← Back
BuildNYC
Elevator apt, semi-fireproof without stores
Albany Kingston
15 ALBANY AVENUE · BIN 3053686
💬 Discuss this project
1904Year Built
6Stories
D1Building Class
R6AZoning
38,400 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized5 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Albany Kingston Housing Development Fund · 8,496 sf lot · 4.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofHDFC2p · 1 filing · 20 docs
Floor 6HDFC7p · 2 filings · 20 docs
Floor 5HDFC7p · 2 filings · 20 docs
Floor 4HDFC7p · 2 filings · 20 docs
Floor 3HDFC7p · 2 filings · 20 docs
Floor 2HDFC7p · 2 filings · 20 docs
Floor 1HDFC14p · 3 filings · 20 docs
CellarHDFC14p · 2 filings · 20 docs
BasementTenant-in-place apartment kitchen and bath renovation3p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Albany Crossing Apartments1603/22/2026
HDFC1004/09/2026
New York City Housing Authority304/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company501/08/2026
Aufgang Architects108/19/2025
Haider Engineering, P.E103/14/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
W J Professional Expediting203/21/2026
New York & Company1003/21/2026
Haider Engineering, P.E103/21/2026
Haider Engineering P E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HKS ConstructionScaffold407/08/2026
A & C Heating Servicesspecialty_contractor303/21/2026
A & C Heating ServicesPlumbing307/08/2026
Torres IvanElectrical103/21/2026
Chateau GCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851501/08/2026
Metric Consulting and Ins1803108/19/2025
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 10/27/2025, status Swarmp
07/14/2026
Signed off — Alteration
Filing for Moderate Tenant-in-Place Interior Apartment Renovation to include the removal and replacement of Kitchen countertops , appliances, . Bathroom fixtures and vanity. New Apartment Lighting. No change to egress, zoning, use, or occupancy.
B01254813-I1
06/17/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · closed
06/17/2026
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR…
HPD violation · closed
03/16/2026
Signed off — Alteration
GAS CONNECTION TO REPLACEMENT BOILERS.
B01317456-S1
180 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDMC Plumbing & Heating02/02/2026
DOB NOWBoiler EquipmentSigned-offDMC Plumbing & Heating11/26/2025
DOB NOWPlumbingSigned-offDMC Plumbing & Heating11/26/2025
DOB NOWGeneral ConstructionSigned-offA & C Heating Services11/26/2025
DOB NOWGeneral ConstructionSigned-offChateau GC08/25/2025
DOB NOWSidewalk ShedPermit IssuedHKS Construction10/06/2020
DOB NOWSidewalk ShedPermit IssuedHKS Construction03/14/2019
BISOTISSUEDRian Painting and Decorat06/22/2020
BISOTISSUEDRian Painting and Decorat10/11/2019
BISOTISSUEDRian Painting and Decorat08/31/2018
BISEQISSUEDHKS Construction02/14/2018
BISEQISSUEDHKS Construction02/21/2017
BISEQISSUEDArsenal Scaffold07/01/2014
BISOTISSUEDBRP Construction Group11/12/2013
BISPLISSUEDAmkay Plub and Heating01/08/2010
BISPLISSUEDA & C Heating Services02/06/2009
BISOTISSUEDA & C Combustion Services02/06/2009
BISOTISSUEDMDG Design & Construction02/04/2009
BISEQISSUEDJimmy G Construction05/08/2008
BISEQISSUEDJimmy G Construction02/25/2008
BISOTISSUEDMDG Design & Construction02/13/2008
BISPLISSUEDEbm Plumbing05/15/1995
BISFBISSUEDM. Esposito05/15/1995
2 projects · most recent 10/16/2019
FiledStatusContractorScope
10/16/2019Permit IssuedWCK Electric—
02/04/2019CompleteRichard Neu—
1 project · most recent 08/19/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/19/2025Signed-offChateau GCTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/30/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/23/2026Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
01/08/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/08/2026Tenant Protection Plan ComplianceLOUIS ARENAspecial
01/08/2026Heating SystemsLOUIS ARENAspecial
01/08/2026HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
01/08/2026HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
01/08/2026HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
01/08/2026Maintenance informationLOUIS ARENAenergy_progress
12/10/2025Tenant Protection Plan ComplianceLOUIS ARENAspecial
08/11/2025Tenant Protection Plan ComplianceSAMI HAJJAR P.Especial
08/11/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
08/11/2025Lighting controlsSAMI HAJJAR P.Eenergy_progress
08/11/2025VestibulesSAMI HAJJAR P.Eenergy_progress
08/11/2025Fenestration and door U-factor and product ratingsSAMI HAJJAR P.Eenergy_progress
08/11/2025Lighting in dwelling unitsSAMI HAJJAR P.Eenergy_progress
07/11/2025FinalSAMI HAJJAR P.Eprogress
139 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account