← Back
Two stories - detached, small or mid-size
15 MANOR ROAD
QUEENS · BIN 4168132
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R1-2Zoning
3,512 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 9,010 sf lot · 0.39 FAR built · Flood zone X
Locations of Work
Mechanical
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Basement1p · 1 filing · 8 docs
1 job · most recent 08/20/2020
General Wiring
FiledStatusContractorScope
08/20/2020CompleteYORK ELEC'L CONTR'S INC.General Wiring
Building Lifecycle
All (10)Filed (1)Permit Issued (5)Signed Off (1)Special Inspection (3)
04/02/2024
Signed off — Alteration
INSTALL TWO (2) SPLIT AIR CONDITIONING SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00393392-I1
03/27/2024
Permit issued — Mechanical Systems
Q00393392-I1-MS
03/31/2023
Permit issued — Mechanical Systems
Q00393392-I1-MS
04/13/2022
Permit issued — Mechanical Systems
Q00393392-I1-MS
03/24/2021
Permit issued — Mechanical Systems
Q00393392-I1-MS
10/14/2020
Permit issued — Mechanical Systems
Q00393392-I1-MS
10/13/2020
Filed — Alteration
INSTALL TWO (2) SPLIT AIR CONDITIONING SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00393392-I1
09/01/2020
Special inspection requirement — Mechanical Systems
Joseph Bazini
09/01/2020
Special inspection requirement — Final
Joseph Bazini
09/01/2020
Special inspection requirement — HVAC and service water heating equipment
Joseph Bazini
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FLUSHING103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/05/2020$1.3M—Private party → Private party$370/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.110/13/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NULITE FUEL OIL CO., LTDGeneral Contractor607/08/2026
YORK ELEC'L CONTR'S INC.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808110/13/2020
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD03/27/2024
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD03/31/2023
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD04/13/2022
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD03/24/2021
DOB NOWMechanical SystemsSigned-offNULITE FUEL OIL CO., LTD10/14/2020
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/01/2020Mechanical SystemsJoseph Bazinispecial
09/01/2020FinalJoseph Baziniprogress
09/01/2020HVAC and service water heating equipment Joseph Bazinienergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00393392-I1Request digital key ↗
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026Q00393392-I1Open ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00393392-I1Open ↗
09/01/2026Q00393392-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q00393392-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00393392-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026Q00393392-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q00393392-I1Open ↗