← Back
Nursing home
15 SOUTH GANNON AVENUE
💬 Discuss this project
1972Year Built
8Stories
I6Building Class
R3-2Zoning
102,640 sfGross Floor Area
1Units
17 Open Violations ▸FDNY Report ↗
Nursing home · Owner of record: ALLIED CLOVE LAKES CO · 61,680 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalGeneral
Permit Issued — active, not yet Signed-off
Roof6p · 4 filings · 20 docs
CellarUnder Construction1p · 1 filing · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SBA507/08/2026
T-MOBILE407/08/2026
ALLIED CLOVE LAKES CO103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONSTRUCTION PERMIT SERVICES603/21/2026
4444 PPPP CORP603/21/2026
CCM CONSULTING GROUP, INC.503/21/2026
LAURIA ASSOCIATES103/21/2026
NEW YORK ENGINEERING ASSOCIATES P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RAMAPO COMMUNICATION CORPGeneral Contractor603/21/2026
ICON INTERIOR DESIGN INCGeneral Contractor407/31/2026
AMOK INCPlumbing207/08/2026
SQUAN CONSTRUCTION SERVICGeneral Contractor203/21/2026
ADVANCED CELLULAR SOLUTIOGeneral Contractor204/09/2026
WATCH HILL WIRELESS SOLUGeneral Contractor107/08/2026
OVERLAND CONTRACTING INCGeneral Contractor107/08/2026
CRYSTAL COMFORT INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416312/23/2024
GRANT ENGINEERING CONSULT3512204/02/2024
R MARSAC CONSULTING LLC329310/16/2023
ROBERT F. GERMAIN JR. PE5100103/08/2023
NEW YORK ENGINEERING ASSO851104/21/2021
SCHERER DESIGN GROUP, LLC6303108/20/2019
Building Lifecycle
All (178)Filed (16)Permit Issued (13)Signed Off (7)Violation (60)Inspection (4)Objection (48)Special Inspection (30)
07/30/2026
Permit issued — General Construction
S01098262-I1-GC
03/09/2026
Permit issued — Plumbing
S01098262-S1-PL
02/02/2026
Signed off — Alteration
Installation of conduit with related trenching on grade. Installation of conduit on building exterior. No change to occupancy, use, or egress.
S01027865-I1
01/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/30/2026
Special inspection requirement — Final
NICHOLAS BARILE
01/09/2026
Filed — Alteration
Installation of conduit with related trenching on grade. Installation of conduit on building exterior. No change to occupancy, use, or egress.
S01027865-P2
12/30/2025
Special inspection requirement — Final
NICHOLAS BARILE
10/01/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/22/2025
Objection resolved — Addressed
07/18/2025
Objection raised — Other
07/09/2025
Filed — Alteration
Installation of conduit with related trenching on grade. Installation of conduit on building exterior. No change to occupancy, use, or egress.
S01027865-P1
07/02/2025
Special inspection requirement — Final
NICHOLAS BARILE
05/06/2025
Permit issued — General Construction
S01027865-I1-GC
03/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/18/2025
Permit issued — Plumbing
S01098262-S1-PL
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
01/16/2025
Objection resolved — Addressed
12/31/2024
Objection raised — Inspections
12/31/2024
Objection raised — Zoning
12/31/2024
Objection raised — Scope
12/31/2024
Objection raised — Scope
12/31/2024
Objection raised — Inspections
12/30/2024
Signed off — Alteration
Installation of DISH telecom. Install 3 antenna sectors with 6 RRH units and 1 GPS unit on roof. Install 1 equipment cabinet on steel platform on roof. Related service connection basement. All in conformance with TPPN#5/98.
S08029797-I1
12/23/2024
Filed — Alteration
Mechanical work associated with interior renovation alteration job #S01098262-I1
S01098262-S1
12/23/2024
Filed — Alteration
Mechanical work associated with interior renovation alteration job #S01098262-I1
S01098262-S2
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
12/17/2024
Special inspection requirement — Duct leakage testing, insulation and design
ELIAS RASABI
12/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
ELIAS RASABI
12/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ELIAS RASABI
12/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
ELIAS RASABI
12/17/2024
Special inspection requirement — Ventilation and air distribution system
ELIAS RASABI
12/17/2024
Special inspection requirement — Mechanical Systems
ELIAS RASABI
12/17/2024
Special inspection requirement — Final
ELIAS RASABI
12/04/2024
Permit issued — General Construction
S01098262-I1-GC
10/15/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/14/2024
Objection resolved — Addressed
10/07/2024
Objection raised — Other
09/26/2024
Objection resolved — Addressed
09/25/2024
Objection resolved — Addressed
09/24/2024
Objection raised — Other
09/24/2024
Objection raised — Other
09/24/2024
Objection raised — Other
09/20/2024
Objection raised — Other
09/20/2024
Objection raised — Scope
09/11/2024
Filed — Alteration
Mechanical work associated with interior renovation alteration job #S01098262-I1
S01098262-I1
08/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ELIAS RASABI
08/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
ELIAS RASABI
08/28/2024
Special inspection requirement — Interior lighting power
ELIAS RASABI
08/28/2024
Special inspection requirement — Lighting controls
ELIAS RASABI
08/28/2024
Special inspection requirement — Final
ELIAS RASABI
08/28/2024
Special inspection requirement — Energy Code Compliance Inspections
ELIAS RASABI
08/02/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/08/2024
Violation issued (FDNY_NOV, closed)
06/20/2024
Permit issued — General Construction
S01027865-I1-GC
Latest 60 of 178 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedICON INTERIOR DESIGN INC07/30/2026
DOB NOWPlumbingPermit IssuedAMOK INC03/09/2026
DOB NOWGeneral ConstructionSigned-offADVANCED CELLULAR SOLUTIO05/06/2025
DOB NOWPlumbingPermit IssuedAMOK INC02/18/2025
DOB NOWGeneral ConstructionPermit IssuedICON INTERIOR DESIGN INC12/04/2024
DOB NOWGeneral ConstructionSigned-offADVANCED CELLULAR SOLUTIO06/20/2024
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP03/13/2024
DOB NOWAntennaSigned-offRAMAPO COMMUNICATION CORP12/06/2023
DOB NOWMechanical SystemsSigned-offCRYSTAL COMFORT03/10/2023
DOB NOWAntennaSigned-offWATCH HILL WIRELESS SOLU12/12/2022
DOB NOWBoiler EquipmentSigned-offJACK PICCINI, INC04/27/2021
DOB NOWAntennaSigned-offOVERLAND CONTRACTING INC12/18/2019
DOB NOWAntennaSigned-offSQUAN CONSTRUCTION SERVIC10/10/2018
BISOTISSUEDADVANCED CELLULAR SOLUTIO11/20/2017
BISFPISSUEDLUND FIRE PRODUCTS CO INC10/02/2017
BISPLISSUEDJPI PLUMBING & HEATING IN08/01/2017
BISOTISSUEDSBA NETWORK SERVICES LLC06/26/2017
BISOTISSUEDCEL TECH ELECTRIC INC01/17/2017
BISOTISSUEDCEL TECH ELECTRIC INC12/07/2016
BISPLISSUEDJPI PLUMBING & HEATING IN10/21/2016
BISMHISSUEDG-NET CONSTRUCTION CORP05/10/2016
BISOTISSUEDG-NET CONSTRUCTION CORP05/10/2016
BISSPISSUEDDANIELLE LOUISE, INC01/25/2016
BISOTISSUEDCEL TECH ELECTRIC INC12/10/2015
BISOTISSUEDSBA NETWORK SERVICES LLC12/04/2015
BISSPISSUEDFIREQUEST CORP10/23/2015
BISOTISSUEDSBA NETWORK SERVICES LLC09/14/2015
BISOTISSUEDABILENE INC08/21/2015
BISPLISSUEDJPI PLUMBING & HEATING IN08/03/2015
BISMHISSUEDG-NET CONSTRUCTION CORP07/22/2015
BISOTISSUEDTELCOM ENGINEERING GP INC07/22/2015
BISOTISSUEDG-NET CONSTRUCTION CORP07/21/2015
BISMHISSUEDSAM'S AIRCONDITIONING INC04/29/2015
BISPLISSUEDBELL FUEL OIL, LLC03/30/2015
BISOTISSUEDABILENE INC03/30/2015
BISOTISSUEDCANIDO BASONAS CONSTRUCTI02/06/2015
BISOTISSUEDTELCOM ENGINEERING GP INC08/12/2014
BISMHISSUEDG-NET CONSTRUCTION CORP07/07/2014
BISSPISSUEDCAPITOL FIRE SPKL CO,INC09/09/2013
BISSPISSUEDCAPITOL FIRE SPKL CO,INC08/14/2012
+ 16 more permits on file
3 projects · most recent 12/23/2024
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
12/23/2024Permit IssuedICON INTERIOR DESIGN INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 4MXL36VJ 36,600 BTU · Heat Pump Outdoor ×8
5MXL48VJ 48,500 BTU · Heat Pump Outdoor ×8
3MXL36MVJU 36,000 BTU · Heat Pump Outdoor ×4
3MXL36QMVJU 36,600 BTU · Heat Pump Outdoor ×4
5MXL36VJ 36,600 BTU · Heat Pump Outdoor ×4
02/14/2020——Air Conditioning Systems
08/20/2019——Air Conditioning Systems
Cooling
Carrier 24AHA460A500 5 tons · Condensing Unit ×2
FB4CNP060 5 tons · Ahu ×2
1 project · most recent 12/23/2024
Water/Sanitary
FiledStatusContractorScope
12/23/2024Permit IssuedAMOK INCWater/Sanitary
3 projects · most recent 12/26/2024
General Wiring
FiledStatusContractorScope
12/26/2024Permit IssuedBOLTIN ELECTRIC LLCGeneral Wiring
06/07/2024CompleteE.C. ELECL CONTRACTOR INCGeneral Wiring
06/02/2023CompleteY.S ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
01/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/01/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/07/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
03/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 30
DateRequirementInspectorRole
01/30/2026FinalNICHOLAS BARILEprogress
12/30/2025FinalNICHOLAS BARILEprogress
07/02/2025FinalNICHOLAS BARILEprogress
12/17/2024Energy Code Compliance InspectionsELIAS RASABIprogress
12/17/2024Duct leakage testing, insulation and designELIAS RASABIenergy_progress
12/17/2024HVAC-R and service water heating system controlsELIAS RASABIenergy_progress
12/17/2024HVAC-R and service water piping design and insulationELIAS RASABIenergy_progress
12/17/2024HVAC-R and service water heating equipmentELIAS RASABIenergy_progress
12/17/2024Ventilation and air distribution systemELIAS RASABIenergy_progress
12/17/2024Mechanical SystemsELIAS RASABIspecial
12/17/2024FinalELIAS RASABIprogress
08/28/2024Fire-Resistant Penetrations and JointsELIAS RASABIspecial
08/28/2024Fire-Resistance Rated ConstructionELIAS RASABIprogress
08/28/2024Interior lighting powerELIAS RASABIenergy_progress
08/28/2024Lighting controlsELIAS RASABIenergy_progress
08/28/2024FinalELIAS RASABIprogress
08/28/2024Energy Code Compliance InspectionsELIAS RASABIprogress
02/16/2023FinalRobert Germain Jr.progress
02/16/2023Mechanical SystemsRobert Germain Jr.special
03/17/2021Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
07/02/2019Permanent certificateCOLLEEN CONNOLLYenergy_progress
07/02/2019HVAC and service water heating system controls COLLEEN CONNOLLYenergy_progress
07/02/2019HVAC insulation and sealing COLLEEN CONNOLLYenergy_progress
07/02/2019Mechanical SystemsCOLLEEN CONNOLLYspecial
07/02/2019Shutoff dampersCOLLEEN CONNOLLYenergy_progress
Latest 25 of 30.
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch12
08/26/2026S00015513-I1Request digital key ↗
08/23/2026S08026228-P1Request digital key ↗
08/23/2026S00830703-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026S00187953-I1Request digital key ↗
08/15/2026S00296831-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/15/2026S00221068-I1Request digital key ↗
▸Applications & Permits70
▸BISWORK PERMIT APPLICATION38
12/05/2017520274168Open ↗
10/03/2017520278324Open ↗
08/10/2017520303706Open ↗
Showing 3 of 38 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION29
08/22/2017520278324Open ↗
07/06/2017520303706Open ↗
09/29/2016520274168Open ↗
Showing 3 of 29 on file for this type
▸BISPLACE OF ASSEMBLY1
11/30/2016520283425Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications93
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION44
04/02/2019520274168Open ↗
10/02/2017520283425Open ↗
10/02/2017520283425Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWProgress Inspector Seal & Signature17
09/01/2026S00830703-I1Open ↗
09/01/2026S00187953-I1Open ↗
09/01/2026S00187953-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/26/2026S00015513-I1Open ↗
08/26/2026S00032445-I1Open ↗
08/23/2026S08026228-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/23/2026S00488062-I1Open ↗
09/01/2026S00830703-I1Open ↗
09/01/2026S00187953-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
01/30/2015520219772Open ↗
Showing 1 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
03/26/2015540074355Open ↗
01/30/2015520219772Open ↗
Showing 2 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
03/26/2015540074355Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/26/2015540074355Open ↗
▸Trade Schedules & Equipment51
▸BISEQUIPMENT USE PERMITS14
05/15/2015520241177Open ↗
Showing 1 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT10
12/01/2016520208025Open ↗
05/18/2015520241177Open ↗
04/20/2015520241177Open ↗
Showing 3 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA8
08/01/2017520274168Open ↗
12/14/2016520200906Open ↗
11/16/2015520235451Open ↗
Showing 3 of 8 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
11/27/2015540074355Open ↗
11/16/2015520208025Open ↗
08/26/2015540074355Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
03/26/2015540074355Open ↗
Showing 1 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-853
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
07/06/2017520303706Open ↗
09/22/2014520208025Open ↗
09/22/2014520208016Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
07/11/2014520193488Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026S00221068-I1Open ↗
▸Environmental & Asbestos37
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
08/22/2017520278324Open ↗
07/25/2017520303706Open ↗
07/06/2017520303706Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/26/2026S00015513-I1Open ↗
08/23/2026S08026228-P1Open ↗
08/21/2026S01027865-I1Open ↗
Showing 3 of 14 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance28
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
09/07/2017520200906Open ↗
07/25/2017520303706Open ↗
10/12/2016520238653Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
04/02/2019520274168Open ↗
09/07/2017520200906Open ↗
10/12/2016520238653Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/26/2015540074355Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
03/26/2015540074355Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports3
▸BISHYDRAULIC FLOW CALCULATIONS1
01/05/2015520208016Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
03/26/2015540074355Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs49
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
04/02/2019520274168Open ↗
11/17/2017520200906Open ↗
09/22/2017520303706Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
07/06/2017520303706Open ↗
11/30/2016520283425Open ↗
09/29/2016520274168Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
10/02/2017520283425Open ↗
12/15/2015520200906Open ↗
07/11/2014520200906Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
12/05/2017520274168Open ↗
▸Cost, Insurance & Ownership36
▸BISCOST AFFIDAVIT36
04/02/2019520274168Open ↗
09/22/2017520303706Open ↗
08/22/2017520278324Open ↗
Showing 3 of 36 on file for this type
▸Filing & Intake Forms30
▸BISEFILING COVER SHEET19
08/22/2017520278324Open ↗
07/06/2017520303706Open ↗
09/29/2016520274168Open ↗
Showing 3 of 19 on file for this type
▸BISADDITIONAL INFORMATION6
06/22/2017520283425Open ↗
12/01/2016520208025Open ↗
07/22/2015540074355Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM4
04/02/2019520274168Open ↗
11/17/2017520200906Open ↗
09/22/2017520303706Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
03/26/2015540074355Open ↗
▸Other Documents6
▸DOB NOWWaiver Document3
08/21/2026S01027865-I1Open ↗
08/21/2026S01027865-P1Open ↗
08/13/2026S01027865-P2Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDRY PIPE VALVE TEST : FP-101
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type