← Back
BuildNYC
Elevator cooperative
Murray Hill House
149-45 NORTHERN BOULEVARD · BIN 4113262
💬 Discuss this project
1959Year Built
6Stories
D4Building Class
R6AZoning
—Gross Floor Area
146Units
0 Active ViolationsFISP: SAFE
Elevator cooperative · Owner of record: Murray Hill House Owners · 3.22 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofVentura Land CORP1p · 2 filings · 20 docs
Floor 6Unit 6V2p · 2 filings · 20 docs
Floor 5
Floor 4
Floor 3
Floor 2Ventura Land CORP1p · 1 filing · 7 docs
Floor 1Ventura Land CORPUnder Construction2 filings · 16 docs
Sub-BasementVentura Land CORP3p · 2 filings · 10 docs
Site & exteriorVentura Land CORP21p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Ventura Land3010/14/2026
Murray Hill House Owners2103/22/2026
Northern Ventura1403/21/2026
Aggressive103/21/2026
Mhhoc103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group203/21/2026
HS Design Studio203/21/2026
Philip Toscano Architects203/21/2026
Poseidon Expediting & Consulting SE603/21/2026
CH Building Consultants1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Construction ManagementGeneral Contractor610/07/2026
Central Construction ManagementScaffold607/08/2026
Rosmil Tile & Painting Cospecialty_contractor207/08/2026
Caputek Electrical ServicesElectrical203/21/2026
Site Structural ServicesGeneral Contractor107/08/2026
TristruxGeneral Contractor107/08/2026
Yates Exterior Restorationspecialty_contractor110/14/2026
DPH Plumbing & HeatingPlumbing107/08/2026
Applied ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Jose A Santos PE3292207/30/2026
Cataldo Engineering2174211/25/2025
Centerline Engineering SE8695209/19/2024
Jeremy K McKeon, P.E7263209/19/2024
Building Lifecycle
All (121)Filed (15)Permit Issued (19)Signed Off (6)Facade (FISP) (6)Violation (60)Special Inspection (15)
10/13/2026
Permit issued — Structural
Q01392725-I1-GC-CX
10/06/2026
Permit issued — Structural
Q01392725-I1-GC-CX
08/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Jose Santos
08/27/2026
Special inspection requirement — Final
Rilder Mejia
08/27/2026
Special inspection requirement — Masonry
Jose Santos
08/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jose Santos
07/30/2026
Filed — Alteration
PROPOSE TO INSTALL A CONCRETE ADA RAMP AND WALKWAY AT THE BUILDING'S MAIN ENTRANCE AS PER PLANS SUBMITTED HEREWITH.
Q01392725-P1
07/27/2026
Special inspection requirement — Final
Rilder Mejia
07/27/2026
Special inspection requirement — Concrete - Cast-In-Place
Jose Santos
07/27/2026
Special inspection requirement — Masonry
Jose Santos
07/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
07/15/2026
Violation issued (HPD, closed)
C
06/13/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, closed)
C
06/05/2026
Violation issued (HPD, closed)
B
05/04/2026
Filed — Alteration
PROPOSE TO INSTALL A CONCRETE ADA RAMP AND WALKWAY AT THE BUILDING'S MAIN ENTRANCE AS PER PLANS SUBMITTED HEREWITH.
Q01392725-I1
03/25/2026
Violation issued (HPD, closed)
C
03/17/2026
Violation issued (HPD, closed)
B
03/17/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
C
02/09/2026
Violation issued (HPD, closed)
A
01/26/2026
Violation issued (HPD, closed)
C
01/26/2026
Violation issued (HPD, closed)
A
01/26/2026
Violation issued (HPD, closed)
B
01/26/2026
Violation issued (HPD, closed)
C
12/24/2025
Signed off — Alteration
EXTERIOR FACADE REPAIRS TO EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00866128-I1
12/20/2025
Cycle 10 facade report submitted
12/20/2025
Cycle 10 facade report signed — SAFE
12/12/2025
Cycle 10 facade inspection completed
11/28/2025
Special inspection requirement — Masonry
Thomas Cataldo
11/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Thomas Cataldo
11/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Cataldo
11/28/2025
Special inspection requirement — Energy Code Compliance Inspections
Thomas Cataldo
11/28/2025
Special inspection requirement — Air barrier - visual inspection
PHILIP TOSCANO
11/28/2025
Special inspection requirement — Final
Thomas Cataldo
11/25/2025
Filed — Alteration
EXTERIOR FACADE REPAIRS TO EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q00866128-P1
11/10/2025
Signed off — Alteration
CD5 Amendment (Adding outrigger beam configurations)
Q00976003-I1
08/07/2025
Permit issued — General Construction
Q00866128-I1-GC
07/30/2025
Violation issued (HPD, closed)
C
07/30/2025
Violation issued (HPD, closed)
B
07/30/2025
Violation issued (HPD, closed)
C
05/22/2025
Violation issued (HPD, closed)
C
05/01/2025
Permit issued — Supported Scaffold
Q01052098-I1-SF
03/05/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/22/2025
Violation issued (HPD, closed)
B
02/22/2025
Violation issued (HPD, closed)
B
01/31/2025
Signed off — Alteration
Dish - Installation of new steel platform with related cabinets on lower roof. Installation of new antenna sectors with RRH units and GPS on roof. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
Q00831570-I1
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/16/2025
Filed — Alteration
Installation of a sidewalk shed
Q01168093-I1
01/16/2025
Permit issued — Sidewalk Shed
Q01168093-I1-SH
01/06/2025
Permit issued — Suspended Scaffold
Q00976003-I1-SC
12/17/2024
Violation issued (ECB, closed)
Unknown
12/05/2024
Violation issued (ECB, closed)
Construction
11/27/2024
Violation issued (ECB, closed)
Unknown
11/27/2024
Violation issued (ECB, closed)
Construction
11/10/2024
Violation issued (HPD, closed)
C
11/07/2024
Permit issued — Antenna
Q00831570-I1-AN
10/02/2024
Violation issued (HPD, closed)
B
10/02/2024
Violation issued (HPD, closed)
C
09/19/2024
Filed — Alteration
Dish - Installation of new steel platform with related cabinets on lower roof. Installation of new antenna sectors with RRH units and GPS on roof. Related service connection. All work in compliance with TPPN 5/98. No change to occupancy, use, or egress
Q00831570-P1
Latest 60 of 121 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedYates Exterior Restoration10/13/2026
DOB NOWStructuralPermit IssuedCentral Construction Management10/06/2026
DOB NOWGeneral ConstructionSigned-offCentral Construction Management08/07/2025
DOB NOWSupported ScaffoldPermit IssuedCentral Construction Management05/01/2025
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management01/16/2025
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management01/06/2025
DOB NOWAntennaSigned-offTristrux11/07/2024
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management08/01/2024
DOB NOWGeneral ConstructionSigned-offCentral Construction Management07/31/2024
DOB NOWSupported ScaffoldPermit IssuedCentral Construction Management05/16/2024
DOB NOWSuspended ScaffoldPermit IssuedCentral Construction Management12/29/2023
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management08/29/2023
DOB NOWGeneral ConstructionSigned-offCentral Construction Management08/29/2023
DOB NOWGeneral ConstructionSigned-offCentral Construction Management07/12/2023
DOB NOWAntennaSigned-offSite Structural Services05/23/2023
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management04/04/2023
DOB NOWGeneral ConstructionSigned-offRosmil Tile & Painting Co05/10/2021
DOB NOWPlumbingSigned-offDPH Plumbing & Heating04/21/2021
DOB NOWGeneral ConstructionSigned-offRosmil Tile & Painting Co02/04/2021
BISMHISSUEDRosmil Tile & Painting Co01/31/2018
BISOTISSUEDRosmil Tile & Painting Co01/26/2018
BISOTISSUEDRosmil Tile & Painting Co08/07/2017
BISOTISSUEDSquan Construction Services05/08/2017
BISOTISSUEDRosmil Tile & Painting Co03/13/2017
BISOTISSUEDRosmil Tile & Painting Co02/10/2017
BISOTISSUEDAggressive Heating10/07/2016
BISPLISSUEDThe Plumbing & Heating Specialist02/12/2016
BISOTISSUEDViderel Interior Plus02/02/2016
BISPLISSUEDWard Plumbing02/11/2015
BISOTISSUEDRCD Restorations08/29/2014
BISEQISSUEDSteel Systems05/09/2014
BISOTISSUEDEM & EM Chimney and Mason11/14/2013
BISBLISSUEDAggressive Heating10/30/2013
BISPLISSUEDWard Plumbing10/30/2013
BISOTISSUEDRCD Restorations09/06/2013
BISOTISSUEDRCD Restorations08/02/2013
BISEQISSUEDSteel Systems07/22/2013
BISOTISSUEDApplied Electric04/21/2004
BIS—ISSUEDMurray Hill House Owners04/08/1998
4 projects · most recent 11/29/2024
General Wiring
FiledStatusContractorScope
11/29/2024CompleteDaven ElectricGeneral Wiring
04/08/2024CompleteR.C.M. Electric—
04/27/2023Permit IssuedRedgrave Electl Maintnce147 meters, 1 new_meters
04/04/2023CompleteTop Shelf Electric—
1 project · most recent 07/30/2026
Concrete Masonry
FiledStatusContractorScope
07/30/2026Permit IssuedYates Exterior RestorationConcrete, Masonry
2 projects · most recent 01/16/2025
Sidewalk Shed
FiledStatusContractorScope
01/16/2025Permit IssuedCentral Construction ManagementSidewalk Shed
12/12/2023Permit IssuedCentral Construction ManagementSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
08/27/2026Concrete - Cast-In-PlaceJose Santosspecial
08/27/2026FinalRilder Mejiaprogress
08/27/2026MasonryJose Santosspecial
08/27/2026Tenant Protection Plan ComplianceJose Santosspecial
07/27/2026FinalRilder Mejiaprogress
07/27/2026Concrete - Cast-In-PlaceJose Santosspecial
07/27/2026MasonryJose Santosspecial
07/27/2026Tenant Protection Plan Compliance—special
11/28/2025MasonryThomas Cataldospecial
11/28/2025Structural Stability – Alterations of existing buildingsThomas Cataldospecial
11/28/2025Tenant Protection Plan ComplianceThomas Cataldospecial
11/28/2025Energy Code Compliance InspectionsThomas Cataldoprogress
11/28/2025Air barrier - visual inspectionPHILIP TOSCANOenergy_progress
11/28/2025FinalThomas Cataldoprogress
03/04/2021Finalmartin heroprogress
▾Documents — 287 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/27/2026Q00480790-I1Request digital key ↗
08/24/2026Q00831570-P1Request digital key ↗
08/24/2026Q00831570-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
08/27/2026Q00445488-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00447123-I1Request digital key ↗
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION20
09/27/2019440535814Open ↗
02/01/2018421257231Open ↗
01/29/2018421257231Open ↗
Showing 3 of 20 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION16
04/08/2019420874904Open ↗
03/18/2019420874904Open ↗
02/25/2019440535814Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications75
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION28
05/24/2019420874904Open ↗
10/25/2018421257231Open ↗
10/25/2018421257231Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00445488-I1Open ↗
08/24/2026Q00831570-P1Open ↗
08/24/2026Q00831570-I1Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
10/25/2018421257231Open ↗
12/05/2016421406632Open ↗
01/05/2016421252094Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
02/25/2019440535814Open ↗
10/19/2017421257231Open ↗
12/05/2016421406632Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
10/12/2026Q01392725-P1Open ↗
09/02/2026Q00480790-I1Open ↗
08/27/2026Q01392725-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
10/12/2026Q01392725-P1Open ↗
08/27/2026Q01392725-I1Open ↗
08/27/2026Q01392725-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
02/25/2019440535814Open ↗
09/30/2016440345315Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/25/2019440535814Open ↗
09/30/2016440345315Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/27/2016440241837Open ↗
▸Trade Schedules & Equipment9
▸BISSELF-CERT PLUMBING NOTICE3
07/17/2015420906844Open ↗
03/26/2015420906844Open ↗
10/17/2014420906844Open ↗
▸BISSCHEDULE B - PLUMBING2
02/25/2019440535814Open ↗
11/04/2013420906844Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
07/17/2015420906844Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
11/04/2013420906844Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/02/2017440241837Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/05/2016421252094Open ↗
▸Safety & Tenant Protection5
▸BISTenant Protection Plan and Notes5
11/01/2017421257231Open ↗
04/03/2017421462660Open ↗
03/08/2017440241837Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos28
▸BISASBESTOS: CERTIFICATION (DEP ACP5)7
10/19/2017421257231Open ↗
04/03/2017421462660Open ↗
12/05/2016421406632Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice to Proceed6
08/13/2026Q00447123-I1Open ↗
08/13/2026Q00866128-I1Open ↗
08/13/2026Q00480790-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWOER: Notice of Satisfaction5
08/13/2026Q00866128-P1Open ↗
08/13/2026Q00866128-I1Open ↗
08/13/2026Q00480790-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00445488-I1Open ↗
08/24/2026Q00831570-I1Open ↗
08/24/2026Q00831570-P1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
02/25/2019440535814Open ↗
10/31/2017421257231Open ↗
01/22/2016421252094Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026Q00866128-I1Open ↗
▸Energy Compliance35
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
05/24/2019420874904Open ↗
10/25/2018421257231Open ↗
08/03/2018421462660Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
05/24/2019420874904Open ↗
10/25/2018421257231Open ↗
08/03/2018421462660Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
02/25/2019440535814Open ↗
09/30/2016440345315Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
02/25/2019440535814Open ↗
01/27/2016440241837Open ↗
▸BISNYCECC ANALYSIS1
02/25/2019440535814Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
02/25/2019440535814Open ↗
01/27/2016440241837Open ↗
▸Approvals, Objections & Sign-offs33
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
06/03/2019421257231Open ↗
05/24/2019420874904Open ↗
03/11/2019421257231Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION11
06/03/2019421257231Open ↗
08/03/2018421462660Open ↗
03/23/2018440241837Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
12/15/2016421406632Open ↗
01/05/2016421252094Open ↗
11/20/2013420922835Open ↗
Showing 3 of 6 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT21
05/24/2019420874904Open ↗
02/25/2019440535814Open ↗
10/25/2018421257231Open ↗
Showing 3 of 21 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
05/08/2017440241837Open ↗
10/05/2016440345315Open ↗
▸Filing & Intake Forms22
▸BISEFILING COVER SHEET9
10/19/2017421257231Open ↗
04/03/2017421462660Open ↗
03/08/2017440241837Open ↗
Showing 3 of 9 on file for this type
▸BISBOROUGH INTAKE FORM7
03/23/2019421257231Open ↗
03/23/2018440241837Open ↗
03/23/2018440241837Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION4
05/28/2019421257231Open ↗
05/02/2017440241837Open ↗
09/19/2016420874904Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
02/25/2019440535814Open ↗
09/30/2016440345315Open ↗
▸Other Documents4
▸BISGAS WELDER ANNUAL CERT : GAS-WELD1
10/17/2014420906844Open ↗
▸BISDHCR DOCUMENT1
02/25/2019440535814Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026Q00976003-I1Open ↗
▸DOB NOWCalculations1
08/13/2026Q00976003-I1Open ↗