← Back
Large suburban residence
15 GRYMES HILL ROAD
STATEN ISLAND · West New Brighton-Silver Lake-Grymes Hill · BIN 5015191
💬 Discuss this project
1930Year Built
2.5Stories
A3Building Class
R1-1Zoning
—Gross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Large suburban residence · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC112/13/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BIG CITY PAVING & CONSTRUCTIONGeneral Contractor203/21/2026
MONELLO ENTERPRISES INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216112/13/2022
Building Lifecycle
All (8)Filed (1)Permit Issued (2)Signed Off (1)Violation (1)Special Inspection (3)
04/26/2023
Signed off — Alteration
IN-KIND REPLACEMENT OF APPROXIMATELY 48' OF AN EXISTING CONCRETE RETAINING WALL LOCATED TO THE NORTH EAST CORNER OF THE PROPERTY.
S08054049-I1
02/02/2023
Permit issued — General Construction
S08054049-I1-GC
12/21/2022
Permit issued — General Construction
S08054049-I1-GC
12/13/2022
Filed — Alteration
IN-KIND REPLACEMENT OF APPROXIMATELY 48' OF AN EXISTING CONCRETE RETAINING WALL LOCATED TO THE NORTH EAST CORNER OF THE PROPERTY.
S08054049-I1
12/13/2022
Special inspection requirement — Concrete - Cast-In-Place
Steven Savino
12/13/2022
Special inspection requirement — Subgrade Inspections
Steven Savino
12/13/2022
Special inspection requirement — Final
Steven Savino
05/03/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offBIG CITY PAV CONST02/02/2023
DOB NOWGeneral ConstructionSigned-offMONELLO ENTERPRISES INC12/21/2022
BIS—ISSUEDAVID CONSTRUCTION INC08/24/1999
BIS—ISSUEDAVID CONSTRUCTION INC06/29/1998
BISPLISSUEDCHARLES J. DEHART JR P&H01/08/1998
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
12/13/2022Concrete - Cast-In-PlaceSteven Savinospecial
12/13/2022Subgrade InspectionsSteven Savinospecial
12/13/2022FinalSteven Savinoprogress
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/23/2026S08054049-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026S08054049-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026S08054049-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026S08054049-I1Open ↗