← Back
One story - permanent living quarter
149-60 17 ROAD
QUEENS · BIN 4105837
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
R3AZoning
1,126 sfGross Floor Area
1Units
1 Open Violation ▸
One story - permanent living quarter · Owner of record: 6504 80TH STREET LLC · 3,500 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction4p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction9p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/29/2025$850K—6504 80TH STREET LLC → Private party$755/sf building
07/14/2025$775K—Private party → 6504 80TH STREET LLC$688/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRIAN ILL DEVELOPMENT LLC302/10/2026
AMERILAND BROOK LLC212/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
GOLDEN TIME CONTRACTING IGeneral Contractor307/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BRIAN ILL DEVELOPMENT LLC1402102/10/2026
AMERILAND BROOK LLC1506212/07/2025
Building Lifecycle
All (13)Filed (5)Permit Issued (4)Violation (1)Inspection (3)
07/24/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/20/2026
Violation issued (ECB, open)
Unknown
04/17/2026
Permit issued — Plumbing
Q01329927-S3-PL
04/07/2026
Permit issued — Mechanical Systems
Q01329927-I1-GC-CX
04/06/2026
Permit issued — Support of Excavation
Q01329927-S2-SE
03/17/2026
Permit issued — Construction Fence
Q01329927-S1-FN
02/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q01329927-S3
02/10/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q01329927-S4
12/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q01329927-S1
12/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q01329927-I1
12/07/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
VERTICAL & HORIZONTAL EXTENSION OF EXISTING ONE FAMILY AND CONVERTING TO TWO FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q01329927-S2
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedWASOFF PLBG & UTILITY CO04/17/2026
DOB NOWMechanical SystemsPermit IssuedGOLDEN TIME CONTRACTING I04/07/2026
DOB NOWSupport of ExcavationPermit IssuedGOLDEN TIME CONTRACTING I04/06/2026
DOB NOWConstruction FencePermit IssuedGOLDEN TIME CONTRACTING I03/17/2026
1 project · most recent 02/10/2026
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/10/2026Permit IssuedGOLDEN TIME CONTRACTING IHeating Systems
Heating
Rheem PROPE50 M2 RH92 CS 40,000 BTU · Electric Heater ×3
1 project · most recent 04/14/2026
General Wiring
FiledStatusContractorScope
04/14/2026Permit IssuedSWITCH ELECT OF THE FIVEGeneral Wiring
1 project · most recent 02/10/2026
Steel Concrete Masonry Wood
FiledStatusContractorScope
02/10/2026Permit IssuedWASOFF PLBG & UTILITY COSteel, Concrete, Masonry, Wood
1 project · most recent 02/10/2026
Fence
FiledStatusContractorScope
02/10/2026Permit IssuedWASOFF PLBG & UTILITY COFence
1 project · most recent 02/10/2026
Earthwork
FiledStatusContractorScope
02/10/2026Permit IssuedWASOFF PLBG & UTILITY COEarthwork
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/24/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/24/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
01/05/2026Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
12/06/2025Mechanical SystemsXIAOHONG ZHAOspecial
12/06/2025Concrete - Cast-In-PlaceXIAOHONG ZHAOspecial
12/06/2025Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
12/06/2025Heating SystemsXIAOHONG ZHAOspecial
12/06/2025Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
12/06/2025Structural Steel - WeldingXIAOHONG ZHAOspecial
12/06/2025Subgrade InspectionsXIAOHONG ZHAOspecial
12/06/2025MasonryXIAOHONG ZHAOspecial
12/06/2025Structural Steel - DetailsXIAOHONG ZHAOspecial
12/06/2025FinalBRIAN ILLprogress
12/06/2025Footing and FoundationXIAOHONG ZHAOprogress
12/06/2025Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
12/06/2025Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
12/06/2025Structural Wood FrameXIAOHONG ZHAOprogress
12/06/2025Air barrier — testing XIAOHONG ZHAOenergy_progress
12/06/2025Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
12/06/2025Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
12/06/2025Fenestration areasXIAOHONG ZHAOenergy_progress
12/06/2025Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
12/06/2025Interior lighting powerXIAOHONG ZHAOenergy_progress
12/06/2025Permanent certificateXIAOHONG ZHAOenergy_progress
12/06/2025HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
12/06/2025Maintenance informationXIAOHONG ZHAOenergy_progress
12/06/2025HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
Latest 25 of 32.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/17/2026Q01329927-I1Request digital key ↗
08/17/2026Q01329927-S1Request digital key ↗
08/17/2026Q01329927-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q01329927-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01329927-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01329927-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/17/2026Q01329927-S2Open ↗
08/17/2026Q01329927-S1Open ↗
08/17/2026Q01329927-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026Q01329927-I1Open ↗
08/26/2026Q01329927-I1Open ↗
08/26/2026Q01329927-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026Q01329927-I1Open ↗
08/26/2026Q01329927-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/17/2026Q01329927-I1Open ↗
08/17/2026Q01329927-S3Open ↗
08/17/2026Q01329927-S2Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01329927-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01329927-I1Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01329927-S2Open ↗
08/13/2026Q01329927-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01329927-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01329927-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/17/2026Q01329927-I1Open ↗