← Back
Multi-story retail building (2+)
149-42 CROSS ISLAND PARKWAY
QUEENS · Whitestone-Beechhurst · BIN 4105659
💬 Discuss this project
1931Year Built
2Stories
K2Building Class
R3AZoning
2,484 sfGross Floor Area
1Units
4 Open Violations 2 unresolved · 2 paperwork only ▸
Multi-story retail building (2+) · Owner of record: 20-02 UTOPIA PKWY LLC · 7,500 sf lot · 0.33 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Roof4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KITCHENS ETC INC DBA KITCHENS BY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KEMS ENGINEERING AND CONSTRUCTION407/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEWSAN CONSULTING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALLEGIANCE PLBG & HTG CORPlumbing207/08/2026
PHILIP ZUARDIElectrical103/21/2026
SYSTEMATIC CONTROL CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREGORY V. PEROTTO, P.E.947407/21/2022
Building Lifecycle
All (38)Filed (4)Permit Issued (3)Signed Off (2)Violation (5)Objection (12)Special Inspection (12)
05/25/2023
Signed off — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-I1
07/22/2022
Special inspection requirement — HVAC insulation and sealing
Steven Bendoraitis
07/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
07/22/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
07/22/2022
Special inspection requirement — HVAC and service water heating system controls
Steven Bendoraitis
07/22/2022
Special inspection requirement — HVAC and service water heating equipment
Steven Bendoraitis
07/22/2022
Special inspection requirement — Maintenance information
Steven Bendoraitis
07/21/2022
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-P2
06/14/2022
Permit issued — Plumbing
Q00326268-I1-PL
08/05/2021
Objection resolved — Addressed
08/05/2021
Objection resolved — Addressed
06/01/2021
Objection raised — Other
06/01/2021
Objection raised — Other
04/08/2021
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-P1
03/30/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Gregory Perotto
03/30/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC and service water heating equipment
Steven Bendoraitis
03/30/2021
Special inspection requirement — Maintenance information
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC and service water heating system controls
Steven Bendoraitis
03/30/2021
Special inspection requirement — HVAC insulation and sealing
Steven Bendoraitis
02/22/2021
Permit issued — Plumbing
Q00326268-I1-PL
02/11/2021
Signed off — Alteration
Replacement of five ton roof top HVAC unit.
Q00317131-I1
01/27/2021
Permit issued — Mechanical Systems
Q00317131-I1-MS
03/24/2020
Objection raised — Admin
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Energy
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Scope
03/24/2020
Objection resolved — Addressed
03/24/2020
Objection raised — Zoning
03/24/2020
Objection resolved — Addressed
03/17/2020
Filed — Alteration
Gas connection for direct replacement of one (1) HVAC unit on 1st floor roof.
Q00326268-I1
03/17/2020
Filed — Alteration
Replacement of five ton roof top HVAC unit.
Q00317131-I1
08/14/2000
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
08/14/2000
Violation issued (ECB, open)
Construction
10/11/1996
Violation issued (DOB, open)
VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE
04/29/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/1992
Violation issued (ECB, open)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALLEGIANCE PLBG & HTG COR06/14/2022
DOB NOWPlumbingSigned-offALLEGIANCE PLBG & HTG COR02/22/2021
DOB NOWMechanical SystemsSigned-offSYSTEMATIC CONTROL CORP01/27/2021
BISPLISSUEDCALA/SACCO MECHANICAL INC11/14/2006
BISMHISSUEDSANO CONSTRUCTION CORP.11/03/2006
BISPLISSUEDMONARCH MECHANICAL INC12/29/1999
BIS—ISSUEDSANO CONST. CORP03/15/1999
BIS—ISSUEDSANO CONST. CORP12/15/1997
BIS—ISSUEDSANO CONST. CORP04/23/1996
BISEQISSUEDSANO CONST.10/12/1994
BIS—ISSUEDSANO CONST. CORP10/12/1994
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 12
DateRequirementInspectorRole
07/22/2022HVAC insulation and sealing Steven Bendoraitisenergy_progress
07/22/2022Fire-Resistant Penetrations and JointsGregory Perottospecial
07/22/2022Energy Code Compliance InspectionsSteven Bendoraitisprogress
07/22/2022HVAC and service water heating system controls Steven Bendoraitisenergy_progress
07/22/2022HVAC and service water heating equipment Steven Bendoraitisenergy_progress
07/22/2022Maintenance informationSteven Bendoraitisenergy_progress
03/30/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
03/30/2021Energy Code Compliance InspectionsSteven Bendoraitisprogress
03/30/2021HVAC and service water heating equipment Steven Bendoraitisenergy_progress
03/30/2021Maintenance informationSteven Bendoraitisenergy_progress
03/30/2021HVAC and service water heating system controls Steven Bendoraitisenergy_progress
03/30/2021HVAC insulation and sealing Steven Bendoraitisenergy_progress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch - Plumbing3
08/28/2026Q00326268-I1Request digital key ↗
08/28/2026Q00326268-P2Request digital key ↗
08/14/2026Q00326268-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026Q00317131-I1Request digital key ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature10
08/25/2026Q00326268-P1Open ↗
08/25/2026Q00326268-P1Open ↗
08/25/2026Q00326268-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/28/2026Q00326268-P1Open ↗
08/28/2026Q00326268-I1Open ↗
08/13/2026Q00326268-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q00326268-P1Open ↗
08/23/2026Q00326268-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026Q00326268-I1Open ↗
08/14/2026Q00326268-P1Open ↗
08/13/2026Q00326268-P2Open ↗
Showing 3 of 4 on file for this type