← Back
Two family frame
15-59 150 STREET
QUEENS · Whitestone-Beechhurst · BIN 4106267
💬 Discuss this project
1960Year Built
2.5Stories
B2Building Class
R3AZoning
3,114 sfGross Floor Area
2Units
Rent Stabilized3 Open Violations ▸
Two family frame · 4,893 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Floor 24p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYW203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2022$1.6M—NYW LLC → Private party$522/sf building
05/25/2021$998K—Private party → NYW LLC$320/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.606/17/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPLEN CONSTRUCTION INCGeneral Contractor603/21/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129606/17/2022
Building Lifecycle
All (61)Filed (6)Permit Issued (3)Signed Off (2)Violation (5)Inspection (9)Objection (6)Special Inspection (30)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
11/29/2023
Violation issued (HPD, open)
I
07/12/2022
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00545892-I1
07/07/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/05/2022
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/30/2022
Special inspection requirement — Interior lighting power
MEHDI GHAZI
06/30/2022
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
06/30/2022
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
06/30/2022
Special inspection requirement — Air barrier - visual inspection
MEHDI GHAZI
06/30/2022
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
06/30/2022
Special inspection requirement — Masonry
MEHDI GHAZI
06/30/2022
Special inspection requirement — Heating Systems
MEHDI GHAZI
06/30/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
06/30/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/30/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/30/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
06/30/2022
Special inspection requirement — Fire-Resistance Rated Construction
MEHDI GHAZI
06/30/2022
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
06/30/2022
Special inspection requirement — Final
MEHDI GHAZI
06/30/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/30/2022
Special inspection requirement — Insulation placement and R values
MEHDI GHAZI
06/30/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MEHDI GHAZI
06/30/2022
Special inspection requirement — Permanent certificate
MEHDI GHAZI
06/30/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
MEHDI GHAZI
06/30/2022
Special inspection requirement — Fenestration air leakage
MEHDI GHAZI
06/30/2022
Special inspection requirement — Maintenance information
MEHDI GHAZI
06/30/2022
Special inspection requirement — Fenestration areas
MEHDI GHAZI
06/27/2022
Objection resolved — Addressed
06/24/2022
Objection raised — Scope
06/17/2022
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00545883-I1
06/17/2022
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION ON 2ND FLOOR FOR EXISTING 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW C.O.
Q00545902-P2
06/17/2022
Special inspection requirement — Structural Wood Frame
MEHDI GHAZI
06/17/2022
Special inspection requirement — Concrete - Cast-In-Place
MEHDI GHAZI
06/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
06/17/2022
Special inspection requirement — Heating Systems
MEHDI GHAZI
06/17/2022
Special inspection requirement — Masonry
MEHDI GHAZI
06/17/2022
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
06/17/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
MEHDI GHAZI
06/17/2022
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
06/02/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/04/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00545892-P2
02/01/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/25/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/25/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/12/2022
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00545892-P1
09/14/2021
Permit issued — Mechanical Systems
Q00545902-I1-GC-CX
09/03/2021
Permit issued — Plumbing
Q00545892-I1-PL
08/31/2021
Permit issued — Construction Fence
Q00545883-I1-FN
08/25/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Q00545892-I1
07/20/2021
Objection raised — Zoning
07/20/2021
Objection resolved — Addressed
07/20/2021
Objection raised — Zoning
07/20/2021
Objection resolved — Addressed
06/28/2021
Filed — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00545883-I1
06/28/2021
Filed — Alteration CO
PROPOSE HORIZONTAL EXTENSION ON 2ND FLOOR FOR EXISTING 2-FAMILY DETACHED RESIDENCE. OBTAIN A NEW C.O.
Q00545902-I1
07/31/2002
Violation issued (HPD, closed)
B
Latest 60 of 61 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSPLEN CONSTRUCTION INC09/14/2021
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC09/03/2021
DOB NOWConstruction FenceSigned-offSPLEN CONSTRUCTION INC08/31/2021
1 project · most recent 06/17/2022
Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
06/17/2022Permit IssuedSPLEN CONSTRUCTION INCHeating Systems
Heating
Williamson GWA-105 105,000 BTU · Boiler ×4
1 project · most recent 10/19/2021
General Wiring
FiledStatusContractorScope
10/19/2021CompleteKJK ELECTRIC INCGeneral Wiring
1 project · most recent 06/17/2022
Masonry Wood
FiledStatusContractorScope
06/17/2022Permit IssuedSPLEN CONSTRUCTION INCMasonry, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/07/2022Pass-Final CND-Occupancy InspectionPassView ↗
07/05/2022Fail-Final CND-Occupancy InspectionFailView ↗
06/02/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/01/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/25/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/25/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
06/30/2022Interior lighting powerMEHDI GHAZIenergy_progress
06/30/2022Ventilation and air distribution systemMEHDI GHAZIenergy_progress
06/30/2022HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
06/30/2022Air barrier - visual inspectionMEHDI GHAZIenergy_progress
06/30/2022HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
06/30/2022MasonryMEHDI GHAZIspecial
06/30/2022Heating SystemsMEHDI GHAZIspecial
06/30/2022Mechanical SystemsMEHDI GHAZIspecial
06/30/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
06/30/2022Concrete - Cast-In-PlaceMEHDI GHAZIspecial
06/30/2022Structural Stability – Alterations of existing buildingsMEHDI GHAZIspecial
06/30/2022Fire-Resistance Rated ConstructionMEHDI GHAZIprogress
06/30/2022Structural Wood FrameMEHDI GHAZIprogress
06/30/2022FinalMEHDI GHAZIprogress
06/30/2022Energy Code Compliance InspectionsMEHDI GHAZIprogress
06/30/2022Insulation placement and R valuesMEHDI GHAZIenergy_progress
06/30/2022HVAC-R and service water piping design and insulationMEHDI GHAZIenergy_progress
06/30/2022Permanent certificateMEHDI GHAZIenergy_progress
06/30/2022Fenestration and door U-factor and product ratingsMEHDI GHAZIenergy_progress
06/30/2022Fenestration air leakageMEHDI GHAZIenergy_progress
06/30/2022Maintenance informationMEHDI GHAZIenergy_progress
06/30/2022Fenestration areasMEHDI GHAZIenergy_progress
06/17/2022Structural Wood FrameMEHDI GHAZIprogress
06/17/2022Concrete - Cast-In-PlaceMEHDI GHAZIspecial
06/17/2022Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
Latest 25 of 59.
▾Documents — 45 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00545883-I1Request digital key ↗
08/27/2026Q00545892-P2Request digital key ↗
08/27/2026Q00545892-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00545902-I1Open ↗
08/13/2026Q00545902-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00545902-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q00545892-P2Open ↗
09/01/2026Q00545892-P2Open ↗
08/31/2026Q00545902-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026Q00545902-I1Open ↗
08/26/2026Q00545902-P2Open ↗
08/13/2026Q00545883-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026Q00545892-P2Open ↗
08/31/2026Q00545902-I1Open ↗
08/28/2026Q00545892-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026Q00545902-P2Open ↗
08/13/2026Q00545902-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/15/2026Q00545902-I1Open ↗
08/15/2026Q00545902-P2Open ↗
08/13/2026Q00545892-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00545902-I1Open ↗
08/13/2026Q00545892-I1Open ↗
▸Other Documents6
▸DOB NOWPlot Diagram2
08/13/2026Q00545902-I1Open ↗
08/13/2026Q00545902-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00545902-I1Open ↗
08/13/2026Q00545902-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00545902-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00545902-P2Open ↗