← Back
BuildNYC
One story - permanent living quarter
15-09 CROSS BAY BOULEVARD
QUEENS · BIN 4297141
💬 Discuss this project
1945Year Built
1.75Stories
A2Building Class
R3AZoning
—Gross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
One story - permanent living quarter · 0.39 FAR built · Flood zone AE
Locations of Work
ArchitectureElectricalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 10 docs
Basement1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Amp Architecture303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chris Kim Engineering109/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sunation Solar Systemsspecialty_contractor303/21/2026
Ducky Johnson Home ElevatGeneral Contractor103/21/2026
P.S.I. MechanicalPlumbing212/01/2017
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Barun8842109/05/2025
Building Lifecycle
11/18/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01281635-I1
09/09/2025
Permit issued — Solar
Q01281635-I1-SL
09/05/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01281635-I1
09/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
09/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
12 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSunation Solar Systems09/09/2025
BISPLISSUEDP.S.I. Mechanical12/01/2017
BISPLISSUEDP.S.I. Mechanical11/30/2017
BISMHISSUEDDucky Johnson Home Elevat11/06/2017
BISMHISSUEDDucky Johnson Home Elevat05/25/2017
BISEQISSUEDDucky Johnson Home Elevat02/22/2017
2 projects · most recent 08/07/2025
General Wiring
FiledStatusContractorScope
08/07/2025CompleteGallant Electrical Construction—
05/16/2018CompletePappas & Fodera Elect'lGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
09/03/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
09/03/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
09/03/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)CHRIS KIMspecial
09/03/2025Energy Code Compliance InspectionsCHRIS KIMprogress
09/03/2025FinalCHRIS KIMprogress
09/03/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
92 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account