← Back
BuildNYC
Elevator apt, fireproof without stores
15 EAST 63RD STREET
MANHATTAN · BIN 1041020
💬 Discuss this project
1901Year Built
5Stories
D3Building Class
R8BZoning
—Gross Floor Area
10Units
13 Active Violations 8 unresolved · 5 paperwork only 19 likely answered 1 old, status unconfirmed ▸
Elevator apt, fireproof without stores · 4.41 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof63rd St Townhouse LLC1 filing · 14 docs
Floor 663rd St Townhouse LLCUnder Construction2p · 1 filing · 9 docs
Floor 563rd St Townhouse LLCUnder Construction1p · 1 filing · 9 docs
Floor 463rd St Townhouse LLCUnder Construction2p · 1 filing · 9 docs
Floor 363rd St Townhouse LLCUnder Construction1p · 1 filing · 9 docs
Floor 263rd St Townhouse LLCUnder Construction1p · 1 filing · 9 docs
Floor 163rd St Townhouse LLCUnder Construction1p · 2 filings · 20 docs
Mezzanine63rd St Townhouse LLCUnder Construction2p · 1 filing · 9 docs
Cellar63rd St Townhouse LLCUnder Construction1p · 2 filings · 20 docs
Sub-Cellar63rd St Townhouse LLCUnder Construction3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
63rd St Townhouse810/13/2026
Nestor403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Craft Engineering Studio109/14/2026
CES Engineering209/04/2026
Olson Kundig509/03/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arber Electric ServiceElectrical203/21/2026
Atset Electrical ContractingElectrical203/21/2026
Citi-Wide ElectricElectrical103/21/2026
SDCGeneral Contractor107/22/2026
Forte Express P & HPlumbing107/25/2026
Building Lifecycle
All (124)Filed (6)Permit Issued (2)Violation (60)Objection (26)Special Inspection (30)
10/14/2026
Objection raised — Other
10/14/2026
Objection raised — Other
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/25/2026
Objection resolved — Resolved
09/16/2026
Objection raised — Other
09/16/2026
Objection raised — Other
09/16/2026
Objection raised — Scope
09/16/2026
Objection raised — Other
09/14/2026
Filed — Alteration CO
CHANGE IN USE FROM A MULTIPLE DWELLING TO A SINGLE-FAMILY RESIDENCE. INTERIOR AND EXTERIOR RENOVATION. REMOVAL OF EXISTING 6TH FLOOR. WORK INCLUDES STRUCTURAL, MECHANICAL, PLUMBING AND SPRINKLER SUBSEQUENT APPLICATIONS.
M01439528-S1
09/14/2026
Objection raised — Other
09/14/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Other
09/11/2026
Objection raised — Fire_Protection
09/11/2026
Objection raised — Zoning
09/11/2026
Objection raised — Structural
09/11/2026
Objection raised — Zoning
09/11/2026
Objection raised — Mechanical
09/04/2026
Filed — Alteration CO
CHANGE IN USE FROM A MULTIPLE DWELLING TO A SINGLE-FAMILY RESIDENCE. INTERIOR AND EXTERIOR RENOVATION. REMOVAL OF EXISTING 6TH FLOOR. WORK INCLUDES STRUCTURAL, MECHANICAL, PLUMBING AND SPRINKLER SUBSEQUENT APPLICATIONS.
M01439528-S2
09/04/2026
Filed — Alteration CO
CHANGE IN USE FROM A MULTIPLE DWELLING TO A SINGLE-FAMILY RESIDENCE. INTERIOR AND EXTERIOR RENOVATION. REMOVAL OF EXISTING 6TH FLOOR. WORK INCLUDES STRUCTURAL, MECHANICAL, PLUMBING AND SPRINKLER SUBSEQUENT APPLICATIONS.
M01439528-S3
09/03/2026
Filed — Alteration CO
CHANGE IN USE FROM A MULTIPLE DWELLING TO A SINGLE-FAMILY RESIDENCE. INTERIOR AND EXTERIOR RENOVATION. REMOVAL OF EXISTING 6TH FLOOR. WORK INCLUDES STRUCTURAL, MECHANICAL, PLUMBING AND SPRINKLER SUBSEQUENT APPLICATIONS.
M01439528-I1
08/28/2026
Special inspection requirement — Maintenance information
08/28/2026
Special inspection requirement — Lighting in dwelling units
08/28/2026
Special inspection requirement — Interior lighting power
08/28/2026
Special inspection requirement — Metering
08/28/2026
Special inspection requirement — Lighting controls
08/28/2026
Special inspection requirement — Duct leakage testing, insulation and design
08/28/2026
Special inspection requirement — Shutoff dampers
08/26/2026
Special inspection requirement — Lighting in dwelling units
08/26/2026
Special inspection requirement — Preliminary
08/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/26/2026
Special inspection requirement — Sprayed fire-resistant materials
08/26/2026
Special inspection requirement — Post-installed Anchors
08/26/2026
Special inspection requirement — Energy Code Compliance Inspections
08/26/2026
Special inspection requirement — Fire-Resistance Rated Construction
08/26/2026
Special inspection requirement — Air barrier - visual inspection
08/26/2026
Special inspection requirement — Fenestration areas
08/26/2026
Special inspection requirement — Insulation placement and R values
08/26/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
08/26/2026
Special inspection requirement — Fenestration air leakage
08/25/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
08/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/18/2026
Special inspection requirement — Sprayed fire-resistant materials
08/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
08/18/2026
Special inspection requirement — Structural Steel - Welding
08/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
08/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
08/18/2026
Special inspection requirement — Demolition
08/18/2026
Special inspection requirement — Concrete - Cast-In-Place
08/18/2026
Special inspection requirement — Structural Steel - High Strength Bolting
08/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 124 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedForte Express P & H07/23/2026
DOB NOWGeneral ConstructionPermit IssuedSDC07/21/2026
BISOTISSUEDBerta Marble and Granite09/23/2004
BISPLISSUEDJ.barone and Co09/08/2004
BIS—ISSUEDMarianne Nestor09/01/2004
BISPLISSUEDJ.barone and Co03/11/2003
BISOTISSUEDBerta Marble and Granite02/14/2003
BIS—ISSUEDMarianne Nestor02/03/2003
BISPLISSUEDJ. Barone and Co05/20/1992
BISBLISSUEDJ Barone & Co11/18/1991
1 project · most recent 09/14/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/14/2026——Heating and Air Conditioning Systems
Heat / Cool
Samsung AG015DSVAFG/AA 168,000 BTU · Vrf Indoor ×3
1 project · most recent 09/14/2026
Sprinkler System
FiledStatusContractorScope
09/14/2026——Sprinkler System
3 projects · most recent 09/14/2026
Gas Water/Sanitary Storm
FiledStatusContractorScope
09/14/2026——Gas, Storm, Water/Sanitary
06/04/2026Permit IssuedForte Express P & HGas, Water/Sanitary
———Gas, Water/Sanitary
1 project · most recent 09/14/2026
Steel Concrete Masonry
FiledStatusContractorScope
09/14/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
08/28/2026Maintenance information—energy_progress
08/28/2026Lighting in dwelling units—energy_progress
08/28/2026Interior lighting power—energy_progress
08/28/2026Metering—energy_progress
08/28/2026Lighting controls—energy_progress
08/28/2026Duct leakage testing, insulation and design—energy_progress
08/28/2026Shutoff dampers—energy_progress
08/26/2026Lighting in dwelling units—energy_progress
08/26/2026Preliminary—progress
08/26/2026Fire-Resistant Penetrations and Joints—special
08/26/2026Sprayed fire-resistant materials—special
08/26/2026Post-installed Anchors—special
08/26/2026Energy Code Compliance Inspections—progress
08/26/2026Fire-Resistance Rated Construction—progress
08/26/2026Air barrier - visual inspection—energy_progress
08/26/2026Fenestration areas—energy_progress
08/26/2026Insulation placement and R values—energy_progress
08/26/2026Fenestration and door U-factor and product ratings—energy_progress
08/26/2026Fenestration air leakage—energy_progress
08/25/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
08/25/2026Fire-Resistant Penetrations and Joints—special
08/18/2026Sprayed fire-resistant materials—special
08/18/2026HVAC-R and service water heating equipment—energy_progress
08/18/2026Structural Steel - Welding—special
08/18/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 42.
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026M01406656-S1Request digital key ↗
08/16/2026M01406656-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWLPC Approval/Permit2
08/16/2026M01406656-I1Open ↗
08/16/2026M01406656-S1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026M01439528-S3Open ↗
10/04/2026M01439528-S2Open ↗
10/04/2026M01439528-S1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026M01406656-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
10/04/2026M01439528-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
10/04/2026M01439528-S1Open ↗
10/04/2026M01439528-S2Open ↗
10/04/2026M01439528-I1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
10/04/2026M01439528-I1Open ↗