← Back
Gas station with retail store
1490 WILLIAMSBRIDGE ROAD
BRONX · BIN 2044196
💬 Discuss this project
1966Year Built
1Stories
G3Building Class
R6-1Zoning
651 sfGross Floor Area
1Units
0 Open Violations
Gas station with retail store · Owner of record: 1610 EASTCHESTER ROAD LLC. · 21,678 sf lot · 0.03 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1610 EASTCHESTER ROAD1003/21/2026
MARATHON PETROLEUM COMPANY603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HIGH POINT ENGINEERING812/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MACCARONE PLUMBING INCPlumbing507/08/2026
ISLAND PUMP AND TANK, LLCGeneral Contractor407/08/2026
NATIONAL MAINTENANCEScaffold207/08/2026
HUSBAND, TElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HIGH POINT ENGINEERING1151112/14/2021
SOIL MECHANICS DRILLING C2325207/27/2021
Building Lifecycle
All (94)Filed (8)Permit Issued (9)Signed Off (6)Violation (1)Inspection (1)Objection (58)Special Inspection (11)
03/15/2022
Signed off — Alteration
Installation of (1) 240 gallon aboveground fuel oil tank on concrete mat. No change in use, egress or occupancy.
X00645385-I1
03/07/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/25/2022
Permit issued — Boiler Equipment
X00645385-I1-BE
12/20/2021
Permit issued — Boiler Equipment
X00645385-I1-BE
12/14/2021
Filed — Alteration
Installation of (1) 240 gallon aboveground fuel oil tank on concrete mat. No change in use, egress or occupancy.
X00645385-I1
12/09/2021
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Christopher Tartaglia
11/15/2021
Signed off — Alteration
Filing Post approval amendment to update proposed canopy drainage piping associated with the 104' x 24' canopy over fuel dispensing islands. No change in use, egress or occupancy.
X00394243-I1
10/22/2021
Signed off — Alteration
Installation of proposed sign foundation with associated appurtenances. No change in use, egress or occupancy.
X00534376-I1
10/20/2021
Permit issued — Foundation
X00534376-I1-EA
10/20/2021
Permit issued — Earth Work
X00534376-I1-FO
10/13/2021
Signed off — Alteration
Installation of 50 SF ID logo and price sign as indicated on plans. No change in use, egress or occupancy.
X00534437-I1
10/13/2021
Signed off — Alteration
Installation of 3 "Shell" logo signs on the canopy. No change in use, egress or occupancy.
X00538391-I1
10/13/2021
Signed off — Alteration
Installation of construction fence as per the attached plans. No change to use, egress or occupancy.
X00387654-I1
08/31/2021
Special inspection requirement — Concrete - Cast-In-Place
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Structural Steel - Details
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Structural Steel - Welding
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Subgrade Inspections
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Footing and Foundation
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Final
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Structural Steel - High Strength Bolting
STEPHEN LAWNICZAK
08/31/2021
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
STEPHEN LAWNICZAK
08/30/2021
Objection resolved — Addressed
08/26/2021
Objection raised — Other
08/26/2021
Objection resolved — Addressed
08/20/2021
Violation issued (ECB, closed)
Construction
07/28/2021
Permit issued — Sign
X00538391-I1-SG
07/28/2021
Permit issued — Sign
X00534437-I1-SG
07/28/2021
Objection raised — Other
07/27/2021
Filed — Alteration
Installation of proposed sign foundation with associated appurtenances. No change in use, egress or occupancy.
X00534376-P1
07/26/2021
Permit issued — Plumbing
X00394243-I1-PL
06/29/2021
Filed — Alteration
Filing Post approval amendment to update proposed canopy drainage piping associated with the 104' x 24' canopy over fuel dispensing islands. No change in use, egress or occupancy.
X00394243-P1
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Other
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Other
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Admin
06/17/2021
Objection resolved — Addressed
06/17/2021
Objection raised — Other
06/17/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Admin
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Other
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Admin
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Admin
06/16/2021
Objection resolved — Addressed
06/16/2021
Objection raised — Admin
Latest 60 of 94 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNICHOLAS A. CANTATORE01/25/2022
DOB NOWBoiler EquipmentSigned-offNICHOLAS A. CANTATORE12/20/2021
DOB NOWFoundationSigned-offISLAND PUMP AND TANK, LLC10/20/2021
DOB NOWEarth WorkSigned-offISLAND PUMP AND TANK, LLC10/20/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC07/28/2021
DOB NOWSignSigned-offNATIONAL MAINTENANCE, INC07/28/2021
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC07/26/2021
DOB NOWPlumbingSigned-offMACCARONE PLUMBING INC04/13/2021
DOB NOWConstruction FenceSigned-offISLAND PUMP AND TANK, LLC04/01/2021
BISOTISSUEDISLAND PUMP AND TANK, LLC04/21/2021
BISOTISSUEDISLAND PUMP AND TANK, LLC04/15/2021
BISOTISSUEDISLAND PUMP AND TANK, LLC04/13/2021
BISOTISSUEDPINNACLE DEMOLITION AND E06/21/2016
BISEQISSUEDMETRO ENVIRONMENTAL SRVCS05/24/2016
BISOTISSUEDMETRO ENVIRONMENTAL SRVCS05/18/2016
BISEQISSUEDMETRO ENVIRONMENTAL SRVCS05/18/2016
BISPLISSUEDD & G MECHANICAL INC.09/25/2000
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.09/25/2000
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.06/22/2000
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.06/22/2000
BISFPISSUEDFIRE GUARD OF LONG ISLAND INC04/26/2000
BISFPISSUEDFIRE GUARD OF LONG ISLAND INC02/15/2000
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.01/27/2000
BISOTISSUEDGEMSTAR CONSTRUCTION CORP.01/27/2000
BISOTISSUEDGASOLINE INSTALLATIONS INC.01/22/1991
1 project · most recent 04/30/2021
General Wiring
FiledStatusContractorScope
04/30/2021CompleteDELTA PHASE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/07/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
12/09/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsChristopher Tartagliaspecial
08/31/2021Concrete - Cast-In-PlaceSTEPHEN LAWNICZAKspecial
08/31/2021Structural Steel - DetailsSTEPHEN LAWNICZAKspecial
08/31/2021Structural Steel - WeldingSTEPHEN LAWNICZAKspecial
08/31/2021Subgrade InspectionsSTEPHEN LAWNICZAKspecial
08/31/2021Footing and FoundationSTEPHEN LAWNICZAKprogress
08/31/2021FinalSTEPHEN LAWNICZAKprogress
08/31/2021Structural Steel - High Strength BoltingSTEPHEN LAWNICZAKspecial
08/31/2021Subsurface Conditions – Fill Placement & In-Place DensitySTEPHEN LAWNICZAKspecial
06/11/2021FinalChristopher Tartagliaprogress
06/04/2021FinalChristopher Tartagliaprogress
▾Documents — 125 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch5
08/25/2026X00645385-I1Request digital key ↗
08/15/2026X00538391-I1Request digital key ↗
08/15/2026X00534437-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/25/2026X00394243-I1Request digital key ↗
08/15/2026X00394243-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00387654-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION10
10/23/2025200600590Open ↗
02/07/2022220703610Open ↗
02/03/2022200568858Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
04/21/2021240284900Open ↗
04/15/2021240284740Open ↗
04/13/2021240284740Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications30
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/25/2026X00538391-I1Open ↗
08/25/2026X00534437-I1Open ↗
08/25/2026X00394243-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
05/08/2019220703610Open ↗
08/08/2016220412088Open ↗
08/08/2016220516378Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
06/20/2016240144802Open ↗
05/18/2016220412088Open ↗
05/18/2016220516378Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X00538391-I1Open ↗
08/31/2026X00534437-I1Open ↗
08/23/2026X00534376-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/23/2026X00645385-I1Open ↗
08/23/2026X00534376-I1Open ↗
08/23/2026X00534376-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/23/2020240284900Open ↗
06/20/2016240144802Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/18/2016220412088Open ↗
05/18/2016220516378Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
09/21/2020240284740Open ↗
09/18/2020240284900Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
06/20/2016240144802Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/08/2019220703610Open ↗
▸BISFDNY APPROVAL FOR TANKS1
04/15/2021240284900Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
05/08/2019220703610Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
05/08/2019220703610Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/20/2016240144802Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
10/30/2020240284900Open ↗
10/16/2020240284740Open ↗
09/23/2020240284900Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
11/11/2021240284740Open ↗
11/11/2021240284900Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
05/08/2019220703610Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/23/2020240284900Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY25
12/20/2021240284900Open ↗
12/16/2021240284900Open ↗
11/23/2021240284900Open ↗
Showing 3 of 25 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
12/17/2021240284900Open ↗
04/21/2021240284900Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/20/2021240284900Open ↗
▸Approvals, Objections & Sign-offs7
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/22/2021240284900Open ↗
11/19/2021240284740Open ↗
08/08/2016220412088Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
11/29/2021240284900Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
05/08/2019220703610Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT10
11/15/2021240284740Open ↗
11/11/2021240284900Open ↗
09/24/2020240284740Open ↗
Showing 3 of 10 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION4
10/23/2025200600590Open ↗
04/19/2021240284900Open ↗
03/09/2021240284900Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET3
05/08/2019220703610Open ↗
05/18/2016220412088Open ↗
05/18/2016220516378Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/21/2020240284740Open ↗
09/18/2020240284900Open ↗
06/20/2016240144802Open ↗
▸BISBOROUGH INTAKE FORM1
09/14/2020240284740Open ↗
▸Other Documents1
▸BISPLOT DIAGRAM1
05/08/2019220703610Open ↗