← Back
BuildNYC
Two stories - detached, small or mid-size
149 79TH STREET
BROOKLYN · Bay Ridge · BIN 3150225
💬 Discuss this project
1925Year Built
2.5Stories
A1Building Class
R4AZoning
1,536 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,870 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 6 docs
Floor 21 filing · 6 docs
Floor 11 filing · 6 docs
Cellar1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/28/2025$1.6M—Private party → Private party$1,073/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
J&R Design and Inspection205/06/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HTX Building Consulting203/21/2026
Building Lifecycle
06/09/2025
Objection resolved — Addressed
06/06/2025
Objection resolved — Addressed
05/27/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Plumbing
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Nothing on file for this building.
1 project · most recent 05/06/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/06/2025——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
05/06/2025HVAC-R and service water piping design and insulation—energy_progress
05/06/2025HVAC-R and service water heating system controls—energy_progress
05/06/2025HVAC-R and service water heating equipment—energy_progress
05/06/2025Energy Code Compliance Inspections—progress
05/06/2025Fire-Resistance Rated Construction—progress
05/06/2025Fenestration and door U-factor and product ratings—energy_progress
05/06/2025Air barrier - visual inspection—energy_progress
05/06/2025Fenestration air leakage—energy_progress
05/06/2025Interior lighting power—energy_progress
05/06/2025Fenestration areas—energy_progress
05/06/2025Insulation placement and R values—energy_progress
05/06/2025Fire-Resistant Penetrations and Joints—special
05/05/2025Structural Stability – Alterations of existing buildings—special
05/05/2025Fire-Resistant Penetrations and Joints—special
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account