Three families
14TH STREET
QUEENS · BIN 4623618
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R4Zoning
2,456 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: JING PROPERTY LLC · 2,733 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire ProtectionCivil
Floor 315p · 2 filings · 20 docs
Floor 215p · 2 filings · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar14p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
14 ASTORIA4507/08/2026
JING PROPERTY LLC103/22/2026
TT T CONSTRUCTION503/22/2026
GREAT666REALTY203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/13/2024$1.4M—— → —$580/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS104/11/2024
AMERILAND BROOK LLC1012/07/2023
LMW ENGINEERING GROUP LLC302/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AMERILAND BROOK LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor1007/08/2026
THC CONSTRUCTION INCGeneral Contractor303/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
ACCORD POWER INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561104/11/2024
AMERILAND BROOK LLC1506508/16/2023
G ENGINEERING PC7778305/31/2023
Building Lifecycle
All (107)Filed (14)Permit Issued (10)Signed Off (7)Violation (5)Inspection (13)Objection (28)Special Inspection (30)
07/16/2024
Signed off — New Building
PROPOSE A NEW THREE STORIES WITH THREE FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00489964-I1
06/21/2024
Signed off — Alteration
Q01025113-I1
05/01/2024
Permit issued — Solar
Q01025113-I1-SL
04/11/2024
Filed — Alteration
Q01025113-I1
03/27/2024
Signed off — Alteration
Q00583541-I1
03/25/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
03/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
03/25/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
03/25/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
03/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
03/14/2024
Permit issued — Structural
Q00583541-I1-GC-CX
03/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/14/2023
Signed off — Alteration
INSTALL A NEW 10' DROP CURB WITH BOTH SIDE SPLAYS IN CONJUNCTION WITH NB JOB#Q00489964
Q00651163-I1
12/12/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/07/2023
Filed — Alteration
INSTALL A NEW 10' DROP CURB WITH BOTH SIDE SPLAYS IN CONJUNCTION WITH NB JOB#Q00489964
Q00651163-P1
12/05/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
11/24/2023
Permit issued — Curb Cut
Q00651163-I1-CC
10/30/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB# Q00489964
Q00564157-I1
10/30/2023
Signed off — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB# Q00489964
Q00564172-I1
10/29/2023
Signed off — Alteration
Q00636215-I1
10/19/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/27/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/16/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB# Q00489964
Q00564157-P2
08/16/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH NB JOB# Q00489964
Q00564157-P3
08/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/16/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
06/08/2023
Special inspection requirement — Footing and Foundation
XIONGCAI GU
06/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
06/08/2023
Special inspection requirement — Structural Steel - Welding
XIONGCAI GU
06/08/2023
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
06/08/2023
Special inspection requirement — Interior lighting power
XIONGCAI GU
06/08/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIONGCAI GU
06/08/2023
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
06/08/2023
Special inspection requirement — Fenestration areas
XIONGCAI GU
06/08/2023
Special inspection requirement — Preliminary
XIONGCAI GU
05/31/2023
Filed — New Building
PROPOSE A NEW THREE STORIES WITH THREE FAMILY DWELLING UNITS. OBTAIN NEW C OF O.
Q00489964-P1
05/09/2023
Permit issued — General Construction
Q00489964-I1-GC-CX
03/15/2023
Permit issued — Plumbing
Q00564157-I1-PL
03/06/2023
Violation issued (ECB, closed)
Construction
03/06/2023
Violation issued (ECB, closed)
Construction
03/06/2023
Violation issued (ECB, closed)
Construction
10/13/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/13/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC05/01/2024
DOB NOWStructuralSigned-offTHC CONSTRUCTION INC03/14/2024
DOB NOWCurb CutSigned-offTT&T CONSTRUCTION INC11/24/2023
DOB NOWGeneral ConstructionPermit IssuedTT&T CONSTRUCTION INC05/09/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG03/15/2023
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC08/09/2022
DOB NOWFoundationPermit IssuedTT&T CONSTRUCTION INC05/06/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG02/18/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC11/26/2021
DOB NOWEarth WorkPermit IssuedTT&T CONSTRUCTION INC11/22/2021
2 projects · most recent 04/30/2024
General Wiring
FiledStatusContractorScope
04/30/2024CompletePOWER SURGE ELECTRIC, INC—
05/16/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 05/31/2023
FiledStatusContractorScope
05/31/2023Permit IssuedTT&T CONSTRUCTION INC2 scope_items
1 project · most recent 05/31/2023
Earthwork
FiledStatusContractorScope
05/31/2023Permit IssuedTT&T CONSTRUCTION INCEarthwork
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
03/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
12/05/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
10/19/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/27/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/13/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/13/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/13/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/18/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 117
DateRequirementInspectorRole
03/25/2024FinalMalathi Ananthakrishnanprogress
03/25/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
03/25/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
03/25/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
03/25/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
08/16/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
08/16/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
08/16/2023Maintenance informationXIAOHONG ZHAOenergy_progress
08/16/2023Maintenance informationXIAOHONG ZHAOenergy_progress
08/16/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
08/16/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
08/16/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
08/16/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/16/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
08/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
08/16/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/16/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/16/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIAOHONG ZHAOspecial
08/16/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesXIAOHONG ZHAOspecial
08/16/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/16/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
06/08/2023PreliminaryXIONGCAI GUprogress
06/08/2023Fire-Resistance Rated ConstructionXIONGCAI GUprogress
06/08/2023Footing and FoundationXIONGCAI GUprogress
06/08/2023FinalXIONGCAI GUprogress
Latest 25 of 117.
▾Documents — 97 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026Q00564172-I1Request digital key ↗
08/27/2026Q00583541-P1Request digital key ↗
08/27/2026Q00583541-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
08/15/2022440691495Open ↗
12/22/2021440691495Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/22/2021440691495Open ↗
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 12
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 22
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
12/22/2021440691495Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00489964-I1Open ↗
▸Seals & Professional Certifications38
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00564172-I1Open ↗
08/27/2026Q00583541-I1Open ↗
08/27/2026Q00583541-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/01/2026Q00564157-P2Open ↗
09/01/2026Q00564157-P2Open ↗
08/25/2026Q00564157-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00564157-P2Open ↗
08/25/2026Q00564157-P3Open ↗
08/25/2026Q01025113-I1Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/22/2021440691495Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/22/2021440691495Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
08/15/2022440691495Open ↗
12/22/2021440691495Open ↗
▸DOB NOWStreet Tree Checklist2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00489964-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00489964-I1Open ↗
▸Energy Compliance4
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026Q00564172-I1Open ↗
08/13/2026Q00489964-I1Open ↗
08/13/2026Q00583541-I1Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00489964-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00489964-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
12/22/2023440691495Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01025113-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026Q00489964-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026Q00489964-I1Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
08/15/2022440691495Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/22/2021440691495Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/22/2021440691495Open ↗
▸Other Documents9
▸BISBPP - SUPPORTING DOCUMENTATION2
08/15/2022440691495Open ↗
08/15/2022440691495Open ↗
▸DOB NOWSite Survey: Initial2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q00489964-I1Open ↗
08/13/2026Q00489964-P1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026Q00489964-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00489964-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00489964-I1Open ↗