15-55 UTOPIA PARKWAY
QUEENS · BIN 4129627
💬 Discuss this project
1950Year Built
2Stories
A1Building Class
R3XZoning
2,006 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,650 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof1p · 2 filings · 20 docs
Floor 212p · 2 filings · 20 docs
Floor 112p · 1 filing · 20 docs
Cellar13p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L&L CONSTRUCTION DEVELOP103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/22/2025$1.9M—— → —$972/sf building
07/31/2023$998K—— → —$498/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT306/20/2024
ALPHA HOME DESIGN LLC202/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
INDESIGN STUDIO1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
L&L CONSTRUCTION DEVELOPGeneral Contractor707/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor109/26/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513206/20/2024
YAN GAO6619202/14/2024
Building Lifecycle
All (63)Filed (5)Permit Issued (5)Signed Off (2)Violation (1)Inspection (4)Objection (16)Special Inspection (30)
09/25/2026
Permit issued — Solar
Q01463113-I1-SL
09/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/02/2024
Objection resolved — Addressed
08/02/2024
Special inspection requirement — Metering
DEZHANG FANG
08/02/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
08/02/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
08/02/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
08/02/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
08/02/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DEZHANG FANG
08/02/2024
Special inspection requirement — Masonry
DEZHANG FANG
08/02/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
08/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
08/02/2024
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
08/02/2024
Special inspection requirement — Final
DEZHANG FANG
08/02/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
08/02/2024
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
08/02/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
08/02/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
08/02/2024
Special inspection requirement — Electric vehicle service equipment requirements
DEZHANG FANG
08/02/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
07/30/2024
Signed off — Alteration
ERECT 3-PC BATHROOM(CRFN 2023000322906), AND PROPOSE PLUMBING WORK OF 2-FAMILY BUILDING IN CONJUNCTION WITH JOB# Q00925391. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00925395-I1
07/16/2024
Objection resolved — Addressed
06/27/2024
Objection raised — Inspections
06/27/2024
Objection raised — Other
06/20/2024
Filed — Alteration CO
PROPOSE VERTICAL EXTENSION TO EXIST. BUILDING AND CONVERT 1-FAMILY TO 2-FAMILY RESIDENCE. OBTAIN NEW C OF O.
Q00925391-P1
06/20/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
DEZHANG FANG
06/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
DEZHANG FANG
06/20/2024
Special inspection requirement — Structural Wood Frame
DEZHANG FANG
06/20/2024
Special inspection requirement — Fenestration air leakage
DEZHANG FANG
06/20/2024
Special inspection requirement — Interior lighting power
DEZHANG FANG
06/20/2024
Special inspection requirement — Fenestration areas
DEZHANG FANG
06/20/2024
Special inspection requirement — Electric vehicle service equipment requirements
DEZHANG FANG
06/20/2024
Special inspection requirement — Metering
DEZHANG FANG
06/20/2024
Special inspection requirement — Insulation placement and R values
DEZHANG FANG
06/20/2024
Special inspection requirement — Air barrier - visual inspection
DEZHANG FANG
06/20/2024
Special inspection requirement — Maintenance information
DEZHANG FANG
06/20/2024
Special inspection requirement — Concrete - Cast-In-Place
DEZHANG FANG
06/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
06/18/2024
Signed off — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH.
Q00963303-I1
03/27/2024
Violation issued (ECB, closed)
Unknown
02/20/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
02/20/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
02/14/2024
Filed — Alteration
ERECT 3-PC BATHROOM(CRFN 2023000322906), AND PROPOSE PLUMBING WORK OF 2-FAMILY BUILDING IN CONJUNCTION WITH JOB# Q00925391. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00925395-P1
12/29/2023
Permit issued — Plumbing
Q00925395-I1-PL
12/26/2023
Permit issued — Structural
Q00925391-I1-ST
12/22/2023
Permit issued — General Construction
Q00925391-I1-GC
12/12/2023
Filed — Alteration
ERECT 3-PC BATHROOM(CRFN 2023000322906), AND PROPOSE PLUMBING WORK OF 2-FAMILY BUILDING IN CONJUNCTION WITH JOB# Q00925391. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00925395-I1
11/24/2023
Permit issued — Construction Fence
Q00963303-I1-FN
11/15/2023
Filed — Alteration
INSTALL TEMPORARY CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH.
Q00963303-I1
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
10/30/2023
Objection resolved — Addressed
09/05/2023
Objection raised — Zoning
09/05/2023
Objection raised — Scope
09/05/2023
Objection raised — Zoning
09/05/2023
Objection raised — Zoning
Latest 60 of 63 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC09/25/2026
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC12/29/2023
DOB NOWStructuralSigned-offL&L CONSTRUCTION DEVELOP12/26/2023
DOB NOWGeneral ConstructionPermit IssuedL&L CONSTRUCTION DEVELOP12/22/2023
DOB NOWConstruction FenceSigned-offL&L CONSTRUCTION DEVELOP11/24/2023
2 projects · most recent 09/22/2026
General Wiring
FiledStatusContractorScope
09/22/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
07/06/2024CompleteR & T ELECTRICAL CORPGeneral Wiring
1 project · most recent 06/20/2024
Wood
FiledStatusContractorScope
06/20/2024Signed-offL&L CONSTRUCTION DEVELOPWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
08/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/20/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/20/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/02/2024MeteringDEZHANG FANGenergy_progress
08/02/2024Fenestration areasDEZHANG FANGenergy_progress
08/02/2024Interior lighting powerDEZHANG FANGenergy_progress
08/02/2024Air barrier - visual inspectionDEZHANG FANGenergy_progress
08/02/2024Maintenance informationDEZHANG FANGenergy_progress
08/02/2024Structural Stability – Alterations of existing buildingsDEZHANG FANGspecial
08/02/2024MasonryDEZHANG FANGspecial
08/02/2024Concrete - Cast-In-PlaceDEZHANG FANGspecial
08/02/2024Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
08/02/2024Energy Code Compliance InspectionsDEZHANG FANGprogress
08/02/2024FinalDEZHANG FANGprogress
08/02/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
08/02/2024Structural Wood FrameDEZHANG FANGprogress
08/02/2024Fenestration air leakageDEZHANG FANGenergy_progress
08/02/2024Insulation placement and R valuesDEZHANG FANGenergy_progress
08/02/2024Electric vehicle service equipment requirementsDEZHANG FANGenergy_progress
08/02/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
06/20/2024Fenestration and door U-factor and product ratingsDEZHANG FANGenergy_progress
06/20/2024Fire-Resistance Rated ConstructionDEZHANG FANGprogress
06/20/2024Structural Wood FrameDEZHANG FANGprogress
06/20/2024Fenestration air leakageDEZHANG FANGenergy_progress
06/20/2024Interior lighting powerDEZHANG FANGenergy_progress
06/20/2024Fenestration areasDEZHANG FANGenergy_progress
06/20/2024Electric vehicle service equipment requirementsDEZHANG FANGenergy_progress
06/20/2024MeteringDEZHANG FANGenergy_progress
Latest 25 of 44.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026Q00925391-I1Request digital key ↗
08/23/2026Q00963303-I1Request digital key ↗
08/23/2026Q00925395-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00925391-I1Open ↗
08/13/2026Q00925391-P1Open ↗
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00925395-I1Open ↗
08/13/2026Q00925395-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00925391-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00925395-I1Open ↗
09/01/2026Q00925395-I1Open ↗
08/27/2026Q00925395-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026Q00925391-P1Open ↗
08/24/2026Q00925391-I1Open ↗
08/23/2026Q00963303-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026Q00925395-I1Open ↗
08/27/2026Q00925395-P1Open ↗
08/27/2026Q00925391-P1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00925391-P1Open ↗
08/13/2026Q00925391-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026Q00925391-I1Open ↗
08/23/2026Q00925395-P1Open ↗
08/23/2026Q00925395-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial2
08/13/2026Q00925391-I1Open ↗
08/13/2026Q00925391-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00925391-I1Open ↗
08/13/2026Q00925391-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00925391-I1Open ↗
08/13/2026Q00925391-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/24/2026Q00925391-I1Open ↗
08/15/2026Q00925391-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00925391-I1Open ↗