← Back
One story - permanent living quarter
15 EAST CHESHIRE PLACE
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5006539
💬 Discuss this project
1952Year Built
1Stories
A2Building Class
R3XZoning
1,066 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
One story - permanent living quarter · 8,600 sf lot · 0.12 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Floor 15p · 2 filings · 12 docs
Cellar6p · 2 filings · 12 docs
Site & exterior1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION111/09/2021
INFINITY DESIGN CONSULTANT INC306/15/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GREEN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STEEL LAND NY INCGeneral Contractor303/21/2026
K-LASH CONSTRUCTION CORPGeneral Contractor107/08/2026
TOP DOG PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616111/09/2021
INFINITY DESIGN CONSULTAN2760105/26/2021
Building Lifecycle
All (42)Filed (4)Permit Issued (3)Violation (1)Inspection (3)Objection (26)Special Inspection (5)
05/11/2026
Violation issued (ECB, open)
Construction
08/08/2022
Permit issued — General Construction
S00626471-I1-GC
05/17/2022
Special inspection requirement — Concrete - Cast-In-Place
FAHAD FATEH
05/17/2022
Special inspection requirement — Masonry
FAHAD FATEH
02/22/2022
Objection raised — Scope
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
02/22/2022
Objection raised — Structural
02/22/2022
Objection resolved — Addressed
11/09/2021
Filed — Alteration
Erecting a boundary wall (fence) on the lot line as per plan. No change to use, egress or occupancy under this application.
S00626471-I1
09/14/2021
Inspection — Administrative Rejection Boiler Certification
Administrative Rejection
View inspection ↗
08/18/2021
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/11/2021
Inspection — No Access-Final Boiler Equipment Inspection
No Access
View inspection ↗
06/15/2021
Filed — Alteration
Filing for a plumbing job for the renovation of a one story building as per plan.
S00528617-P1
06/01/2021
Permit issued — General Construction
S00522893-I1-GC
05/30/2021
Permit issued — Plumbing
S00528617-I1-PL
05/26/2021
Filed — Alteration
Renovation of the existing building as per plan. No change to use, egress or occupancy under this application.
S00522893-I1
05/26/2021
Filed — Alteration
Filing for a plumbing job for the renovation of a one story building as per plan.
S00528617-I1
05/26/2021
Special inspection requirement — Lighting in dwelling units
Samy Abouzid
05/25/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Samy Abouzid
05/15/2021
Special inspection requirement — Final
Samy Abouzid
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedK-LASH CONSTRUCTION CORP08/08/2022
DOB NOWGeneral ConstructionPermit IssuedSTEEL LAND NY INC06/01/2021
DOB NOWPlumbingSigned-offTOP DOG PLBG & HTG CORP05/30/2021
1 project · most recent 06/15/2021
Gas Water/Sanitary
FiledStatusContractorScope
06/15/2021Signed-offTOP DOG PLBG & HTG CORPGas, Water/Sanitary
1 project · most recent 06/08/2021
General Wiring
FiledStatusContractorScope
06/08/2021Permit IssuedACCURATE ELEC'L CORP.General Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/14/2021Administrative Rejection Boiler CertificationAdministrative RejectionView ↗
08/18/2021Pass-Final Boiler Equipment InspectionPassView ↗
08/11/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
05/17/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
05/17/2022MasonryFAHAD FATEHspecial
05/26/2021Lighting in dwelling unitsSamy Abouzidenergy_progress
05/25/2021Fire-Resistant Penetrations and JointsSamy Abouzidspecial
05/15/2021FinalSamy Abouzidprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026S00522893-I1Request digital key ↗
08/25/2026S00528617-I1Request digital key ↗
08/25/2026S00528617-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026S00522893-I1Open ↗
08/25/2026S00528617-P1Open ↗
08/25/2026S00528617-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026S00522893-I1Open ↗
08/28/2026S00522893-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026S00522893-I1Open ↗
08/26/2026S00626471-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026S00522893-I1Open ↗
08/25/2026S00528617-P1Open ↗
08/25/2026S00528617-I1Open ↗