Two family frame
149-48 256 STREET
QUEENS · Rosedale · BIN 4290714
💬 Discuss this project
1950Year Built
2Stories
B2Building Class
R3-1Zoning
2,181 sfGross Floor Area
2Units
Two family frame · 3,000 sf lot · 0.73 FAR built · Flood zone X500
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/10/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/15/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/10/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
07/14/2026
Permit issued — Solar
Q01425947-I1-SL
07/10/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01425947-I1
07/10/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/10/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/02/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC07/14/2026
1 project · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026Permit IssuedSUNRUN SOLAR ELECTL CORPGeneral Wiring
1 project · most recent 07/10/2026
FiledStatusContractorScope
07/10/2026Permit IssuedSUNRUN INSTALLATION SVC19 panels, 8.55 kw, 399.43 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/10/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/10/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
07/02/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/02/2026Energy Code Compliance InspectionsWalid Abdullaprogress
07/02/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01425947-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026Q01425947-I1Open ↗
08/23/2026Q01425947-I1Open ↗
08/23/2026Q01425947-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026Q01425947-I1Open ↗
08/23/2026Q01425947-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01425947-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01425947-I1Open ↗