← Back
BuildNYC
Two stories - detached, small or mid-size
15 HILLCREST COURT
STATEN ISLAND · BIN 5045113
💬 Discuss this project
1945Year Built
2Stories
A1Building Class
R2Zoning
2,200 sfGross Floor Area
1Units
4 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,924 sf lot · 0.56 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation2p · 1 filing · 3 docs
Sub-Cellar1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Avid Designs209/10/2026
Tom Petersen Architect111/13/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Vis IndustriesPlumbing203/21/2026
N/AGeneral Contractor207/11/2005
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854111/13/2024
Building Lifecycle
09/10/2026
Filed — Alteration
HEREWITH FILING FOR THE REMOVAL OF AN ILLEGALLY INSTALLED ELECTRIC VEHICLE CHARGER TO RESOLVE ECB VIOLATION(S). NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
S01435417-S1
09/09/2026
Filed — Alteration
HEREWITH FILING FOR THE REMOVAL OF AN ILLEGALLY INSTALLED ELECTRIC VEHICLE CHARGER TO RESOLVE ECB VIOLATION(S). NO OTHER WORK PROPOSED UNDER THIS APPLICATION.
S01435417-I1
01/13/2026
Failure to file certificate of correction for unpermitted charger port in front yd. ECB vio ert issued 5/16/25 #39148152N. ECB vio issued for…
ECB violation · open
09/24/2025
Signed off — Alteration
S01142123-I1
09/03/2025
ECB violation issued for failure to file certificate of correction. Atoi observed an electric charging station installed at the front yard of…
ECB violation · open
9 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTom Petersen Architect12/03/2024
BISOTISSUEDN/A08/20/2008
BISOTISSUEDN/A04/27/2007
BISPLISSUEDVis Industries04/23/2007
BISPLISSUEDVis Industries03/01/2006
BISOTISSUEDN/A07/11/2005
BISPLISSUEDVis Industries07/10/2003
BISOTISSUEDN/A04/07/2003
1 project · most recent 09/10/2026
Gas
FiledStatusContractorScope
09/10/2026——Gas
1 project · most recent 11/12/2024
FiledStatusContractorScope
11/12/2024CompleteVenture Home Solar—
Nothing on file for this building.
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account