Bungalow colony - cooperatively owned land
14D EDGEWATER PARK
BRONX · BIN 2095572
💬 Discuss this project
1920Year Built
1Stories
A8Building Class
R4AZoning
69,121 sfGross Floor Area
56Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Bungalow colony - cooperatively owned land · Owner of record: EDGEWATER PARK OWNER CO · 171,000 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC103/12/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272103/12/2026
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
08/07/2026
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01370331-I1
03/20/2026
Permit issued — Solar
X01370331-I1-SL
03/12/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
X01370331-I1
03/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
03/12/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/11/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC03/20/2026
1 project · most recent 03/12/2026
General Wiring
FiledStatusContractorScope
03/12/2026CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/12/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
03/12/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/11/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/11/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/11/2026FinalWalid Abdullaprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026X01370331-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01370331-I1Open ↗
09/01/2026X01370331-I1Open ↗
09/01/2026X01370331-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026X01370331-I1Open ↗
09/01/2026X01370331-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026X01370331-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026X01370331-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026X01370331-I1Open ↗