← Back
BuildNYC
Multi-story retail building (2+)
149-42 CROSS ISLAND PARKWAY
QUEENS · BIN 4105659
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R3AZoning
2,484 sfGross Floor Area
1Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Multi-story retail building (2+) · Owner of record: 20-02 Utopia PKWY · 7,500 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofKitchens by Mittman4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kems Engineering and Construction407/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Lewsan Consulting803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Allegiance Plumbing & HeatingPlumbing207/08/2026
PJZ MaintenanceElectrical103/21/2026
Systematic ControlGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Gregory V. Perotto, P.E947407/21/2022
Building Lifecycle
All (38)Filed (4)Permit Issued (3)Signed Off (2)Violation (5)Objection (12)Special Inspection (12)
05/25/2023
Signed off — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-I1
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/22/2022
Special inspection requirement — HVAC and service water heating system controls
Steven Bendoraitis
07/22/2022
Special inspection requirement — HVAC and service water heating equipment
Steven Bendoraitis
07/22/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
07/22/2022
Special inspection requirement — HVAC insulation and sealing
Steven Bendoraitis
07/21/2022
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-P2
06/14/2022
Permit issued — Plumbing
Q00326268-I1-PL
08/05/2021
Objection resolved — Addressed
08/05/2021
Objection resolved — Addressed
06/01/2021
Objection raised — Other
06/01/2021
Objection raised — Other
04/08/2021
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-P1
03/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
03/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC and service water heating equipment
Steven Bendoraitis
03/30/2021
Special inspection requirement — Maintenance information
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC and service water heating system controls
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC insulation and sealing
Steven Bendoraitis
02/22/2021
Permit issued — Plumbing
Q00326268-I1-PL
02/11/2021
Signed off — Alteration
Replacement of five ton roof top HVAC unit.
Q00317131-I1
01/27/2021
Permit issued — Mechanical Systems
Q00317131-I1-MS
03/24/2020
Objection raised — Admin
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Energy
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Scope
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Zoning
03/24/2020
Objection resolved — Addressed
03/17/2020
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-I1
03/17/2020
Filed — Alteration
Replacement of five ton roof top HVAC unit.
Q00317131-I1
08/14/2000
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
08/14/2000
Violation issued (ECB, open)
Construction
10/11/1996
Violation issued (DOB, closed)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/29/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAllegiance Plumbing & Heating06/14/2022
DOB NOWPlumbingSigned-offAllegiance Plumbing & Heating02/22/2021
DOB NOWMechanical SystemsSigned-offSystematic Control01/27/2021
BISPLISSUEDCala/Sacco Mechanical11/14/2006
BISMHISSUEDSano Construction11/03/2006
BISPLISSUEDMonarch Mechanical12/29/1999
BIS—ISSUEDSano Construction03/15/1999
BIS—ISSUEDSano Construction12/15/1997
BIS—ISSUEDSano Construction04/23/1996
BISEQISSUEDSano Construction10/12/1994
BIS—ISSUEDSano Construction10/12/1994
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/22/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
07/22/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/22/2022HVAC and service water heating system controls Steven Bendoraitisenergy_progress
07/22/2022HVAC and service water heating equipment Steven Bendoraitisenergy_progress
07/22/2022Maintenance informationSteven Bendoraitisenergy_progress
07/22/2022HVAC insulation and sealing Steven Bendoraitisenergy_progress
03/30/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
03/30/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
03/30/2021HVAC and service water heating equipment Steven Bendoraitisenergy_progress
03/30/2021Maintenance informationSteven Bendoraitisenergy_progress
03/30/2021HVAC and service water heating system controls Steven Bendoraitisenergy_progress
03/30/2021HVAC insulation and sealing Steven Bendoraitisenergy_progress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Kitchens by MittmanRetailRoof
Project Q00317131 Alteration · LOC Issued · 03/17/2020
Project Q00326268 Alteration · LOC Issued · 03/17/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00326268-I1Request digital key ↗
08/28/2026Q00326268-P2Request digital key ↗
08/14/2026Q00326268-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00317131-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026Q00326268-P1Open ↗
08/25/2026Q00326268-P1Open ↗
08/25/2026Q00326268-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00326268-P1Open ↗
08/28/2026Q00326268-I1Open ↗
08/13/2026Q00326268-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00326268-P1Open ↗
08/23/2026Q00326268-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00326268-I1Open ↗
08/14/2026Q00326268-P1Open ↗
08/13/2026Q00326268-P2Open ↗
Showing 3 of 4 on file for this type