← Back
Two family brick
1490 OCEAN PARKWAY
BROOKLYN · BIN 3173781
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R6AZoning
2,760 sfGross Floor Area
2Units
Two family brick · Owner of record: HABAYIT BUILDING LLC · 4,500 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Floor 51p · 1 filing · 5 docs
Floor 41p · 1 filing · 5 docs
Floor 31p · 1 filing · 5 docs
Floor 21p · 1 filing · 5 docs
Floor 11p · 1 filing · 5 docs
1 job · most recent 01/23/2026
FiledStatusContractorScope
01/23/2026——1 scope_items
1 job · most recent 01/23/2026
Fence
FiledStatusContractorScope
01/23/2026——Fence
Building Lifecycle
All (35)Filed (3)Objection (2)Special Inspection (30)
04/28/2026
Objection raised — Other
03/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED TO PROPOSED HORIZONTAL AND VERTICAL EXTENSION OF EXISTING 2-STORY,2-FAMILY DWELLING UNITS. TO PROPOSED COMMUNITY FACILITY (SYNAGOGUE) ON FIRST AND RESIDENTIAL UNITS FROM SECOND TO SEVENTH FLOORS FOR A TOTAL OF 12 DWELLING UNITS.
B01377300-I1
03/25/2026
Special inspection requirement — Exterior lighting power
03/25/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
03/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
03/25/2026
Special inspection requirement — Energy Code Compliance Inspections
03/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
03/25/2026
Special inspection requirement — Maintenance information
03/25/2026
Special inspection requirement — Air barrier — testing
03/25/2026
Special inspection requirement — Interior lighting power
03/25/2026
Special inspection requirement — Metering
03/25/2026
Special inspection requirement — Lighting controls
03/25/2026
Special inspection requirement — Lighting in dwelling units
03/25/2026
Special inspection requirement — Electrical motors and elevators
03/24/2026
Special inspection requirement — Fenestration areas
03/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
03/24/2026
Special inspection requirement — Insulation placement and R values
03/24/2026
Special inspection requirement — Air barrier - visual inspection
03/24/2026
Special inspection requirement — Fenestration air leakage
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/18/2026
Objection raised — Admin
02/26/2026
Filed — Alteration CO
Application filed herewith to propose horizontal and vertical extension of an existing two story two family dwelling units to proposed community facility (synagogue) on first and residential units from second to seventh floors for a total of 7 units.
B01351533-I1
02/26/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMED MAHMOUD
02/26/2026
Special inspection requirement — Concrete - Cast-In-Place
MOHAMED MAHMOUD
02/26/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
MOHAMED MAHMOUD
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Air barrier - visual inspection
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Fenestration areas
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Lighting controls
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Electrical motors and elevators
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Maintenance information
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Metering
MOHAMED MAHMOUD
02/25/2026
Special inspection requirement — Lighting in dwelling units
MOHAMED MAHMOUD
01/23/2026
Filed — Alteration
Herewith filing for an 8' plywood construction fene.
B01350318-I1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/03/2023$2.5M—— → —$888/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC303/25/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449102/26/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
03/25/2026Exterior lighting power—energy_progress
03/25/2026Excavations - Sheeting, Shoring, and Bracing—special
03/25/2026Fire-Resistant Penetrations and Joints—special
03/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/25/2026Energy Code Compliance Inspections—progress
03/25/2026Fire-Resistance Rated Construction—progress
03/25/2026Maintenance information—energy_progress
03/25/2026Air barrier — testing —energy_progress
03/25/2026Interior lighting power—energy_progress
03/25/2026Metering—energy_progress
03/25/2026Lighting controls—energy_progress
03/25/2026Lighting in dwelling units—energy_progress
03/25/2026Electrical motors and elevators—energy_progress
03/24/2026Fenestration areas—energy_progress
03/24/2026Fenestration and door U-factor and product ratings—energy_progress
03/24/2026Insulation placement and R values—energy_progress
03/24/2026Air barrier - visual inspection—energy_progress
03/24/2026Fenestration air leakage—energy_progress
03/24/2026Structural Stability – Alterations of existing buildings—special
02/26/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMED MAHMOUDspecial
02/26/2026Concrete - Cast-In-PlaceMOHAMED MAHMOUDspecial
02/26/2026Excavations - Sheeting, Shoring, and BracingMOHAMED MAHMOUDspecial
02/26/2026Fire-Resistant Penetrations and JointsMOHAMED MAHMOUDspecial
02/25/2026Air barrier - visual inspectionMOHAMED MAHMOUDenergy_progress
02/25/2026Fenestration areasMOHAMED MAHMOUDenergy_progress
Latest 25 of 38.
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/18/2026B01350318-I1Request digital key ↗
08/15/2026B01377300-I1Request digital key ↗
08/15/2026B01351533-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01377300-I1Open ↗
08/13/2026B01351533-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01351533-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026B01351533-I1Open ↗
08/17/2026B01377300-I1Open ↗
08/13/2026B01350318-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01351533-I1Open ↗
▸Other Documents6
▸DOB NOWSite Survey: Initial2
08/15/2026B01377300-I1Open ↗
08/15/2026B01351533-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01377300-I1Open ↗
08/13/2026B01351533-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01351533-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026B01351533-I1Open ↗