2 Open Violations 1 unresolved · 1 paperwork only▸
ECB02/09/2026FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED MERCHANDISE/PRODUCT LIFT CABLE HAS FAILED ALLOWING LIFT TO DROP APPROXIMATELY 10'-15' TO CELLAR., REPAIR AND/REPLACE$2K due
ECB02/09/20261) OPERATING A MATERIAL LIFT DEVICE ILLEGALLY. 2) REPAIRING AN MATERIAL LIFT DEVICE WITH OUT A LICENSE COMPANY, OBTAIN PERMIT; 1) OBTAIN A LICENSE COMPANY TO REPAIR THE DEVICE AND PERFORM AN ACCEPTANCE TEST WITHearing held — result not yet published$6K proposed
One story retail building · 958 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.