← Back
BuildNYC
One story - permanent living quarter
15 EAST CHESHIRE PLACE
STATEN ISLAND · BIN 5006539
💬 Discuss this project
1952Year Built
1Stories
A2Building Class
R3XZoning
1,066 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
One story - permanent living quarter · 8,600 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 15p · 2 filings · 12 docs
Cellar6p · 2 filings · 12 docs
Site & exteriorBoundary fence installation1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M Engineering Design & Inspection111/09/2021
Infinity Design306/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Steel Land NYspecialty_contractor303/21/2026
K-Lash ConstructionGeneral Contractor107/08/2026
Top Dog Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616111/09/2021
Infinity Design Consultan2760105/26/2021
Building Lifecycle
05/11/2026
Work without a permit. Noted : at time of inspection,observed at exposure 1 at ground floor level the garage door has been altered ,half of the…
ECB violation · open
09/30/2022
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
S00626471-I1-GC
08/08/2022
Permit issued — General Construction
S00626471-I1-GC
05/17/2022
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/17/2022
Special inspection requirement — Masonry
FAHAD FATEH
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedK-Lash Construction08/08/2022
DOB NOWGeneral ConstructionPermit IssuedSteel Land NY06/01/2021
DOB NOWPlumbingSigned-offTop Dog Plumbing & Heating05/30/2021
1 project · most recent 06/15/2021
Gas Water/Sanitary
FiledStatusContractorScope
06/15/2021Signed-offTop Dog Plumbing & HeatingGas, Water/Sanitary
1 project · most recent 06/08/2021
General Wiring
FiledStatusContractorScope
06/08/2021Permit IssuedAccurate ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/14/2021Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
08/18/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/11/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/17/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/17/2022MasonryFAHAD FATEHspecial
05/26/2021Lighting in dwelling unitsSamy Abouzidenergy_progress
05/25/2021Fire-Resistant Penetrations and JointsSamy Abouzidspecial
05/15/2021FinalSamy Abouzidprogress
15 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account