← Back
BuildNYC
Two family frame
15 RADIGAN AVENUE
STATEN ISLAND · BIN 5176039
💬 Discuss this project
2025Year Built
3Stories
B2Building Class
R3XZoning
2,512 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · Owner of record: Casa Mason Estates · 3,265 sf lot · 0.77 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2Proposed Two - Family Residence4p · 1 filing · 20 docs
Floor 1Proposed Two - Family Residence15p · 1 filing · 20 docs
BasementProposed Two - Family Residence4p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joseph M. Morace, A.I.A., Architect509/23/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Blue Star Holdings603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Blue Star GroupGeneral Contractor209/07/2026
Capital Contracting P&HPlumbing207/08/2026
Blue Star Groupspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738309/23/2026
Building Lifecycle
11/05/2026
Signed off — New Building
PROPOSED PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00864105-I1
10/21/2026
Signed off — New Building
PROPOSED PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00864105-S1
10/15/2026
Objection resolved — Addressed
10/14/2026
Objection raised — Other
09/23/2026
Filed — New Building
PROPOSED PLUMBING, GAS, & STORM FIXTURES AND ASSOCIATED PIPING.
S00864105-P2
50 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offBlue Star Group09/02/2026
DOB NOWPlumbingSigned-offCapital Contracting P&H03/26/2026
DOB NOWMechanical SystemsPermit IssuedBlue Star Group03/05/2026
DOB NOWPlumbingSigned-offCapital Contracting P&H04/25/2025
DOB NOWEarth WorkPermit IssuedBlue Star Group03/21/2025
1 project · most recent 09/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/23/2026Signed-offCapital Contracting P&HGas, Storm, Water/Sanitary
1 project · most recent 08/20/2025
General Wiring
FiledStatusContractorScope
08/20/2025CompleteCatello ElectricalGeneral Wiring
1 project · most recent 09/23/2026
Concrete Wood
FiledStatusContractorScope
09/23/2026Signed-offBlue Star GroupConcrete, Wood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/01/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 84
DateRequirementInspectorRole
09/23/2026Fenestration areasanthony santoroenergy_progress
09/23/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/23/2026Air barrier — testing anthony santoroenergy_progress
09/23/2026Permanent certificateanthony santoroenergy_progress
09/23/2026Maintenance informationanthony santoroenergy_progress
09/23/2026Fenestration and door U-factor and product ratingsanthony santoroenergy_progress
09/23/2026Meteringanthony santoroenergy_progress
09/23/2026Air barrier - visual inspectionanthony santoroenergy_progress
09/23/2026Duct leakage testing, insulation and designanthony santoroenergy_progress
09/23/2026Fenestration air leakageanthony santoroenergy_progress
09/23/2026Insulation placement and R valuesanthony santoroenergy_progress
09/23/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
09/23/2026Protection of exposed foundation insulationanthony santoroenergy_progress
09/23/2026Electric vehicle service equipment requirementsanthony santoroenergy_progress
09/23/2026Interior lighting poweranthony santoroenergy_progress
09/23/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
09/23/2026Ventilation and air distribution systemanthony santoroenergy_progress
09/23/2026Structural Wood Frameanthony santoroprogress
09/23/2026Footing and Foundationanthony santoroprogress
09/23/2026Fire-Resistance Rated Constructionanthony santoroprogress
09/23/2026Finalanthony santoroprogress
09/23/2026Energy Code Compliance Inspectionsanthony santoroprogress
09/23/2026Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/23/2026Subgrade Inspectionsanthony santorospecial
09/23/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationanthony santorospecial
Latest 25 of 84.