← Back
Two family frame
15-34 150 STREET
QUEENS · BIN 4105686
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
3,148 sfGross Floor Area
2Units
Two family frame · 4,750 sf lot · 0.66 FAR built · Flood zone X
Locations of Work
ArchitectureCivilGeneral
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar1p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/08/2021$950K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC809/15/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor707/08/2026
WATSON'S PLBG, HTG, & BDGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506609/15/2023
Building Lifecycle
All (82)Filed (8)Permit Issued (7)Signed Off (5)Inspection (12)Objection (20)Special Inspection (30)
02/16/2024
Signed off — New Building
PROPOSE A NEW TWO FAMILY BUILDING. OBTAIN NEW C OF O
Q00559643-I1
12/05/2023
Signed off — Alteration
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00727239-I1
12/04/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00559643
Q00559670-I1
11/30/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/08/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
09/29/2023
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Exterior lighting power
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Subgrade Inspections
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Structural Steel - Welding
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Metering
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Structural Steel - Details
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
09/29/2023
Special inspection requirement — Structural Steel - High Strength Bolting
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Footing and Foundation
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Final
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Masonry
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/29/2023
Special inspection requirement — Fenestration air leakage
XIAOHONG ZHAO
09/15/2023
Filed — New Building
PROPOSE A NEW TWO FAMILY BUILDING. OBTAIN NEW C OF O
Q00559643-P2
09/15/2023
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
09/15/2023
Special inspection requirement — Fenestration air leakage
XIAOHONG ZHAO
09/12/2023
Signed off — Alteration
FILE MH WORKTYPE IN CONJUNCTION WITH NB JOB#Q00559643
Q00559757-I1
09/07/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/01/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/18/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/22/2023
Permit issued — Earth Work
Q00559643-I1-GC-CX
05/15/2023
Objection raised — Zoning
05/15/2023
Objection resolved — Addressed
05/08/2023
Objection resolved — Addressed
05/08/2023
Objection resolved — Addressed
04/06/2023
Objection raised — Zoning
04/06/2023
Objection raised — Scope
04/03/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00559643
Q00559670-P1
04/03/2023
Permit issued — Plumbing
Q00559670-I1-PL
04/02/2023
Filed — New Building
PROPOSE A NEW TWO FAMILY BUILDING. OBTAIN NEW C OF O
Q00559643-P1
02/22/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
01/25/2023
Signed off — Alteration
Q00559668-I1
01/25/2023
Permit issued — Curb Cut
Q00727239-I1-CC
12/28/2022
Filed — Alteration
INSTALL 10' DROP CURB WITH 1'-6" SPLAYS ON BOTHSIDE.
Q00727239-I1
08/09/2022
Permit issued — Mechanical Systems
Q00559757-I1-MS
07/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/08/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkPermit IssuedTT&T CONSTRUCTION INC05/22/2023
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG04/03/2023
DOB NOWCurb CutSigned-offTT&T CONSTRUCTION INC01/25/2023
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC08/09/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG03/28/2022
DOB NOWEarth WorkPermit IssuedTT&T CONSTRUCTION INC02/05/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC11/18/2021
BIS—ISSUEDTT&T CONSTRUCTION INC12/30/2021
1 project · most recent 03/29/2022
General Wiring
FiledStatusContractorScope
03/29/2022CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
1 project · most recent 09/15/2023
FiledStatusContractorScope
09/15/2023Permit IssuedTT&T CONSTRUCTION INC3 scope_items
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
11/30/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/08/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
09/07/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/01/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/22/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
07/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/25/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/08/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 94
DateRequirementInspectorRole
09/29/2023Air barrier — testing XIAOHONG ZHAOenergy_progress
09/29/2023Permanent certificateXIAOHONG ZHAOenergy_progress
09/29/2023Exterior lighting powerXIAOHONG ZHAOenergy_progress
09/29/2023Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
09/29/2023Fenestration air leakageXIAOHONG ZHAOenergy_progress
09/29/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
09/29/2023Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
09/29/2023MeteringXIAOHONG ZHAOenergy_progress
09/29/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
09/29/2023Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
09/29/2023Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
09/29/2023Maintenance informationXIAOHONG ZHAOenergy_progress
09/29/2023Fenestration areasXIAOHONG ZHAOenergy_progress
09/29/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
09/29/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
09/29/2023FinalXIAOHONG ZHAOprogress
09/29/2023Footing and FoundationXIAOHONG ZHAOprogress
09/29/2023Structural Steel - WeldingXIAOHONG ZHAOspecial
09/29/2023Structural Steel - High Strength BoltingXIAOHONG ZHAOspecial
09/29/2023MasonryXIAOHONG ZHAOspecial
09/29/2023Subsurface Investigations (Borings/Test Pits)TONY ONYEAGOROspecial
09/29/2023Subgrade InspectionsXIAOHONG ZHAOspecial
09/29/2023Chimneys and ventsXIAOHONG ZHAOspecial
09/29/2023Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
09/29/2023Structural Steel - DetailsXIAOHONG ZHAOspecial
Latest 25 of 94.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026Q00559757-I1Request digital key ↗
08/27/2026Q00559668-I1Request digital key ↗
08/25/2026Q00727239-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits5
▸BISBPP-5 - Authorization to the Department of Transportation2
08/19/2022440692573Open ↗
10/21/2021440692573Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION2
10/21/2021440692573Open ↗
06/30/2021421786598Open ↗
▸BISWORK PERMIT APPLICATION1
03/10/2022421786598Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00559643-P1Open ↗
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00559643-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026Q00559643-P2Open ↗
09/01/2026Q00559643-P2Open ↗
08/25/2026Q00559643-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026Q00559757-I1Open ↗
08/27/2026Q00559668-I1Open ↗
08/25/2026Q00559643-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q00559643-P2Open ↗
09/01/2026Q00559643-P2Open ↗
08/25/2026Q00559643-P1Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
10/21/2021440692573Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/21/2021440692573Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00559643-P2Open ↗
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P1Open ↗
▸BISGAS CUT-OFF1
03/10/2022421786598Open ↗
▸BISSEWER CUT-OFF1
03/10/2022421786598Open ↗
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/25/2026Q00559643-P2Open ↗
08/14/2026Q00559643-P1Open ↗
08/14/2026Q00559643-I1Open ↗
▸BISSTREET TREE CHECKLIST2
08/19/2022440692573Open ↗
10/21/2021440692573Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
03/10/2022421786598Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
03/10/2022421786598Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/10/2022421786598Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00559643-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00559643-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00559643-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/10/2022421786598Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559757-I1Open ↗
08/13/2026Q00559670-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026Q00559643-P1Open ↗
08/13/2026Q00559643-P2Open ↗
08/13/2026Q00559643-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00559643-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00559643-I1Open ↗
▸Approvals, Objections & Sign-offs8
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/10/2022421786598Open ↗
03/10/2022421786598Open ↗
03/10/2022421786598Open ↗
Showing 3 of 5 on file for this type
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
08/31/2023440692573Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/10/2022421786598Open ↗
▸BISLANDMARKS APPROVAL1
03/10/2022421786598Open ↗
▸Cost, Insurance & Ownership1
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
03/10/2022421786598Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION1
08/19/2022440692573Open ↗
▸BISBOROUGH INTAKE FORM1
03/10/2022421786598Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
10/21/2021440692573Open ↗
▸BISEFILING COVER SHEET1
06/30/2021421786598Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2021440692573Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial3
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P2Open ↗
08/13/2026Q00559643-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00559643-P2Open ↗
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P1Open ↗
▸DOB NOWPD1 Document3
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P1Open ↗
08/13/2026Q00559643-P2Open ↗
▸DOB NOWSURVEY: INITIAL3
08/13/2026Q00559643-P1Open ↗
08/13/2026Q00559643-I1Open ↗
08/13/2026Q00559643-P2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
08/19/2022440692573Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00559643-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00559643-I1Open ↗