ECB05/11/20202ND AND 3RD FLOOR WINDOWS AT FRONT AND RIGHT SIDE ARE REPLACED WITH SMALLER SIZES. CLOSED ONE CELLAR WINDOW .OBSERVED NEW ELECTRICAL AND MECHANICAL WORK AT REAR AND LEFT SIDE EXTERIOR WALL. 80% WORK COMPLETED FNothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 2,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.