Elevator apt, fireproof without stores
1499 BEDFORD AVENUE
BROOKLYN · BIN 3032188
💬 Discuss this project
2023Year Built
10Stories
D3Building Class
R7DZoning
—Gross Floor Area
98Units
Elevator apt, fireproof without stores · Owner of record: 1499 Bedford · 6.39 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsMechanical system installation6 filings
RoofRoof protection1 filing
Floor 1Curb Cut2 filings · 2 docs
Cellar1 filing · 5 docs
Site & exteriorTemporary sidewalk shed installation4 filings · 18 docs
Nothing on file for this building.
Building Lifecycle
10/16/2026
Elevator Category 1 inspection report filed
12/09/2025
Elevator Category 1 inspection report filed
03/13/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/01/2024
Permit issued — Curb Cut
B00750067-I1-CC
03/01/2024
Permit issued — Mechanical Systems
B00474056-I1-MS
37 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTarget Construction03/01/2024
DOB NOWMechanical SystemsSigned-offTarget Construction03/01/2024
DOB NOWPlumbingSigned-offBest Mechanical Services10/26/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems08/21/2023
DOB NOWConstruction FenceSigned-offTarget Construction07/07/2023
DOB NOWStandpipeSigned-offBest Mechanical Services06/01/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/30/2023
DOB NOWStandpipeSigned-offBest Mechanical Services01/03/2023
DOB NOWSprinklersSigned-offRightway Plumbing and Heating12/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems09/26/2022
DOB NOWStructuralSigned-offTarget Construction09/23/2022
DOB NOWPlumbingSigned-offBest Mechanical Services08/24/2022
DOB NOWSprinklersSigned-offRightway Plumbing and Heating08/24/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems08/24/2022
DOB NOWStructuralSigned-offTarget Construction08/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/03/2022
DOB NOWStandpipeSigned-offBest Mechanical Services04/27/2022
DOB NOWConstruction FenceSigned-offBatco Associates07/07/2021
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/10/2021
DOB NOWSprinklersSigned-offEmpire Plumbing04/08/2021
DOB NOWConstruction FenceSigned-offBatco Associates02/23/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/13/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/26/2023Pass-Final SD - Fire PumpPassView ↗
10/23/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/23/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/20/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
10/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/20/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
10/18/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/18/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/10/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/17/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/04/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
Nothing on file for this building.