← Back
BuildNYC
Two stories - detached, small or mid-size
149 ARLINGTON AVENUE
STATEN ISLAND · BIN 5028430
💬 Discuss this project
1901Year Built
2.5Stories
A1Building Class
R3XZoning
1,840 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 7,150 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRoof mounted solar energy system installationUnder Construction2p · 2 filings · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering101/12/2026
Parker and West Engineering104/25/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sunrun103/21/2026
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
D.R.P. Electrical ContractingElectrical103/22/2026
NYSSspecialty_contractor106/28/2026
Sunrun Installation Servicespecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841101/12/2026
Parker and West Engineering5272104/25/2025
Building Lifecycle
05/06/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
S01211890-I1-SL
01/21/2026
Permit issued — Solar
S01341605-I1-SL
01/12/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01341605-I1
01/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
01/12/2026
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
15 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedNYSS01/21/2026
DOB NOWSolarPermit IssuedSunrun Installation Service05/06/2025
3 projects · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026Permit IssuedNY Solar Electrical—
04/25/2025Permit IssuedSunrun Solar Electl—
03/13/2025CompleteD.R.P. Electrical Contracting—
2 projects · most recent 01/12/2026
FiledStatusContractorScope
01/12/2026Permit IssuedNYSS—
04/25/2025Permit IssuedSunrun Installation Service—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/12/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
01/12/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
01/02/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
01/02/2026Energy Code Compliance InspectionsROBERT MASONEprogress
01/02/2026FinalROBERT MASONEprogress
04/16/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
04/16/2025Energy Code Compliance InspectionsWalid Abdullaprogress
04/16/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/16/2025FinalWalid Abdullaprogress
04/16/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
14 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account