← Back
Lodge room
15 Gramercy Park South
15 EAST 20 STREET · Gramercy · BIN 1090418
💬 Discuss this project
1844Year Built
13Stories
P2Building Class
R8BZoning
85,279 sfGross Floor Area
49Units
LL97 CoveredRent Stabilized19 Open Violations 17 unresolved · 2 paperwork only ▸
Lodge room · Owner of record: THE NATIONAL ARTS CLUB · 10,902 sf lot · 7.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Floor 24p · 1 filing · 18 docs
Floor 114p · 3 filings · 20 docs
Cellar3p · 1 filing · 18 docs
Sub-Basement3p · 1 filing · 18 docs
Site & exterior10p · 4 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PRESERV BUILDING RESTORATION MANAGE507/08/2026
CLASSIC CONSULTING GROUP404/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION403/21/2026
CAVALRY203/21/2026
NYCCODE203/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRESERV BLD RESTOR MGT INGeneral Contractor807/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor304/09/2026
URBAN INTELLIGENCE, INCGeneral Contractor303/21/2026
RUN RITE MECHANICAL CORPGeneral Contractor107/08/2026
5 J'S ELECTL CONTS CORPElectrical103/22/2026
ZATOS PLBG AND HTG INCPlumbing107/08/2026
ALL WIRED UP ELECTRICAL CElectrical103/22/2026
EXTERIOR WALL & BUILDINGGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BONE/LEVINE ARCHITECTS307104/22/2024
DEAN MENDEZ ARCHITECT, P.8621104/22/2024
VALERIO ASSOCIATES, P.C.1379104/22/2024
DOMANI INSPECTION SERVICE843212/17/2021
Building Lifecycle
All (64)Filed (8)Permit Issued (11)Signed Off (1)Violation (26)Inspection (4)Special Inspection (14)
11/17/2025
Violation issued (HPD, closed)
I
07/08/2025
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2022 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01015752-I1
05/29/2025
Permit issued — Protection and Mechanical Methods
M01054034-I1-PMM
05/29/2025
Permit issued — Protection and Mechanical Methods
M01025991-I1-PMM
04/30/2025
Permit issued — General Construction
M00977178-I1-GC
02/14/2025
Permit issued — Supported Scaffold
M01016869-I1-SF
12/27/2024
Permit issued — Sidewalk Shed
M01015752-I1-SH
06/05/2024
Permit issued — Protection and Mechanical Methods
M01025991-I1-PMM
06/04/2024
Filed — Alteration
INSTALLATION OF TEMPORARY BETAMAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01025991-I1
06/04/2024
Filed — Alteration
M01054034-I1
05/03/2024
Permit issued — General Construction
M00977178-I1-GC
04/22/2024
Filed — Alteration
Facade repairs as shown on plans. No change to use, egress or occupancy.
M00977178-I1
03/11/2024
Permit issued — Supported Scaffold
M01016869-I1-SF
03/08/2024
Filed — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01016869-I1
03/07/2024
Filed — Alteration
INSTALLATION OF SIDEWALK SHED FOR PEDESTRIAN SAFETY DURING CONSTRUCTION. SIDEWALK SHED SHALL COMPLY WITH NYCC 2022 CHAPTER 33 . NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01015752-I1
03/07/2024
Permit issued — Sidewalk Shed
M01015752-I1-SH
12/19/2023
Special inspection requirement — Masonry
Joseph Levine
12/19/2023
Special inspection requirement — Tenant Protection Plan Compliance
Dean Mendez
12/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN VALERIO
12/14/2023
Special inspection requirement — Final
Joseph Levine
03/29/2023
Violation issued (HPD, closed)
A
11/02/2022
Violation issued (HPD, closed)
I
09/13/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/22/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/02/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2022
Permit issued — Plumbing
M00706406-I1-PL
04/13/2022
Filed — Alteration
M00706406-I1
03/08/2022
Violation issued (HPD, closed)
A
12/17/2021
Filed — Alteration
Addition of VRF air conditioning to Galleries, Lower Reception, Salon & Ballroom areas. PAA for installed equipment model update (same capacity using two 10 Ton modules twinned as one condenser instead of one 20 Ton module.)
M00518268-P1
12/16/2021
Permit issued — Mechanical Systems
M00518268-I1-MS
12/16/2021
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
12/16/2021
Special inspection requirement — Final
JOHN MCMONAGLE
07/28/2021
Filed — Alteration
Addition of VRF air conditioning to Galleries, Lower Reception, Salon & Ballroom areas. PAA for installed equipment model update (same capacity using two 10 Ton modules twinned as one condenser instead of one 20 Ton module.)
M00518268-I1
04/16/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
01/14/2013
Violation issued (HPD, open)
B
07/24/2012
Violation issued (ECB, closed)
Elevators
02/04/1999
Violation issued (HPD, open)
C
02/04/1999
Violation issued (HPD, open)
C
07/25/1990
Violation issued (HPD, open)
A
07/31/1986
Violation issued (HPD, open)
B
07/31/1986
Violation issued (HPD, open)
B
07/31/1986
Violation issued (HPD, open)
B
07/31/1986
Violation issued (HPD, open)
B
07/31/1986
Violation issued (HPD, open)
B
06/24/1986
Violation issued (HPD, open)
B
01/20/1982
Violation issued (HPD, closed)
A
01/20/1982
Violation issued (HPD, closed)
A
10/30/1978
Violation issued (HPD, open)
B
10/30/1978
Violation issued (HPD, open)
B
10/30/1978
Violation issued (HPD, open)
B
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN05/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN05/29/2025
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN04/30/2025
DOB NOWSupported ScaffoldPermit IssuedCLASSIC CONSULTING GROUP02/14/2025
DOB NOWSidewalk ShedSigned-offEXTERIOR WALL & BUILDING12/27/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPRESERV BLD RESTOR MGT IN06/05/2024
DOB NOWGeneral ConstructionPermit IssuedPRESERV BLD RESTOR MGT IN05/03/2024
DOB NOWSupported ScaffoldPermit IssuedCLASSIC CONSULTING GROUP03/11/2024
DOB NOWSidewalk ShedSigned-offURBAN INTELLIGENCE, INC03/07/2024
DOB NOWPlumbingSigned-offZATOS PLBG AND HTG INC05/05/2022
DOB NOWMechanical SystemsSigned-offRUN RITE MECHANICAL CORP12/16/2021
BISOTISSUEDPRESERV BLD RESTOR MGT IN07/03/2023
BISOTISSUEDPRESERV BLD RESTOR MGT IN06/22/2022
BISOTISSUEDZOOM CONTRACTING INC04/19/2022
BISOTISSUEDPRESERV BLD RESTOR MGT IN04/01/2022
BISOTISSUEDPRESERV BLD RESTOR MGT IN03/22/2021
BISOTISSUEDPRESERV BLD RESTOR MGT IN09/17/2020
BISOTISSUEDPRESERV BLD RESTOR MGT IN09/09/2020
BISOTISSUEDZOOM CONTRACTING INC09/09/2020
BISOTISSUEDDJM NYC, LLC06/29/2018
1 project · most recent 12/17/2021
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/17/2021Signed-offRUN RITE MECHANICAL CORPAir Conditioning Systems, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-P240TSNU-A (Two P120 modules) 2,400,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck ECV-10H-VG-FM 900 CFM · Erv ×1
8 projects · most recent 08/05/2024
General Wiring
FiledStatusContractorScope
08/05/2024CompleteV ELECTRIC NY INCGeneral Wiring
03/21/2024Complete5 J'S ELECTL CONTS CORP—
03/30/2021CompleteSINCHRONY ELECTRIC INC37 meters, 1 new_meters
10/21/2020CompleteALL WIRED UP ELECTRICAL CGeneral Wiring
07/16/2019CompleteSINCHRONY ELECTRIC INCGeneral Wiring
10/09/2018Permit IssuedNEE ELECTRICAL, LLCGeneral Wiring
06/13/2018CompleteDUDLEY & ASSOC. LIC. ELECGeneral Wiring
05/21/2018Permit IssuedDUDLEY & ASSOC. LIC. ELECGeneral Wiring
1 project · most recent 03/08/2024
Scaffold
FiledStatusContractorScope
03/08/2024Permit IssuedCLASSIC CONSULTING GROUPScaffold
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
09/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/02/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/19/2023MasonryJoseph Levinespecial
12/19/2023Tenant Protection Plan ComplianceDean Mendezspecial
12/14/2023Structural Stability – Alterations of existing buildingsJOHN VALERIOspecial
12/14/2023FinalJoseph Levineprogress
12/16/2021Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
12/16/2021HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
12/16/2021Maintenance informationJOHN MCMONAGLEenergy_progress
12/16/2021Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
12/16/2021HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
12/16/2021HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
12/16/2021Shutoff dampersJOHN MCMONAGLEenergy_progress
12/16/2021Mechanical SystemsJOHN MCMONAGLEspecial
12/16/2021Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
12/16/2021FinalJOHN MCMONAGLEprogress
▾Documents — 103 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026M00518268-P1Request digital key ↗
09/03/2026M00518268-I1Request digital key ↗
09/02/2026M00706406-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION12
02/07/2024123431063Open ↗
04/11/2022123761385Open ↗
03/25/2022123761385Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION4
04/20/2022123761385Open ↗
09/10/2020123535594Open ↗
09/09/2020123761385Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLPC Approval/Permit4
09/03/2026M00518268-I1Open ↗
08/13/2026M00518268-P1Open ↗
08/13/2026M00706406-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026M00977178-I1Open ↗
08/24/2026M00518268-P1Open ↗
08/24/2026M00518268-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026M00518268-I1Open ↗
09/02/2026M00706406-I1Open ↗
08/27/2026M01016869-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
07/02/2019123761385Open ↗
07/02/2019123761385Open ↗
06/03/2019123535594Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026M00977178-I1Open ↗
09/01/2026M00977178-I1Open ↗
09/01/2026M00977178-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
07/02/2019123761385Open ↗
06/03/2019123535594Open ↗
06/27/2018123431063Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
07/02/2019123761385Open ↗
06/03/2019123535594Open ↗
06/27/2018123431063Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
08/06/2019123535594Open ↗
06/27/2018123431063Open ↗
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
08/07/2018123472376Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/03/2026M00518268-I1Open ↗
09/02/2026M00706406-I1Open ↗
08/27/2026M00977178-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/02/2019123761385Open ↗
08/07/2018123472376Open ↗
06/27/2018123431063Open ↗
▸BISASBESTOS: VARIANCE (DEP FORM V5)1
09/04/2020123535594Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
01/12/2024123431063Open ↗
09/23/2020123761385Open ↗
09/23/2020123761385Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs7
▸BISLANDMARKS APPROVAL5
08/06/2019123535594Open ↗
08/06/2019123535594Open ↗
07/03/2019123761385Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF1
02/08/2024123431063Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/08/2024123431063Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT6
03/29/2022123761385Open ↗
09/29/2020123761385Open ↗
07/02/2019123761385Open ↗
Showing 3 of 6 on file for this type
▸BISWELDERS AFFIDAVIT1
07/02/2018123431063Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
02/07/2024123431063Open ↗
▸Filing & Intake Forms9
▸BISEFILING COVER SHEET4
07/02/2019123761385Open ↗
06/03/2019123535594Open ↗
08/07/2018123472376Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM3
04/20/2022123761385Open ↗
09/10/2020123535594Open ↗
04/27/2020123472376Open ↗
▸BISADDITIONAL INFORMATION2
04/11/2022123761385Open ↗
09/29/2020123761385Open ↗
▸Other Documents2
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
07/03/2019123761385Open ↗
▸DOB NOWProof of Historic Building1
08/13/2026M00706406-I1Open ↗