← Back
Walk-up apt, over six families with stores
15 7 AVENUE SOUTH
MANHATTAN · West Village · BIN 1077936
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
C2-6Zoning
23,692 sfGross Floor Area
38Units
Rent Stabilized32 Open Violations 31 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: CARMINE TIERRA, LLC · 6,287 sf lot · 3.77 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivil
Roof1p · 1 filing · 6 docs
Floor 15p · 1 filing · 2 docs
Cellar5p · 1 filing · 11 docs
Site & exterior3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HALSTEAD MANAGEMENT2607/08/2026
CO MAUTNER GLICK ALVIN GLICK303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.212/01/2023
SRL ASSOCIATES207/19/2021
METRIC CONSULTING AND INSPECTION107/19/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING ASSOCIATES P C403/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TIME CONTRACTING INCGeneral Contractor1107/08/2026
BILLS, ANTHONYElectrical203/21/2026
CONWAY, JR, WILLIAMElectrical203/21/2026
GEORGE BASSOLINOElectrical203/21/2026
PETER VAVALLOElectrical203/21/2026
AURICCHIO, ANNIELLEElectrical203/21/2026
SERVICE TECH MECH&PLBG INPlumbing207/08/2026
MARTY ALLEN ELEC'L CO.,INElectrical103/21/2026
RULLO, ANTHONYElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851212/01/2023
METRIC CONSULTING AND INS1803107/19/2021
Building Lifecycle
All (93)Filed (5)Permit Issued (8)Signed Off (2)Violation (60)Inspection (7)Special Inspection (11)
05/25/2026
Violation issued (HPD, open)
C
05/25/2026
Violation issued (HPD, open)
A
05/25/2026
Violation issued (HPD, open)
C
05/07/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, closed)
I
05/23/2025
Violation issued (HPD, open)
C
04/14/2025
Signed off — Alteration
REPLACE BOILER AND GAS BURNER.
M00962788-S1
04/08/2025
Signed off — Alteration
REPLACE BOILER AND GAS BURNER.
M00962788-I1
01/17/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/04/2025
Violation issued (HPD, open)
C
12/12/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
10/10/2024
Violation issued (HPD, open)
C
10/07/2024
Violation issued (HPD, open)
C
10/07/2024
Violation issued (HPD, open)
C
10/07/2024
Violation issued (HPD, open)
C
08/06/2024
Violation issued (HPD, open)
B
08/06/2024
Violation issued (HPD, open)
C
08/06/2024
Violation issued (HPD, open)
A
08/06/2024
Violation issued (HPD, open)
A
08/06/2024
Violation issued (HPD, open)
C
08/06/2024
Violation issued (HPD, open)
C
08/06/2024
Violation issued (HPD, open)
B
08/06/2024
Violation issued (HPD, open)
C
07/10/2024
Violation issued (HPD, open)
C
06/14/2024
Violation issued (HPD, open)
C
06/14/2024
Violation issued (HPD, open)
C
06/12/2024
Violation issued (HPD, open)
C
06/12/2024
Violation issued (HPD, open)
C
06/12/2024
Violation issued (HPD, open)
B
06/12/2024
Violation issued (HPD, open)
B
06/02/2024
Violation issued (HPD, open)
B
06/02/2024
Violation issued (HPD, open)
C
06/02/2024
Violation issued (HPD, closed)
C
06/02/2024
Violation issued (HPD, closed)
C
06/02/2024
Violation issued (HPD, open)
C
06/02/2024
Violation issued (HPD, open)
C
06/02/2024
Violation issued (HPD, open)
B
12/13/2023
Permit issued — Boiler Equipment
M00962788-I1-BE
12/13/2023
Permit issued — Plumbing
M00962788-S1-PL
12/01/2023
Filed — Alteration
REPLACE BOILER AND GAS BURNER.
M00962788-S1
12/01/2023
Filed — Alteration
REPLACE BOILER AND GAS BURNER.
M00962788-I1
11/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/15/2023
Special inspection requirement — Maintenance information
LOUIS ARENA
11/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/15/2023
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
11/15/2023
Special inspection requirement — Heating Systems
LOUIS ARENA
11/15/2023
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
04/11/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/13/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/08/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/17/2021
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/16/2021
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/05/2021
Permit issued — Sidewalk Shed
M00523479-I1-SH
11/04/2021
Permit issued — Supported Scaffold
M00555020-I1-SF
11/04/2021
Permit issued — General Construction
M00554994-I1-GC
08/19/2021
Permit issued — General Construction
M00554994-I1-GC
07/20/2021
Permit issued — Supported Scaffold
M00555020-I1-SF
07/19/2021
Filed — Alteration
Proposed parapet reconstruction per plan submitted. No change to existing use, egress and/or occupancy with this application.
M00554994-I1
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offSERVICE TECH MECH&PLBG IN12/13/2023
DOB NOWPlumbingSigned-offSERVICE TECH MECH&PLBG IN12/13/2023
DOB NOWSidewalk ShedPermit IssuedTIME CONTRACTING INC11/05/2021
DOB NOWSupported ScaffoldPermit IssuedTIME CONTRACTING INC11/04/2021
DOB NOWGeneral ConstructionSigned-offTIME CONTRACTING INC11/04/2021
DOB NOWGeneral ConstructionSigned-offTIME CONTRACTING INC08/19/2021
DOB NOWSupported ScaffoldPermit IssuedTIME CONTRACTING INC07/20/2021
DOB NOWSidewalk ShedPermit IssuedTIME CONTRACTING INC06/03/2021
BISBLISSUEDLEMODE PLBG & HTG CORP02/06/2004
BISPLISSUEDLEMODE PLBG & HTG CORP02/06/2004
BISOTISSUEDARCO GENE CONTR CORP12/05/2001
4 projects · most recent 07/28/2026
General Wiring Boiler Controls
FiledStatusContractorScope
07/28/2026Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
11/24/2025Permit IssuedTESTA ELECTRIC CO., INCGeneral Wiring
05/01/2025CompleteLIVE WIRE ELECTRICAL, INCBoiler Controls
12/30/2019CompletePK ELECTRIC INC1 meters
2 projects · most recent 07/19/2021
Scaffold Sidewalk Shed
FiledStatusContractorScope
07/19/2021Permit IssuedTIME CONTRACTING INCScaffold
06/02/2021Permit IssuedTIME CONTRACTING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/17/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2024Pass-Final Boiler Equipment InspectionPassView ↗
04/11/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/13/2023Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2023Fail-Final CND-Occupancy InspectionFailView ↗
11/17/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/16/2021Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/15/2023HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/15/2023HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/15/2023Maintenance informationLOUIS ARENAenergy_progress
11/15/2023HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/15/2023Energy Code Compliance InspectionsLOUIS ARENAprogress
11/15/2023Heating SystemsLOUIS ARENAspecial
11/15/2023Tenant Protection Plan ComplianceLOUIS ARENAspecial
07/09/2021Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
07/09/2021FinalSAMI HAJJAR P.Eprogress
07/09/2021MasonrySAMI HAJJAR P.Especial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026M00523479-I1Request digital key ↗
09/03/2026M00554994-I1Request digital key ↗
09/03/2026M00555020-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026M00523479-I1Open ↗
09/03/2026M00554994-I1Open ↗
09/03/2026M00555020-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M00962788-I1Open ↗
08/27/2026M00962788-S1Open ↗
08/24/2026M00554994-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/23/2026M00962788-I1Open ↗
08/27/2026M00962788-S1Open ↗
08/24/2026M00554994-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026M00554994-I1Open ↗
08/13/2026M00962788-I1Open ↗
08/13/2026M00962788-S1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M00962788-I1Open ↗