15 CAROLYN COURT
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5131961
💬 Discuss this project
1996Year Built
2Stories
A1Building Class
R3XZoning
3,540 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 9,954 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC107/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SUNRUN103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272107/23/2025
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Special Inspection (5)
10/08/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01259974-I1
07/30/2025
Permit issued — Solar
S01259974-I1-SL
07/23/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01259974-I1
07/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
07/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
07/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
07/22/2025
Special inspection requirement — Final
Walid Abdulla
07/22/2025
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/04/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC07/30/2025
BISOTISSUEDSUNRUN INSTALLATION SVC02/25/2022
BISPLISSUEDPAT MCCANN P&H INC11/25/2008
BISPLISSUEDKING'S PLAZA PLBG & HTG I04/15/2008
BISOTISSUEDS.J. VALENZA INCORP.01/28/2008
2 projects · most recent 07/23/2025
FiledStatusContractorScope
07/23/2025CompleteSUNRUN SOLAR ELECTL CORP—
02/28/2022CompleteSUNRUN SOLAR ELECTL CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
07/22/2025Fire-Resistant Penetrations and JointsWalid Abdullaspecial
07/22/2025Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
07/22/2025Energy Code Compliance InspectionsWalid Abdullaprogress
07/22/2025FinalWalid Abdullaprogress
07/22/2025Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/18/2026S01259974-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION4
02/04/2022540213393Open ↗
11/18/2008510024019Open ↗
09/17/2008510024019Open ↗
Showing 3 of 4 on file for this type
▸BISWORK PERMIT APPLICATION4
02/25/2022540213393Open ↗
11/25/2008510024019Open ↗
04/15/2008510024019Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications14
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/21/2009510024019Open ↗
12/15/2008510024019Open ↗
12/15/2008510024019Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026S01259974-I1Open ↗
08/26/2026S01259974-I1Open ↗
08/26/2026S01259974-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S01259974-I1Open ↗
08/26/2026S01259974-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/04/2022540213393Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
12/15/2008510024019Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
12/26/2007510024019Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/18/2026S01259974-I1Open ↗
▸Trade Schedules & Equipment5
▸BISSELF-CERT PLUMBING NOTICE3
03/02/2009510024019Open ↗
01/21/2009510024019Open ↗
05/09/2008510024019Open ↗
▸BISSCHEDULE B - PLUMBING2
11/18/2008510024019Open ↗
12/26/2007510024019Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
02/24/2022540213393Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/26/2007510024019Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
11/02/2022540213393Open ↗
02/25/2022540213393Open ↗
02/04/2022540213393Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/02/2022540213393Open ↗
▸BISNYCECC ANALYSIS1
02/04/2022540213393Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/04/2022540213393Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
11/02/2022540213393Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
02/04/2022540213393Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
11/02/2022540213393Open ↗
02/25/2022540213393Open ↗
02/23/2022540213393Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
02/23/2022540213393Open ↗
▸BISSoil Percolation Test - Drywell - 2008 CODE1
12/15/2008510024019Open ↗
▸Approvals, Objections & Sign-offs7
▸BISLETTERS - SUPPORTING DOCUMENTATION3
11/04/2022540213393Open ↗
11/04/2022540213393Open ↗
02/04/2022540213393Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/04/2022540213393Open ↗
04/21/2009510024019Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
12/26/2007510024019Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01259974-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
02/04/2022540213393Open ↗
04/21/2009510024019Open ↗
04/15/2008510024019Open ↗
Showing 3 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
11/02/2022540213393Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
02/23/2022540213393Open ↗
02/04/2022540213393Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/04/2022540213393Open ↗