← Back
BuildNYC
Elevator apt, fireproof without stores
15 CLAREMONT AVENUE
MANHATTAN · Morningside Heights · BIN 1059818
💬 Discuss this project
1909Year Built
10Stories
D3Building Class
R8Zoning
55,960 sfGross Floor Area
27Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SAFE
Elevator apt, fireproof without stores · Owner of record: Trustees of Columbia University · 8,400 sf lot · 6.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsFISP Conditions Repairs1 filing
Roof3p · 1 filing · 20 docs
Floor 101 filing · 12 docs
Floor 9Unit 933p · 2 filings · 12 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation2 filings · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Columbia Residential1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M Hashas1403/21/2026
Superstructures Engineering + Architects103/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Essential Design & BuildGeneral Contractor603/21/2026
Andamio ScaffoldingScaffold407/08/2026
Twins ElectricElectrical303/21/2026
Atn ElectricElectrical203/21/2026
Lawrence Exterior Restorationspecialty_contractor203/21/2026
Authentic PlumbingPlumbing207/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Site Safety8555105/01/2023
Superstructures Engineering374105/01/2023
Cole Technologies/Control1290504/20/2023
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
07/17/2026
Elevator Category 1 inspection report filed
07/19/2025
Closed: Failed to file FISP cycle 9B technical report by 2/21/2023
DOB violation · closed on the city's record
07/19/2025
Closed: Failed to file FISP cycle 8B technical report by 02/21/2018
DOB violation · closed on the city's record
01/31/2025
Signed off — Alteration
Exterior facade repairs as per the plans filed including: Removal/ repairs/ replacement of terra-cotta, brick masonry, stone, coping and joint sealant. Existing railing post re-anchorage.
M00850668-I1
140 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding02/28/2024
DOB NOWSuspended ScaffoldSigned-offLawrence Exterior Rest Co01/10/2024
DOB NOWGeneral ConstructionSigned-offLawrence Exterior Restoration10/26/2023
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding06/07/2023
DOB NOWMechanical SystemsSigned-offEssential Design & Build10/12/2022
DOB NOWPlumbingSigned-offAuthentic Plumbing04/22/2022
DOB NOWGeneral ConstructionSigned-offEssential Design & Build04/21/2022
BISOTISSUEDGreenway USA07/10/2019
BISPLISSUEDAbsolute Plumbing & Heating04/17/2019
BISOTISSUEDF K General Contracting10/01/2018
BISOTISSUEDF K General Contracting07/03/2018
BISPLISSUEDAbsolute Plumbing & Heating05/04/2018
BISOTISSUEDColumbia University04/05/2017
BISEQISSUEDEverest Scaffolding11/17/2015
BISMHISSUEDColumbia University04/28/2015
BISOTISSUEDColumbia University04/10/2015
BISOTISSUEDHenry Restoration07/21/2014
BISEQISSUEDEverest Scaffolding06/24/2014
BISOTISSUEDColumbia University09/17/2012
BISPLISSUEDAbsolute Plumbing & Heating08/30/2012
BISOTISSUEDColumbia University03/13/2012
BISOTISSUEDJuno Contracting03/30/2010
BISEQISSUEDOutdoor Installations02/24/2010
BISOTISSUEDColumbia University10/13/2009
BISOTISSUEDJuno Contracting04/01/2009
BISEQISSUEDOutdoor Installations03/09/2009
BISOTISSUEDJuno Contracting09/25/2008
BISEQISSUEDOutdoor Installations03/31/2008
BISOTISSUEDColumbia Uiniversity02/15/2008
BISOTISSUEDColumbia Uiniversity08/16/2007
BISEQISSUEDWest New York Restoration of CT08/09/2007
BISEQISSUEDWest New York Restoration of CT08/02/2007
BISOTISSUEDHenry Restoration06/13/2006
BISOTISSUEDColumbia University03/02/2006
BISOTISSUEDColumbia University10/27/2005
BISPLISSUEDThe Right Connection P&H07/12/2005
BISPLISSUEDThe Right Connection P&H02/04/2005
BISOTISSUEDColumbia Auniversity06/03/2004
BISOTISSUEDColumbia University03/24/2004
BISOTISSUEDColumbia University03/27/2002
+ 8 more permits on file
4 projects · most recent 05/03/2023
General Wiring
FiledStatusContractorScope
05/03/2023CompleteBorowide Elect'l Contractors—
01/03/2023CompleteHeso ElectricalGeneral Wiring
08/11/2019CompletePlatinum Electrical ServiceGeneral Wiring
07/08/2019CompleteLive Wire Electric 1General Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/13/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/05/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/22/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
04/21/2023Maintenance informationGEORGE ANDERSENenergy_progress
04/21/2023Energy Code Compliance InspectionsGEORGE ANDERSENprogress
04/21/2023FinalGEORGE ANDERSENprogress
04/21/2023Mechanical SystemsGEORGE ANDERSENspecial
04/21/2023Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
04/21/2023Heating SystemsGEORGE ANDERSENspecial
04/21/2023HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
04/21/2023HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
04/21/2023HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
03/31/2023FinalGEORGE ANDERSENprogress
03/31/2023HVAC-R and service water piping design and insulationGEORGE ANDERSENenergy_progress
03/31/2023Heating SystemsGEORGE ANDERSENspecial
03/31/2023Mechanical SystemsGEORGE ANDERSENspecial
03/31/2023Energy Code Compliance InspectionsGEORGE ANDERSENprogress
03/31/2023Maintenance informationGEORGE ANDERSENenergy_progress
03/31/2023HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
03/31/2023HVAC-R and service water heating equipmentGEORGE ANDERSENenergy_progress
03/31/2023Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
03/27/2023Tenant Protection Plan ComplianceKHALID ALGENDEspecial
03/27/2023Post-installed AnchorsDavid Mayspecial
03/27/2023MasonryDavid Mayspecial
03/27/2023FinalDavid Mayprogress
02/22/2023HVAC-R and service water heating system controlsGEORGE ANDERSENenergy_progress
02/22/2023Fire-Resistant Penetrations and JointsGEORGE ANDERSENspecial
02/22/2023Heating SystemsGEORGE ANDERSENspecial
Latest 25 of 48.
212 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account