← Back
Two family frame
15 MEMPHIS AVENUE
STATEN ISLAND · BIN 5177136
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
2,699 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 4,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
ArchitectureCivilGeneral
Floor 23p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Basement2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
M S B DEVELOPMENT2203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC503/01/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ROGERS CALVANICO GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M.S.B. DEVELOPMENT CO INCGeneral Contractor403/21/2026
CAPITAL CONTR P&H CORPPlumbing207/08/2026
D AND H ELECTRICAL CONSTElectrical103/22/2026
QUALITY PLUMBING, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738403/01/2024
Building Lifecycle
All (53)Filed (5)Permit Issued (5)Signed Off (2)Inspection (9)Objection (2)Special Inspection (30)
03/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
anthony santoro
03/05/2024
Special inspection requirement — Subgrade Inspections
anthony santoro
03/05/2024
Special inspection requirement — Structural Steel - Details
anthony santoro
03/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
03/05/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
anthony santoro
03/05/2024
Special inspection requirement — Structural Steel - Welding
anthony santoro
03/05/2024
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
03/05/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
03/05/2024
Special inspection requirement — Final
anthony santoro
03/05/2024
Special inspection requirement — Energy Code Compliance Inspections
anthony santoro
03/05/2024
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
03/05/2024
Special inspection requirement — Structural Wood Frame
anthony santoro
03/05/2024
Special inspection requirement — Footing and Foundation
anthony santoro
03/05/2024
Special inspection requirement — Air barrier - visual inspection
anthony santoro
03/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
03/05/2024
Special inspection requirement — Insulation placement and R values
anthony santoro
03/05/2024
Special inspection requirement — Fireplaces
anthony santoro
03/05/2024
Special inspection requirement — Fenestration air leakage
anthony santoro
03/05/2024
Special inspection requirement — Metering
anthony santoro
03/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
anthony santoro
03/05/2024
Special inspection requirement — Fenestration areas
anthony santoro
03/05/2024
Special inspection requirement — Electric vehicle service equipment requirements
anthony santoro
03/05/2024
Special inspection requirement — Air barrier — testing
anthony santoro
03/05/2024
Special inspection requirement — Permanent certificate
anthony santoro
03/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
03/05/2024
Special inspection requirement — Maintenance information
anthony santoro
03/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
03/05/2024
Special inspection requirement — Ventilation and air distribution system
anthony santoro
03/05/2024
Special inspection requirement — Interior lighting power
anthony santoro
03/05/2024
Special inspection requirement — Mechanical Systems
anthony santoro
03/01/2024
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-P2
03/01/2024
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-S2
02/28/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/16/2024
Permit issued — Curb Cut
S08031945-S2-CC
02/15/2024
Signed off — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-S1
02/13/2024
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-S2
01/31/2024
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-P1
01/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/12/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2024
Permit issued — Plumbing
S60320326-S1-PL
09/14/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/05/2023
Permit issued — Plumbing
S60320326-S1-PL
04/26/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/24/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/19/2023
Permit issued — Plumbing
S08031945-S1-PL
02/08/2023
Permit issued — Earth Work
S08031945-I1-GC-CX
12/27/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-S1
12/22/2022
Objection resolved — Addressed
12/06/2022
Objection raised — Scope
11/04/2022
Filed — New Building
PLUMBING APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION. APPLICATION APPLICABLE TO HOUSE & GARAGE ON LOT.
S08031945-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offM.S.B. DEVELOPMENT CO INC02/16/2024
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP01/03/2024
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP06/05/2023
DOB NOWPlumbingSigned-offQUALITY PLUMBING, INC04/19/2023
DOB NOWEarth WorkPermit IssuedM.S.B. DEVELOPMENT CO INC02/08/2023
1 project · most recent 03/01/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/01/2024Signed-offQUALITY PLUMBING, INCGas, Storm, Water/Sanitary
1 project · most recent 09/22/2023
General Wiring
FiledStatusContractorScope
09/22/2023CompleteD AND H ELECTRICAL CONSTGeneral Wiring
1 project · most recent 03/01/2024
Steel Wood
FiledStatusContractorScope
03/01/2024Signed-offM.S.B. DEVELOPMENT CO INCSteel, Wood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
02/28/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/26/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/24/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
03/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
03/05/2024Subgrade Inspectionsanthony santorospecial
03/05/2024Structural Steel - Detailsanthony santorospecial
03/05/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
03/05/2024Exterior Insulation and Finish Systems (EIFS)anthony santorospecial
03/05/2024Structural Steel - Weldinganthony santorospecial
03/05/2024Concrete - Cast-In-Placeanthony santorospecial
03/05/2024Subsurface Investigations (Borings/Test Pits)anthony santorospecial
03/05/2024Finalanthony santoroprogress
03/05/2024Energy Code Compliance Inspectionsanthony santoroprogress
03/05/2024Fire-Resistance Rated Constructionanthony santoroprogress
03/05/2024Structural Wood Frameanthony santoroprogress
03/05/2024Footing and Foundationanthony santoroprogress
03/05/2024Air barrier - visual inspectionanthony santoroenergy_progress
03/05/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
03/05/2024Insulation placement and R valuesanthony santoroenergy_progress
03/05/2024Fireplacesanthony santoroenergy_progress
03/05/2024Mechanical Systemsanthony santorospecial
03/05/2024Fenestration air leakageanthony santoroenergy_progress
03/05/2024Meteringanthony santoroenergy_progress
03/05/2024Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
03/05/2024Fenestration areasanthony santoroenergy_progress
03/05/2024Electric vehicle service equipment requirementsanthony santoroenergy_progress
03/05/2024Air barrier — testing anthony santoroenergy_progress
03/05/2024Permanent certificateanthony santoroenergy_progress
Latest 25 of 66.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/21/2026S08031945-P1Request digital key ↗
08/21/2026S08031945-P2Request digital key ↗
08/21/2026S08031945-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026S08031945-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature8
09/24/2026S08031945-P1Open ↗
08/31/2026S08031945-S1Open ↗
08/23/2026S08031945-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/23/2026S08031945-I1Open ↗
08/23/2026S08031945-I1Open ↗
08/23/2026S08031945-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026S08031945-P2Open ↗
08/21/2026S08031945-S2Open ↗
08/21/2026S08031945-P1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/21/2026S08031945-P2Open ↗
08/14/2026S08031945-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/14/2026S08031945-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/14/2026S08031945-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/14/2026S08031945-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026S08031945-I1Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026S08031945-I1Open ↗
08/13/2026S08031945-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/21/2026S08031945-P2Open ↗
08/14/2026S08031945-I1Open ↗
▸DOB NOWFinal Survey1
08/14/2026S08031945-I1Open ↗