← Back
BuildNYC
Office with commercial, 7-19 stories
15 WEST 18TH STREET
MANHATTAN · BIN 1015447
💬 Discuss this project
1904Year Built
10Stories
O6Building Class
C6-4AZoning
42,625 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized2 Active Violations 1 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: First Flatiron · 4,600 sf lot · 9.27 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofMechanical work on floors 3 through 69p · 2 filings · 15 docs
Floor 10Mechanical work on floors 3 through 615p · 1 filing · 13 docs
Floor 9Mechanical work on floors 3 through 614p · 1 filing · 13 docs
Floor 8
Floor 7
Floor 6Mechanical work on floors 3 through 615p · 1 filing · 13 docs
Floor 5Mechanical work on floors 3 through 614p · 1 filing · 13 docs
Floor 4Mechanical work on floors 3 through 614p · 1 filing · 13 docs
Floor 3Alfa Development Management LLC23p · 2 filings · 20 docs
Floor 2Accessibility and code compliance1 filing · 7 docs
Floor 1
CellarCellar boiler replacement1 filing · 5 docs
Site & exteriorPipe scaffold site plane15p · 3 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
First Flatiron8603/22/2026
Alfa Development203/21/2026
15 West 18th Street Associates203/21/2026
Ally Construction103/22/2026
Flatiron103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anthony J. Diguiseppe Architect709/21/2026
SJC Engineering307/24/2024
Ashraf310/19/2022
Design42 Architecture105/28/2021
Asif Jamil, RA203/24/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Green Studio603/21/2026
Clarke Construction Consultants303/21/2026
Municipal Building Consultants103/21/2026
Rigid Structural Design203/21/2026
Bridge Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platinum Services NYScaffold1203/21/2026
Rock Group NYScaffold807/08/2026
Intersystem InstallationScaffold603/21/2026
MC2 Mechanicalspecialty_contractor507/08/2026
Any Temp Any TimeGeneral Contractor303/21/2026
JLC Electrical ContractingElectrical103/21/2026
Morell BuildersGeneral Contractor104/09/2026
Airo Electrical ContractorsElectrical103/21/2026
Kevin Keaveny Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Winton Group Architecture4343509/21/2026
Socotec Engineering4983107/24/2024
Delta Testing Labs687208/09/2022
S&S Concrete & Soil Testi1008105/28/2021
Building Lifecycle
All (137)Filed (16)Permit Issued (15)Signed Off (3)Facade (FISP) (15)Violation (60)Objection (4)Special Inspection (24)
09/23/2026
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-S2
09/21/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-P4
05/14/2026
Special inspection requirement — Final
ANTHONY DIGUISEPPE
05/14/2026
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
05/08/2026
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-I1
04/29/2026
Violation issued (HPD, open)
A
03/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
03/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY DIGUISEPPE
03/24/2026
Special inspection requirement — Final
ANTHONY DIGUISEPPE
03/24/2026
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY DIGUISEPPE
03/23/2026
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
03/23/2026
Special inspection requirement — Final
ANTHONY DIGUISEPPE
03/19/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-P3
03/19/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-P1
03/19/2026
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-P2
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Vladimir Kaushansky
03/16/2026
Special inspection requirement — Final
ANTHONY DIGUISEPPE
03/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ANTHONY DIGUISEPPE
03/16/2026
Special inspection requirement — Mechanical Systems
Vladimir Kaushansky
03/16/2026
Special inspection requirement — Final
ANTHONY DIGUISEPPE
03/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ANTHONY DIGUISEPPE
03/12/2026
Permit issued — Mechanical Systems
M01329575-S2-MS
01/23/2026
Permit issued — General Construction
M01329575-I1-GC
12/29/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-S2
12/29/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-I1
12/29/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH DOB NOW GC AND PL. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M01329575-S1
11/17/2025
Violation issued (HPD, open)
I
07/24/2024
Filed — Alteration
M01080280-I1
07/12/2024
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
07/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/30/2024
Violation issued (ECB, closed)
Construction
04/01/2024
Violation issued (HPD, closed)
A
11/15/2023
Violation issued (HPD, closed)
I
10/03/2023
Permit issued — Mechanical Systems
M00473335-I1-MS
07/17/2023
Permit issued — Mechanical Systems
M00473335-I1-MS
05/08/2023
Cycle 9 facade report signed — SAFE
02/15/2023
Cycle 9 facade report submitted
02/07/2023
Cycle 9 facade inspection completed
01/17/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00292389-I1
12/19/2022
Cycle 8 facade report signed — SAFE
12/02/2022
Cycle 8 facade inspection completed
11/02/2022
Violation issued (HPD, closed)
I
10/20/2022
Permit issued — Supported Scaffold
M08024138-I1-SF
10/19/2022
Filed — Alteration
M08024138-I1
09/22/2022
Permit issued — Sidewalk Shed
M00292389-I1-SH
08/10/2022
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
08/10/2022
Special inspection requirement — Final
Stephen Carnavalla
08/09/2022
Filed — Alteration
MECHANICAL WORK ON THE 3RD, 4TH, 5TH, & 6TH FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M00473335-P1
08/04/2022
Special inspection requirement — Final
Stephen Carnavalla
08/04/2022
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
02/16/2022
Violation issued (HPD, closed)
A
02/16/2022
Violation issued (HPD, closed)
I
11/03/2021
Violation issued (ECB, closed)
Construction
11/03/2021
Violation issued (ECB, closed)
Construction
11/03/2021
Violation issued (ECB, closed)
Construction
10/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/25/2021
Violation issued (ECB, closed)
Boilers
10/08/2021
Violation issued (ECB, closed)
Local Law
10/01/2021
Permit issued — Sidewalk Shed
M00292389-I1-SF
09/30/2021
Permit issued — Sidewalk Shed
M00292389-I1-SH
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMC2 Mechanical03/12/2026
DOB NOWGeneral ConstructionSigned-offMorell Builders01/23/2026
DOB NOWMechanical SystemsPermit IssuedMC2 Mechanical10/03/2023
DOB NOWMechanical SystemsPermit IssuedMC2 Mechanical07/17/2023
DOB NOWSupported ScaffoldPermit IssuedPlatinum Services NY10/20/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/22/2022
DOB NOWSidewalk ShedSigned-offPlatinum Services NY10/01/2021
DOB NOWSidewalk ShedSigned-offPlatinum Services NY09/30/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedIntersystem Installation08/24/2021
DOB NOWSupported ScaffoldPermit IssuedIntersystem Installation08/23/2021
DOB NOWMechanical SystemsPermit IssuedAny Temp Any Time04/22/2021
DOB NOWSidewalk ShedSigned-offRock Group NY09/30/2020
DOB NOWSupported ScaffoldSigned-offRock Group NY09/23/2020
DOB NOWSupported ScaffoldSigned-offRock Group NY01/15/2020
DOB NOWSidewalk ShedSigned-offRock Group NY01/15/2020
BIS—ISSUEDSBG Development08/29/2025
BIS—ISSUEDSBG Development04/01/2025
BISOTISSUEDIgh Restoration04/27/2022
BISOTISSUEDStarr Restoration03/15/2022
BISOTISSUEDStarr Restoration07/27/2021
BISOTISSUEDStarr Restoration07/07/2020
BISPLISSUEDL&J PLG & Heating Co of NY04/11/2019
BISMHISSUEDCooling Guard Mechanic Co11/30/2018
BISMHISSUEDLifetime General Contracting11/19/2018
BIS—ISSUEDDavid and Goliath Construction10/01/2018
BISPLISSUEDOrbit Plumbing & Heating09/27/2018
BISMHISSUEDSherri Builders09/26/2018
BISOTISSUEDSherri Builders09/13/2018
BISOTISSUEDSherri Builders09/10/2018
BISSPISSUEDHeads Up Fire Sprinkler08/29/2018
BIS—ISSUEDSynergy Construction Group07/31/2018
BISPLISSUEDJunior Carter Mechanical06/19/2018
BISOTISSUEDCity Dimensions Construction06/11/2018
BISMHISSUEDCity Dimensions Construction06/11/2018
BISOTISSUEDSherri Builders06/07/2018
BISOTISSUEDLifetime General Contracting02/27/2018
BISOTISSUEDLifetime General Contracting02/27/2018
BISMHISSUEDCooling Guard Mechanic Co01/18/2018
BISEQISSUEDJerrick Associates07/27/2017
BISEQISSUEDJerrick Associates07/17/2017
+ 25 more permits on file
2 projects · most recent 09/21/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/21/2026Signed-offMC2 MechanicalAir Conditioning Systems
Cooling
Daikin na 48,000 BTU · Heat Pump Outdoor ×10
08/09/2022Permit IssuedMC2 MechanicalAir Conditioning Systems, Heating Systems
Cooling
Daikin RXTQ48TAVJU 45,500 BTU · Vrf Outdoor ×4
RXYQ144XATJA 138,000 BTU · Vrf Outdoor ×4
RXTQ36TAVJU 34,200 BTU · Vrf Outdoor ×2
Mitsubishi Electric MXZ-4C36NA2 35,400 BTU · Heat Pump Outdoor ×6
PUMY-P60NKMU2 60,000 BTU · Vrf Outdoor ×2
Heating
Daikin RXTQ48TAVJU 49,500 BTU · Vrf Outdoor ×4
RXYQ144XATJA 154,000 BTU · Vrf Outdoor ×4
RXTQ36TAVJU 37,000 BTU · Vrf Outdoor ×2
Mitsubishi Electric MXZ-4C36NA2 36,000 BTU · Condensing Unit ×6
PUMY-P60NKMU2 66,000 BTU · Vrf Outdoor ×2
1 project · most recent 09/21/2026
Water/Sanitary
FiledStatusContractorScope
09/21/2026——Water/Sanitary
7 projects · most recent 05/01/2026
General Wiring
FiledStatusContractorScope
05/01/2026CompleteJoseph Weinstein ElectricGeneral Wiring
07/18/2024Permit IssuedInter Connection EletricGeneral Wiring
04/17/2023CancelledEvs ElectricGeneral Wiring
01/07/2020CompleteIlluminous Electric—
07/25/2019Permit IssuedAccurate ElectricalGeneral Wiring
02/22/2019Permit IssuedForest Brook Electrical ContractingGeneral Wiring
03/21/2018CompleteTriza ElectricalGeneral Wiring
1 project · most recent 08/21/2021
Scaffold
FiledStatusContractorScope
08/21/2021Permit IssuedIntersystem InstallationScaffold
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
05/14/2026FinalANTHONY DIGUISEPPEprogress
05/14/2026Mechanical SystemsVladimir Kaushanskyspecial
03/24/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
03/24/2026Fire-Resistance Rated ConstructionANTHONY DIGUISEPPEprogress
03/24/2026FinalANTHONY DIGUISEPPEprogress
03/24/2026Energy Code Compliance InspectionsANTHONY DIGUISEPPEprogress
03/23/2026Mechanical SystemsVladimir Kaushanskyspecial
03/23/2026FinalANTHONY DIGUISEPPEprogress
03/16/2026Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
03/16/2026FinalANTHONY DIGUISEPPEprogress
03/16/2026Energy Code Compliance InspectionsANTHONY DIGUISEPPEprogress
03/16/2026Mechanical SystemsVladimir Kaushanskyspecial
03/16/2026FinalANTHONY DIGUISEPPEprogress
03/16/2026Fire-Resistance Rated ConstructionANTHONY DIGUISEPPEprogress
07/12/2024Heating SystemsALEXIS SCHLESSINGERMANspecial
07/12/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
08/10/2022Mechanical SystemsRICHARD GREENWALDspecial
08/10/2022FinalStephen Carnavallaprogress
08/04/2022FinalStephen Carnavallaprogress
08/04/2022Mechanical SystemsRICHARD GREENWALDspecial
04/16/2021Lighting controlsGLEN LANGERenergy_progress
04/16/2021FinalGLEN LANGERprogress
04/16/2021Fire-Resistant Penetrations and JointsGLEN LANGERspecial
04/16/2021Interior lighting powerGLEN LANGERenergy_progress
▾Documents — 638 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch12
09/03/2026M00580825-I1Request digital key ↗
09/03/2026M00581417-I1Request digital key ↗
09/01/2026M08024138-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00292389-I1Request digital key ↗
09/05/2026M00292389-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/02/2026M00473335-I1Request digital key ↗
09/02/2026M00473335-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00292389-P1Request digital key ↗
09/05/2026M00292389-I1Request digital key ↗
▸Applications & Permits137
▸BISPLAN / WORK APPROVAL APPLICATION78
04/01/2025104374507Open ↗
06/26/2024104374507Open ↗
06/20/2024104374507Open ↗
Showing 3 of 78 on file for this type
▸BISWORK PERMIT APPLICATION47
04/02/2025104374507Open ↗
04/27/2022123478343Open ↗
04/11/2022123478343Open ↗
Showing 3 of 47 on file for this type
▸DOB NOWLPC Approval/Permit8
09/02/2026M00473335-I1Open ↗
08/20/2026M01329575-P1Open ↗
08/20/2026M01329575-P4Open ↗
Showing 3 of 8 on file for this type
▸BISPLACE OF ASSEMBLY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION56
09/17/2019140817392Open ↗
09/17/2019140817392Open ↗
09/17/2019140817392Open ↗
Showing 3 of 56 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT23
11/13/2018140817392Open ↗
11/02/2018123370048Open ↗
11/02/2018123370048Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST22
07/26/2019123370048Open ↗
07/15/2019123370048Open ↗
11/07/2018123370048Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
09/05/2026M00292389-I1Open ↗
09/05/2026M00292389-P1Open ↗
09/03/2026M00504975-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/30/2026M01329575-P3Open ↗
08/27/2026M01329575-P4Open ↗
08/27/2026M00504975-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/30/2026M01329575-P3Open ↗
08/27/2026M01329575-P4Open ↗
08/27/2026M00504975-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/13/2018140817392Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/13/2018140817392Open ↗
Showing 1 of 3 on file for this type
▸Trade Schedules & Equipment44
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
09/25/2018123518354Open ↗
Showing 1 of 10 on file for this type
▸BISEQUIPMENT USE PERMITS5
09/17/2019123370048Open ↗
Showing 1 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
09/17/2019123370048Open ↗
06/21/2019123370048Open ↗
Showing 2 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes8
11/02/2018123370048Open ↗
09/14/2018123478343Open ↗
08/23/2018123461315Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWTenant Protection Plan2
09/05/2026M00292389-P1Open ↗
09/05/2026M00292389-I1Open ↗
▸BISST-1 Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos32
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
11/13/2018140817392Open ↗
11/07/2018123370048Open ↗
09/26/2018123518354Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
09/02/2026M00473335-I1Open ↗
08/20/2026M01329575-S2Open ↗
08/20/2026M01329575-P4Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS INSPECTION REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
09/17/2019140817392Open ↗
09/17/2019140817392Open ↗
08/28/2019123478343Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
09/17/2019140817392Open ↗
06/06/2019123112014Open ↗
11/26/2018123112014Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISNYCECC ANALYSIS1
11/13/2018140817392Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
11/13/2018140817392Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/01/2022123478343Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/01/2022123478343Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs82
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST27
08/04/2022123478343Open ↗
02/21/2020103520496Open ↗
10/10/2019103520496Open ↗
Showing 3 of 27 on file for this type
▸BISLANDMARKS APPROVAL26
09/17/2019140817392Open ↗
08/28/2019123478343Open ↗
08/28/2019123370048Open ↗
Showing 3 of 26 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
06/11/2024104374507Open ↗
06/10/2024104374507Open ↗
08/04/2022104374507Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
04/27/2022123478343Open ↗
06/05/2019123112014Open ↗
11/28/2018104374507Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
04/02/2025104374507Open ↗
04/11/2022123478343Open ↗
04/12/2019104374507Open ↗
▸BISLANDMARKS SIGNOFF3
08/04/2022123478343Open ↗
Showing 1 of 3 on file for this type
▸BISHPD: INCLUSIONARY HOUSING LETTER1
08/28/2019123370048Open ↗
▸BISFINAL1
08/01/2022123478343Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT37
09/17/2019140817392Open ↗
08/28/2019123478343Open ↗
08/28/2019123370048Open ↗
Showing 3 of 37 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/01/2022123478343Open ↗
▸Filing & Intake Forms82
▸BISBOROUGH INTAKE FORM37
03/24/2025104374507Open ↗
02/21/2020103520496Open ↗
02/14/2020103520496Open ↗
Showing 3 of 37 on file for this type
▸BISEFILING COVER SHEET29
04/01/2019123706686Open ↗
04/01/2019123706686Open ↗
11/07/2018123370048Open ↗
Showing 3 of 29 on file for this type
▸BISADDITIONAL INFORMATION13
06/26/2024104374507Open ↗
08/30/2022104374507Open ↗
06/16/2020123478343Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/13/2018140817392Open ↗
Showing 1 of 3 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
09/16/2019123478343Open ↗
Showing 1 of 4 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE SUPP ANSUL APPROVL: FD-FSS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026M01080280-I1Open ↗