| Owner | Filings | Most Recent |
|---|---|---|
| CL21 JUPITER | 14 | 09/13/2026 |
| CPPRAPT HOLDINGS | 2 | 09/13/2026 |
| PANTIGO | 17 | 08/29/2026 |
| FIFTEEN CENTRAL PARK EST CONDO | 145 | 07/08/2026 |
| FIFTEEN CENTRAL PARK WEST ASSOCIATI | 22 | 07/08/2026 |
| SOUTHFORK HOLDINGS | 4 | 07/08/2026 |
| CENTRAL PARK 24 | 12 | 07/08/2026 |
| W2001/Z 15 CENTRAL PARK W | 1 | 03/22/2026 |
| W2001/Z 15 CENTRAL PK WES | 1 | 03/22/2026 |
| W2001Z 15CPW REALTY | 36 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LAWRENCE K. SHAPIRO & ASSOCIATES | 1 | 07/02/2026 |
| MATTHEW MICHALSKI | 1 | 06/29/2026 |
| JMV CONSULTING ENGINEERING | 5 | 05/21/2026 |
| GERNER KRONICK + VALCARCEL ARCHITEC | 4 | 05/20/2026 |
| FROM ARCHITECTURE DPC | 2 | 05/07/2026 |
| AMM ENGINEERING PC | 1 | 04/21/2026 |
| ABS ENGINEERING, PLLC | 2 | 04/15/2026 |
| ROBERT A.M. STERN ARCHITECTS LLP | 1 | 04/15/2026 |
| ALTIERI SEBOR WIEBER LLC | 5 | 04/08/2026 |
| DANIELLE ALBERT ARCHITECT | 6 | 04/03/2026 |
| KZ ENGINEERING, P.C | 4 | 01/21/2026 |
| HANINGTON ENGINEERING CONSULTANTS | 12 | 10/17/2025 |
| VISUAL ARCHITECTURE | 1 | 10/17/2025 |
| RMBA LLC | 4 | 10/13/2025 |
| IP GROUP | 6 | 09/26/2025 |
| WJE ENGINEERS & ARCHITECTS, PC | 2 | 09/11/2025 |
| COOKFOX ARCHITECTS | 2 | 06/17/2025 |
| JONATHAN B. HELD AIA ARCHITECT | 1 | 06/16/2025 |
| EMTG CONSULTANTS INC | 4 | 06/05/2025 |
| CES ENGINEERING LLC | 31 | 05/20/2025 |
| WORKSHOP/APD ARCHITECTURE DPC | 2 | 05/20/2025 |
| HA STUDIO | 1 | 05/14/2025 |
| EC EXPEDITING SERVICES | 2 | 01/09/2025 |
| JAMES MALLOCH TAYLOR ARCHITECT, P.C | 3 | 10/11/2024 |
| ARCHETYPE ARCHITECTURE | 4 | 10/02/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| GILLMAN CONSULTING | 12 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 14 | 03/21/2026 |
| NEXUS CONSULTING NYC, INC | 12 | 03/21/2026 |
| RESOLUTION EXPEDITING | 12 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 11 | 03/21/2026 |
| J CALLAHAN CONSULTING | 8 | 03/21/2026 |
| JM ZONING, LLC. | 6 | 03/21/2026 |
| EC EXPEDITING AND SERVICES | 4 | 03/21/2026 |
| HS DESIGN STUDIO | 2 | 03/21/2026 |
| JONATHAN B. HELD A.I.A. | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| C-SQUARED CONTRACTING INC. | General Contractor | 20 | 07/08/2026 |
| SILVERLINING INTERIORS | General Contractor | 18 | 07/08/2026 |
| TACONIC BUILDERS INC | General Contractor | 13 | 07/08/2026 |
| TOKA HOME, LLC | General Contractor | 11 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 10 | 07/09/2026 |
| FONG CONSTRUCTION CORP | General Contractor | 10 | 07/08/2026 |
| NORDIC CUSTOM BUILDERS INC | General Contractor | 8 | 07/08/2026 |
| SEA-DAR ENTERPRISES, INC | General Contractor | 7 | 07/08/2026 |
| THE RENOVATED HOME 1 LTD | General Contractor | 7 | 07/08/2026 |
| S&H PLUMBING,INC | Plumbing | 6 | 07/08/2026 |
| HIGHLINE CONSTRUCTION GR | General Contractor | 6 | 09/29/2026 |
| FINE CONSTRUCTION SERVICE | General Contractor | 6 | 03/21/2026 |
| WEST NEW YORK RESTORATION OF CT | General Contractor | 5 | 07/08/2026 |
| LTB MECHANICAL CORP | General Contractor | 5 | 07/10/2026 |
| CAPITOL FIRE SPRINKLER CO | Fire Protection | 5 | 07/08/2026 |
| THOMAS STEPHENS CONSTRUCTION | General Contractor | 4 | 03/21/2026 |
| VANGUARD CONSTRUCTION AND | General Contractor | 4 | 07/08/2026 |
| THINK CONSTRUCTION LLC | General Contractor | 3 | 07/08/2026 |
| CBB PLUMBING CORP | Plumbing | 3 | 07/08/2026 |
| MILLER PLUMBING & HTG INC | Fire Protection | 3 | 07/08/2026 |
| SAGEWOOD CONSTRUCTION & D | General Contractor | 3 | 03/21/2026 |
| KG SPRINKLER CORP | Fire Protection | 3 | 07/08/2026 |
| GENESIS PLBG AND HTG CORP | Plumbing | 3 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 2 | 07/08/2026 |
| UBS BUILDERS, LLC | General Contractor | 2 | 09/15/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| 20/20 INSPECTIONS INC | 1471 | 1 | 07/02/2026 |
| CATALPA SPECIAL INSPECTIO | 2004 | 1 | 06/29/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 8 | 05/21/2026 |
| SHAHRISH SHUVO ENGINEERIN | 8524 | 8 | 05/20/2026 |
| ALAN MARGOLIN & ASSOC | 423 | 12 | 04/15/2026 |
| A DEGREE OF FREEDOM STRUC | 925 | 4 | 04/03/2026 |
| O'ROURKE ENGINEERING, LLC | 5873 | 6 | 04/03/2026 |
| KZ ENGINEERING, P.C. | 4665 | 2 | 01/21/2026 |
| AMM ENGINEERING PC | 725 | 1 | 09/11/2025 |
| AK ENGINEERING PC | 678 | 4 | 06/17/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | UBS BUILDERS, LLC | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | UBS BUILDERS, LLC | 08/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | COMPASS POINT LLC | 07/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL CORP | 07/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL CORP | 07/09/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 07/07/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | S. DONADIC INC | 07/01/2026 |
| DOB NOW | General Construction | Permit Issued | S. DONADIC INC | 06/23/2026 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/22/2026 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/22/2026 |
| DOB NOW | General Construction | Signed-off | SILVERLINING INTERIORS | 06/03/2026 |
| DOB NOW | General Construction | Signed-off | SILVERLINING INTERIORS | 06/02/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | WEST NEW YORK RESTORATION OF CT | 04/21/2026 |
| DOB NOW | General Construction | Permit Issued | A. PETER LUGER CONST INC | 04/06/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | CENTRAL CONSTRUCTION MGMT | 03/27/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 01/22/2026 |
| DOB NOW | Sprinklers | Permit Issued | DONATO PLMG INC | 01/22/2026 |
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 01/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | A. PETER LUGER CONST INC | 01/21/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | A. PETER LUGER CONST INC | 01/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | A. PETER LUGER CONST INC | 01/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL | 01/21/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | C-SQUARED CONTRACTING INC | 01/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL | 01/07/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | WEST NEW YORK RESTORATION | 12/11/2025 |
| DOB NOW | Plumbing | Signed-off | S&H PLUMBING,INC | 12/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | LTB MECHANICAL | 11/28/2025 |
| DOB NOW | General Construction | Permit Issued | HIGHLINE CONSTRUCTION GR | 11/26/2025 |
| DOB NOW | General Construction | Signed-off | HIGHLINE CONSTRUCTION GR | 10/01/2025 |
| DOB NOW | General Construction | Signed-off | NORDIC CUSTOM BUILDERS IN | 08/29/2025 |
| DOB NOW | Sprinklers | Permit Issued | CAPITOL FIRE SPRINKLER CO | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | THINK CONSTRUCTION LLC | 07/17/2025 |
| DOB NOW | Plumbing | Signed-off | ALKLEM PLUMBING INC | 07/09/2025 |
| DOB NOW | General Construction | Signed-off | THINK CONSTRUCTION LLC | 07/08/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 06/30/2025 |
| DOB NOW | Sprinklers | Permit Issued | H M SPRINKLER INC | 06/30/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/30/2025 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/30/2025 |
| DOB NOW | General Construction | Signed-off | THINK CONSTRUCTION LLC | 06/25/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/21/2026 | Permit Issued | LTB MECHANICAL CORP | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Iec LHW06 13,300 BTU · Fan Coil Indoor ×14 LHW04 8,100 BTU · Fan Coil Indoor ×4 HPY06 16,000 BTU · Fan Coil Indoor ×2 MSY08 23,900 BTU · Fan Coil Indoor ×2 |
| 09/26/2025 | Permit Issued | VANGUARD CONSTRUCTION AND | Heating and Air Conditioning Systems | Heat / Cool Iec VDY08 46 BTU · Fan Coil Indoor ×4 VDY22 122 BTU · Fan Coil Indoor ×4 VDY10 54 BTU · Fan Coil Indoor ×2 VDY12 70 BTU · Fan Coil Indoor ×2 VDY20 114 BTU · Fan Coil Indoor ×2 |
| 04/05/2024 | Permit Issued | C-SQUARED CONTRACTING INC | Air Conditioning Systems | — |
| 09/10/2019 | Permit Issued | TACONIC BUILDERS INC | Air Conditioning Systems, Heating Systems | Cooling First Company PHBCX-41-RH 1,240 CFM · Fan Coil Indoor ×8 Heating First Company PHBCX-41-LH 1,240 CFM · Ahu ×8 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Permit Issued | DONATO PLMG INC | 6 heads |
| 09/26/2025 | Signed-off | CAPITOL FIRE SPRINKLER CO | 114 heads |
| 04/05/2024 | Signed-off | STANDARD FIRE PROTECT LLC | 78 heads |
| 06/14/2022 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/21/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 04/15/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 04/08/2026 | Signed-off | S&H PLUMBING,INC | Gas, Water/Sanitary |
| 09/26/2025 | Permit Issued | WILLIAM C. GERAKARIS P&H | Water/Sanitary |
| 05/20/2025 | Signed-off | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 06/10/2024 | Signed-off | S&H PLUMBING,INC | Water/Sanitary |
| 04/05/2024 | Permit Issued | S&H PLUMBING,INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/25/2026 | Permit Issued | TOP NOTCH ELECTRIC INC | General Wiring |
| 08/21/2026 | Complete | ZIP ELECTRIC INC | General Wiring |
| 08/21/2026 | Complete | ZIP ELECTRIC INC | General Wiring |
| 08/18/2026 | Complete | APOLLO ELECTRIC INC. | — |
| 08/11/2026 | Permit Issued | Alpha Electric US Inc | General Wiring |
| 06/16/2026 | Complete | AE ELECTRIC INC | — |
| 04/24/2026 | Complete | V.I.P. ELECTL CONTR CORP | General Wiring |
| 04/17/2026 | Permit Issued | GLENDALE ELECTL CONTNG IN | General Wiring |
| 03/27/2026 | Permit Issued | EIS ELECTRIC CORP DBA | General Wiring |
| 03/03/2026 | Complete | GLENDALE ELECTL CONTNG IN | — |
| 02/06/2026 | Complete | BANNER ELECTRIC INC | General Wiring |
| 12/29/2025 | Permit Issued | ECO ELECTRICAL SERVCS LLC | — |
| 12/29/2025 | Permit Issued | ECO ELECTRICAL SERVCS LLC | General Wiring, Lighting |
| 12/11/2025 | Permit Issued | APOLLO ELECTRIC NYG, INC | General Wiring |
| 12/09/2025 | Permit Issued | APOLLO ELECTRIC NYG, INC | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/15/2026 | Permit Issued | DONATO PLUMBING, INC | 1 scope_items |
| 04/05/2024 | Signed-off | STANDARD FIRE PROTECT LLC | 2 scope_items |
| 09/03/2019 | — | — | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/21/2026 | Permit Issued | WEST NEW YORK RESTORATION | Sidewalk Shed |
| 09/21/2018 | Permit Issued | SCHNELLBACHER-SENDON GROU | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/23/2026 | Permit Issued | CENTRAL CONSTRUCTION MGMT | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/04/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 07/30/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 07/20/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 07/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/12/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/27/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/20/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/10/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/28/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 12/11/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 12/11/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/24/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/01/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2025 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 08/27/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/15/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 08/15/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/11/2026 | Tenant Protection Plan Compliance | Shahrish Shuvo | special |
| 08/11/2026 | Final | Randolph Gerner | progress |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | Shahrish Shuvo | special |
| 08/11/2026 | Interior lighting power | Shahrish Shuvo | energy_progress |
| 08/11/2026 | Sprayed fire-resistant materials | Shahrish Shuvo | special |
| 08/11/2026 | Lighting controls | Shahrish Shuvo | energy_progress |
| 07/01/2026 | Post-installed Anchors | JACOB HAAS | special |
| 06/04/2026 | HVAC-R and service water piping design and insulation | William Ryan | energy_progress |
| 06/04/2026 | Final | William Ryan | progress |
| 06/04/2026 | Post-installed Anchors | William Ryan | special |
| 06/04/2026 | Mechanical Systems | William Ryan | special |
| 06/04/2026 | Maintenance information | William Ryan | energy_progress |
| 06/04/2026 | Energy Code Compliance Inspections | William Ryan | progress |
| 06/04/2026 | HVAC-R and service water heating equipment | William Ryan | energy_progress |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 06/04/2026 | HVAC-R and service water heating system controls | William Ryan | energy_progress |
| 06/04/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | ERIC BERLENT | special |
| 05/26/2026 | Final | MATTHEW MICHALSKI | progress |
| 05/26/2026 | Post-installed Anchors | ERIC BERLENT | special |
| 05/20/2026 | Fire-Resistant Penetrations and Joints | William Ryan | special |
| 05/20/2026 | Energy Code Compliance Inspections | William Ryan | progress |
| 05/20/2026 | Lighting controls | William Ryan | energy_progress |
| 05/20/2026 | Interior lighting power | William Ryan | energy_progress |
| 05/20/2026 | Final | William Ryan | progress |