← Back
Factory, industrial, miscellaneous
149 34 STREET
BROOKLYN · BIN 3010166
💬 Discuss this project
1979Year Built
2Stories
F9Building Class
M1-2DZoning
7,800 sfGross Floor Area
2Units
1 Open Violation ▸
Factory, industrial, miscellaneous · Owner of record: 149 34TH STREET LLC · 6,007 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalFire Protection
Permit Issued — active, not yet Signed-off
Roof5p · 1 filing · 14 docs
Floor 2Under Construction3p · 2 filings · 20 docs
Floor 1Under Construction6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
149 34TH STREET HOLDCO709/07/2026
149 34TH STREET LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/04/2025$2.1M—Private party → 149 34TH STREET HOLDCO LLC$268/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSEN ENGINEERING, PC205/07/2026
KUSHNER STUDIOS304/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DACAJ HOME IMPROVEMENTGeneral Contractor109/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544305/07/2026
Building Lifecycle
All (52)Filed (5)Permit Issued (1)Violation (8)Objection (24)Special Inspection (14)
08/10/2026
Permit issued — General Construction
B01361186-I1-GC
05/07/2026
Filed — Alteration CO
CONVERSION OF EXISTING VEHICLE STORAGE ESTABLISHMENT & ACCESSORY COMMERCIAL OFFICE TO INDOOR ROCK CLIMBING FACILITY INCLUDING THE INSTALLATION NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01341186-I1
B01383432-S2
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/27/2026
Objection raised — Other
04/27/2026
Objection resolved — Resolved
04/22/2026
Filed — Alteration CO
CONVERSION OF EXISTING VEHICLE STORAGE ESTABLISHMENT & ACCESSORY COMMERCIAL OFFICE TO INDOOR ROCK CLIMBING FACILITY INCLUDING THE INSTALLATION NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01341186-I1
B01383432-S1
04/10/2026
Filed — Alteration CO
CONVERSION OF EXISTING VEHICLE STORAGE ESTABLISHMENT & ACCESSORY COMMERCIAL OFFICE TO INDOOR ROCK CLIMBING FACILITY INCLUDING THE INSTALLATION NEW FLOOR & WALL FINISHES AS PER THE DRAWINGS FILED HEREIN. FILED IN CONJUNCTION WITH GC #B01341186-I1
B01383432-I1
04/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Final
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
04/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
04/09/2026
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/24/2026
Objection resolved — Addressed
03/18/2026
Objection raised — Plumbing
03/13/2026
Filed — Alteration
B01361186-S1
03/04/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
03/04/2026
Objection resolved — Addressed
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
03/04/2026
Special inspection requirement — Maintenance information
EUGENE BIFULCO
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
EUGENE BIFULCO
03/02/2026
Objection raised — Fire_Protection
03/02/2026
Objection raised — Other
03/02/2026
Objection raised — Admin
03/02/2026
Objection raised — Cost
02/26/2026
Filed — Alteration
B01361186-I1
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/01/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/06/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/24/1993
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDACAJ HOME IMPROVEMENT08/10/2026
BISMHISSUEDBLUE DIAMOND F O CORP09/14/2006
BISBLISSUEDBLUE DIAMOND FUEL OIL CORP10/23/1998
BISMHISSUEDBLUE DIAMOND FUEL OIL CORP10/21/1997
1 project · most recent 11/26/2025
FiledStatusContractorScope
11/26/2025CompleteNYCO ELECTRIC CORP1 meters
1 project · most recent 05/07/2026
Steel
FiledStatusContractorScope
05/07/2026——Steel
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
04/09/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
04/09/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
04/09/2026FinalEUGENE BIFULCOprogress
04/09/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
04/09/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
04/09/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
04/09/2026Maintenance informationEUGENE BIFULCOenergy_progress
04/09/2026Mechanical SystemsEUGENE BIFULCOspecial
03/04/2026Energy Code Compliance InspectionsEUGENE BIFULCOprogress
03/04/2026Maintenance informationEUGENE BIFULCOenergy_progress
03/04/2026HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
03/04/2026HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
03/04/2026HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
03/04/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/18/2026B01361186-S1Request digital key ↗
08/18/2026B01361186-I1Request digital key ↗
08/17/2026B01383432-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026B01383432-S2Open ↗
08/17/2026B01383432-S1Open ↗
08/17/2026B01383432-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026B01383432-S1Open ↗
09/01/2026B01383432-S1Open ↗
08/23/2026B01361186-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01383432-S1Open ↗
08/23/2026B01361186-S1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01383432-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/17/2026B01383432-S2Open ↗
08/17/2026B01383432-S1Open ↗
08/17/2026B01383432-I1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/17/2026B01383432-I1Open ↗