress
10/18/2021HVAC-R and service water heating equipmentJinfar Liuenergy_progress
10/18/2021HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/18/2021Energy Code Compliance InspectionsJinfar Liuprogress
10/06/2021HVAC-R and service water piping design and insulationJinfar Liuenergy_progress
10/06/2021Energy Code Compliance InspectionsJinfar Liuprogress
10/06/2021MeteringJinfar Liuenergy_progress
10/06/2021HVAC-R and service water heating system controlsJinfar Liuenergy_progress
10/06/2021HVAC-R and service water heating equipmentJinfar Liuenergy_progress
10/06/2021Fire-Resistant Penetrations and JointsJinfar Liuspecial
▾Documents — 38 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00584625-I1Request digital key ↗
08/27/2026Q00584625-P1Request digital key ↗
08/27/2026Q00584602-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWProgress Inspector Seal & Signature20
09/26/2026Q00584625-I1Open ↗
09/26/2026Q00584625-I1Open ↗
09/26/2026Q00584625-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00584625-P1Open ↗
08/27/2026Q00584625-I1Open ↗
08/27/2026Q00584602-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/26/2026Q00584625-I1Open ↗
09/01/2026Q00584625-P1Open ↗
08/28/2026Q00584602-P1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00584625-P1Open ↗
08/27/2026Q00584625-I1Open ↗
08/27/2026Q00584602-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00584602-I1Open ↗
08/13/2026Q00584625-I1Open ↗