← Back
Single or multiple dwelling with stores or offices
15-18 COLLEGE POINT BLVD
QUEENS · College Point · BIN 4098209
💬 Discuss this project
1930Year Built
3Stories
S9Building Class
R5BZoning
11,100 sfGross Floor Area
9Units
Rent Stabilized3 Open Violations ▸
Single or multiple dwelling with stores or offices · Owner of record: 15-18 COLLEGE POINT · 5,000 sf lot · 2.22 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15-18 COLLEGE POINT2304/09/2026
MARI'S M BEAUTY SALON INC.203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DINGS ENGINEERING P.C.304/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DINGS ENGINEERING PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor104/09/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DINGS ENGINEERING PC2051304/24/2023
Building Lifecycle
All (50)Filed (3)Permit Issued (2)Signed Off (2)Violation (35)Inspection (5)Special Inspection (3)
02/12/2026
Signed off — Alteration
Install a gas wok, a gas rice cooker, a gas oven, a gas range, a range hood and relocate 3-comp sink at 1st floor for existing restaurant. No change of use, egress, and bulk of the building.
Q08023193-S1
03/18/2025
Violation issued (HPD, closed)
C
03/18/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
C
02/19/2025
Violation issued (HPD, closed)
B
10/28/2024
Violation issued (HPD, open)
A
10/28/2024
Violation issued (HPD, closed)
A
10/04/2024
Violation issued (HPD, closed)
C
10/04/2024
Violation issued (HPD, closed)
B
10/04/2024
Violation issued (HPD, open)
B
10/04/2024
Violation issued (HPD, closed)
C
10/04/2024
Violation issued (HPD, closed)
B
04/15/2024
Violation issued (HPD, closed)
A
11/22/2023
Signed off — Alteration
Install a gas wok, a gas rice cooker, a gas oven, a gas range, a range hood and relocate 3-comp sink at 1st floor for existing restaurant. No change of use, egress, and bulk of the building.
Q08023193-I1
04/28/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Yanqi Ding
04/24/2023
Filed — Alteration
Install a gas wok, a gas rice cooker, a gas oven, a gas range, a range hood and relocate 3-comp sink at 1st floor for existing restaurant. No change of use, egress, and bulk of the building.
Q08023193-P1
03/29/2023
Violation issued (HPD, closed)
A
03/29/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/17/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/13/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/17/2023
Permit issued — Plumbing
Q08023193-I1-PL
12/27/2022
Permit issued — Mechanical Systems
Q08023193-S1-MS
12/16/2022
Filed — Alteration
Install a gas wok, a gas rice cooker, a gas oven, a gas range, a range hood and relocate 3-comp sink at 1st floor for existing restaurant. No change of use, egress, and bulk of the building.
Q08023193-S1
12/07/2022
Special inspection requirement — Mechanical Systems
Yanqi Ding
12/07/2022
Special inspection requirement — Final
Yanqi Ding
11/02/2022
Filed — Alteration
Install a gas wok, a gas rice cooker, a gas oven, a gas range, a range hood and relocate 3-comp sink at 1st floor for existing restaurant. No change of use, egress, and bulk of the building.
Q08023193-I1
03/04/2022
Violation issued (HPD, closed)
A
04/15/2021
Violation issued (HPD, closed)
A
02/07/2015
Violation issued (ECB, closed)
Plumbing
12/30/2012
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2005
Violation issued (HPD, closed)
C
03/17/2005
Violation issued (HPD, closed)
C
03/17/2005
Violation issued (HPD, closed)
C
03/17/2005
Violation issued (HPD, closed)
C
03/17/2005
Violation issued (HPD, closed)
C
03/17/2005
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC01/17/2023
DOB NOWMechanical SystemsSigned-offKLE CONSTRUCTION INC12/27/2022
BISOTISSUEDJRS CONSTRUCTION & EXPEDITING01/19/2012
BISFPISSUEDBIG CITY PLBG ENGINEERING10/31/2011
BISPLISSUEDLLOYD G DRUMMOND PLBG&GEN10/19/2011
BISEQISSUEDZAK CONTRACTOR INC10/12/2011
BISOTISSUEDZAK CONTRACTOR INC10/12/2011
BISPLISSUEDRRP PLUMBING CORP10/11/2011
BISOTISSUEDPINGAN CONSTRUCTION INC10/06/2011
BISPLISSUEDPLUMBING & HTG DOCTOR INC04/11/2008
BISOTISSUEDMASONI CORP03/28/2008
BISMHISSUEDMASONI CORP03/28/2008
BISEQISSUEDMASONI CORP03/28/2008
1 project · most recent 05/10/2020
General Wiring
FiledStatusContractorScope
05/10/2020CompleteMALTA ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/29/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/17/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
04/28/2023Fire-Resistant Penetrations and JointsYanqi Dingspecial
12/07/2022Mechanical SystemsYanqi Dingspecial
12/07/2022FinalYanqi Dingprogress
▾Documents — 135 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026Q08023193-S1Request digital key ↗
08/25/2026Q08023193-I1Request digital key ↗
08/25/2026Q08023193-P1Request digital key ↗
▸Applications & Permits34
▸BISWORK PERMIT APPLICATION17
01/20/2012420524846Open ↗
11/01/2011420464606Open ↗
11/01/2011420496886Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
01/27/2023410026626Open ↗
09/03/2014420464606Open ↗
05/08/2012420464606Open ↗
Showing 3 of 15 on file for this type
▸BISIntent to Revoke Approval/Permit2
09/15/2014420464606Open ↗
03/06/2013420464606Open ↗
▸Seals & Professional Certifications27
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
01/20/2012420524846Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
01/20/2012420524846Open ↗
10/26/2011420496886Open ↗
07/28/2011420464606Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/20/2012420524846Open ↗
10/26/2011420496886Open ↗
07/28/2011420464606Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026Q08023193-S1Open ↗
08/25/2026Q08023193-I1Open ↗
08/25/2026Q08023193-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026Q08023193-S1Open ↗
08/25/2026Q08023193-I1Open ↗
▸BISPC FULL REPORT1
11/20/2007410026626Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026Q08023193-S1Open ↗
▸Trade Schedules & Equipment19
▸BISSELF-CERT PLUMBING NOTICE10
05/17/2012420464606Open ↗
02/22/2012420491186Open ↗
02/21/2012420491186Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING6
05/08/2012420464606Open ↗
10/11/2011420491186Open ↗
10/03/2011420488074Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
05/21/2012420491186Open ↗
10/11/2011420491186Open ↗
▸BISEQUIPMENT USE PERMITS1
05/21/2012420491186Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/11/2011420491186Open ↗
▸Environmental & Asbestos11
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
10/26/2011420496886Open ↗
10/11/2011420491186Open ↗
10/03/2011420488074Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026Q08023193-S1Open ↗
08/25/2026Q08023193-P1Open ↗
08/25/2026Q08023193-I1Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
09/11/2008410161658Open ↗
▸BISASBESTOS-CERTIFICATION (DEP ACP5)1
10/26/2011420496886Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY6
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
01/20/2012420524846Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS7
01/20/2012420524846Open ↗
10/26/2011420496886Open ↗
10/11/2011420491186Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
05/21/2012420491186Open ↗
02/08/2012420488074Open ↗
01/20/2012420524846Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET6
01/20/2012420524846Open ↗
10/26/2011420496886Open ↗
10/11/2011420491186Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION1
05/21/2012420491186Open ↗
▸Other Documents3
▸BISFIRE SUPP ANSUL APPROVL- FD-FSS3
05/17/2012420464606Open ↗
12/28/2011420464606Open ↗
11/21/2011420496886Open ↗