← Back
BuildNYC
Office with commercial, 7-19 stories
Bernstein Real Estate
15 WEST 26TH STREET · BIN 1015643
💬 Discuss this project
1911Year Built
12Stories
O6Building Class
M1-8A/R11Zoning
45,309 sfGross Floor Area
17Units
LL97 CoveredRent Stabilized0 Active Violations 1 likely answered 1 old, status unconfirmed ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Mesa Realty Associates · 4,400 sf lot · 10.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsPipe scaffold installation1 filing
RoofBernstein Real Estate2p · 3 filings · 20 docs
Floor 12Bernstein Real Estate1 filing · 20 docs
Floor 11Bernstein Real Estate1 filing · 20 docs
Floor 10Bernstein Real Estate6p · 4 filings · 20 docs
Floor 9
Floor 8
Floor 7Bernstein Real Estate1p · 1 filing · 8 docs
Floor 6
Floor 5Cedar Street Creative1 filing · 6 docs
Floor 4
Floor 3Velem7p · 1 filing · 20 docs
Floor 2Velem7p · 1 filing · 20 docs
Floor 1Motorino4p · 7 filings · 20 docs
Site & exteriorBernstein Real Estate2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Mesa Realty4403/22/2026
Bernstein Real Estate4207/08/2026
Mazda Realty Associates403/21/2026
Precision World Wide Contracting103/22/2026
Messa Reality Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Miriam Ortiz - Filing Rep1003/21/2026
AE Design Solution603/21/2026
Boyd Consulting203/21/2026
EA Design Group603/21/2026
William Vitacco Associates203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire NY InstallationsScaffold407/08/2026
Precision WorldwideGeneral Contractor303/21/2026
Adrias PlumbingPlumbing310/04/2026
Practical Plumbing & HeatingPlumbing207/08/2026
Moreair Mechanical Servicesspecialty_contractor207/08/2026
Practical Plumbing & HeatingFire Protection207/08/2026
Adrias PlumbingGeneral Contractor103/21/2026
Cooper WorksGeneral Contractor107/08/2026
D.B.J. ContractingGeneral Contractor104/09/2026
Demari ServicesGeneral Contractor107/08/2026
LC ConGeneral Contractor107/08/2026
Stability Electric EnterprisesElectrical103/21/2026
Petrakis GeorgiosGeneral Contractor103/21/2026
R. GunzerElectrical103/21/2026
New Phase Electrical ContractorsElectrical103/22/2026
Aqua Plumbing & HeatingPlumbing107/08/2026
Grushinsky Pipng & HeatingFire Protection107/08/2026
Metflow Fire ControlFire Protection107/08/2026
PFL MechanicalPlumbing107/08/2026
Stabile ChristopherElectrical103/21/2026
Switch Electric of the FiveElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
McDonough Engineering Pra9377412/29/2025
Mottola Rini Engineers, P3251205/28/2025
Richard H. Balser Engineering3028403/07/2024
Vincent J. Liotta P. E1974212/29/2023
Melone Architects2944112/15/2023
Thomas Veltre, P.E459206/30/2021
NY Acom Engineering7061311/09/2020
Building Lifecycle
All (166)Filed (25)Permit Issued (21)Signed Off (8)Facade (FISP) (12)Violation (52)Inspection (18)Special Inspection (30)
12/29/2025
Filed — Alteration
Removal of existing sprinkler heads and associated piping, followed by the installation of new sprinkler heads and necessary piping.
M01192581-P1
12/29/2025
Special inspection requirement — Sprinkler Systems
Brian McDonough
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian McDonough
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian McDonough
12/29/2025
Special inspection requirement — Sprinkler Systems
Brian McDonough
11/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/05/2025
Signed off — Alteration
Interior general construction work for existing office Space, Suite 5F as shown on plans.
M01242517-I1
10/31/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/15/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/11/2025
Permit issued — General Construction
M01242517-I1-GC
07/07/2025
Filed — Alteration
Interior general construction work for existing office Space, Suite 5F as shown on plans.
M01242517-I1
06/23/2025
Special inspection requirement — Final
JOSEPH YOUNG
05/29/2025
Filed — Alteration
PROVIDE PLUMBING WORK FOR BATHROOMS AND COMMERCIAL KITCHEN RENOVATIONS
M01191917-I1
05/29/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
05/28/2025
Filed — Alteration
MODIFICATIONS TO EXISTING DUCTWORK AND HVAC SYSTEMS.
M01191958-I1
05/28/2025
Filed — Alteration
M01191934-I1
05/17/2025
Filed — Alteration
SUPPORT OF PIZZA OVEN ON EXISTING DRAPED MESH SLAB AT 1st FLOOR OF COMMERCIAL BUILDING
M01191893-I1
05/17/2025
Special inspection requirement — Structural Steel - Details
05/16/2025
Filed — Alteration
INTERIOR RENOVATION OF EXISTING EATING & DRINKING ESTABLISHMENT.
M01191838-I1
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2025
Permit issued — Plumbing
M01192581-S2-PL
04/09/2025
Permit issued — Sprinklers
M01192581-S1-EW-SP
04/01/2025
Filed — Alteration
Removal of existing sprinkler heads and associated piping, followed by the installation of new sprinkler heads and necessary piping.
M01192581-S2
04/01/2025
Filed — Alteration
Removal of existing sprinkler heads and associated piping, followed by the installation of new sprinkler heads and necessary piping.
M01192581-S1
03/25/2025
Permit issued — General Construction
M01192581-I1-GC
03/23/2025
Filed — Alteration
Removal of existing sprinkler heads and associated piping, followed by the installation of new sprinkler heads and necessary piping.
M01192581-I1
03/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Brian McDonough
03/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Anthony Rini, III
03/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
Anthony Rini, III
03/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
Anthony Rini, III
03/10/2025
Special inspection requirement — Final
DAVID CHAGNON
03/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
03/07/2025
Special inspection requirement — Mechanical Systems
Anthony Rini, III
03/07/2025
Special inspection requirement — Final
03/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Anthony Rini, III
03/07/2025
Special inspection requirement — Final
Anthony Rini, III
03/07/2025
Special inspection requirement — Final
10/10/2024
Signed off — Alteration
M00931471-I1
04/01/2024
Violation issued (HPD, closed)
A
03/18/2024
Signed off — Alteration
INTERIOR ALTERATIONS FOR 10TH FLOOR DENTAL OFFICE. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00857092-S3
03/14/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/08/2024
Signed off — Alteration
INTERIOR ALTERATIONS FOR 10TH FLOOR DENTAL OFFICE. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00857092-I1
03/07/2024
Filed — Alteration
INTERIOR ALTERATIONS FOR 10TH FLOOR DENTAL OFFICE. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00857092-P1
03/07/2024
Special inspection requirement — Final
Albert Aronov
03/07/2024
Special inspection requirement — Maintenance information
Balser Richard
03/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Balser Richard
03/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Balser Richard
03/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Balser Richard
03/07/2024
Special inspection requirement — Mechanical Systems
Balser Richard
03/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Balser Richard
03/07/2024
Special inspection requirement — Interior lighting power
Balser Richard
03/07/2024
Special inspection requirement — Lighting controls
Balser Richard
03/06/2024
Special inspection requirement — Interior lighting power
Balser Richard
03/06/2024
Special inspection requirement — Lighting controls
Balser Richard
03/05/2024
Signed off — Alteration
INTERIOR ALTERATIONS FOR 10TH FLOOR DENTAL OFFICE. GENERAL CONSTRUCTION AND MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00857092-S1
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offCooper Works07/11/2025
DOB NOWPlumbingSigned-offPFL Mechanical04/15/2025
DOB NOWSprinklersSigned-offGrushinsky Pipng & Heating04/09/2025
DOB NOWGeneral ConstructionPermit IssuedDBJ Contracting03/25/2025
DOB NOWSidewalk ShedPermit IssuedEmpire NY Installations I03/05/2024
DOB NOWSupported ScaffoldPermit IssuedEmpire NY Installations I03/04/2024
DOB NOWSuspended ScaffoldPermit IssuedDemari Services02/29/2024
DOB NOWGeneral ConstructionSigned-offDemari Services02/20/2024
DOB NOWMechanical SystemsSigned-offMoreair Mechanical Services01/11/2024
DOB NOWSprinklersSigned-offMetflow Fire Control10/17/2023
DOB NOWMechanical SystemsSigned-offMoreair Mechanical Services07/28/2023
DOB NOWPlumbingSigned-offAqua Plumbing & Heating06/23/2023
DOB NOWGeneral ConstructionSigned-offPrecision Worldwide04/18/2023
DOB NOWMechanical SystemsPermit IssuedLC Con02/22/2023
DOB NOWPlumbingSigned-offPractical Plumbing & Heating04/15/2022
DOB NOWSprinklersSigned-offPractical Plumbing & Heating04/15/2022
DOB NOWPlumbingSigned-offPractical Plumbing & Heating03/14/2022
DOB NOWSprinklersSigned-offPractical Plumbing & Heating03/14/2022
DOB NOWPlumbingSigned-offFA Construction NY11/17/2020
DOB NOWPlumbingSigned-offAdrias Plumbing11/04/2020
DOB NOWPlumbingSigned-offAdrias Plumbing03/10/2020
BISOTISSUEDD.B.J. Contracting11/14/2025
BISOTISSUEDD.B.J. Contracting04/18/2024
BISOTISSUEDD.B.J. Contracting04/24/2023
BISOTISSUEDLC Con01/31/2022
BISOTISSUEDD.B.J. Contracting02/08/2021
BISOTISSUEDD.B.J. Contracting07/31/2020
BISOTISSUEDValente/C.A. Lindman06/10/2019
BISOTISSUEDValente/C.A. Lindman02/07/2019
BISOTISSUEDDemari Services02/09/2018
BISOTISSUEDDemari Services11/16/2017
BISEQISSUEDEmpire Scaffolding System10/11/2017
BISMHISSUEDD.B.J. Contracting02/25/2016
BIS—ISSUEDD.B.J. Contracting02/24/2016
BIS—ISSUEDD.B.J. Contracting08/19/2015
BISPLISSUEDReem Plumbing & Heating08/14/2015
BISSPISSUEDReem Plumbing & Heating08/14/2015
BISSPISSUEDAll Pro Plumbing & Heating11/23/2012
BISOTISSUEDChief Fire Prevention & Mechanical10/18/2012
BISOTISSUEDBirdrock Construction08/29/2012
+ 18 more permits on file
1 project · most recent 06/30/2021
Associated Ducts and Piping Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/30/2021Permit IssuedLC ConAssociated Ducts and Piping, Ventilation Systems
Ventilation
Fantech DEDP-705 193 CFM · Exhaust Fan ×1
Greenheck CSP-A1050-VG 250 CFM · Exhaust Fan ×1
Ducts & Piping
N/A N/A Ductwork ×1
1 project · most recent 12/29/2025
FiledStatusContractorScope
12/29/2025Signed-offGrushinsky Pipng & Heating208 heads
2 projects · most recent 12/29/2025
Water/Sanitary Gas
FiledStatusContractorScope
12/29/2025Signed-offPFL MechanicalWater/Sanitary
05/29/2025——Gas, Water/Sanitary
11 projects · most recent 02/10/2026
General Wiring
FiledStatusContractorScope
02/10/2026CompleteAllstate ElectricGeneral Wiring
12/03/2025Permit IssuedAllstate Electric1 meters, 1 new_meters
07/30/2025CompleteGreen Apple Electrical ServicesGeneral Wiring
06/21/2024Permit IssuedNew Phase Electrical Contractors1 meters
02/11/2024Permit IssuedMega Electrical Contracting—
09/19/2023CompleteRobert ChimentiGeneral Wiring
07/24/2023Permit IssuedNew Phase Electrical ContractorsGeneral Wiring
09/08/2019CompleteTuxedo Electrical Contracting—
07/13/2019Permit IssuedEinstein ElectricalGeneral Wiring
07/03/2019Permit IssuedSwitch Electric of the FiveGeneral Wiring
05/24/2019CompleteJumper ElectricGeneral Wiring
1 project · most recent 05/17/2025
Steel
FiledStatusContractorScope
05/17/2025——Steel
1 project · most recent 03/01/2024
Sidewalk Shed
FiledStatusContractorScope
03/01/2024Permit IssuedEmpire NY Installations ISidewalk Shed
1 project · most recent 02/21/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/21/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
11/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/31/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/15/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/19/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
12/29/2025Sprinkler SystemsBrian McDonoughspecial
12/29/2025Fire-Resistant Penetrations and JointsBrian McDonoughspecial
12/29/2025Fire-Resistant Penetrations and JointsBrian McDonoughspecial
12/29/2025Sprinkler SystemsBrian McDonoughspecial
06/23/2025FinalJOSEPH YOUNGprogress
05/29/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
05/17/2025Structural Steel - Details—special
03/17/2025Fire-Resistant Penetrations and JointsBrian McDonoughspecial
03/13/2025HVAC-R and service water piping design and insulationAnthony Rini, IIIenergy_progress
03/13/2025HVAC-R and service water heating equipmentAnthony Rini, IIIenergy_progress
03/13/2025HVAC-R and service water heating system controlsAnthony Rini, IIIenergy_progress
03/10/2025FinalDAVID CHAGNONprogress
03/07/2025Final—progress
03/07/2025Fire-Resistant Penetrations and Joints—special
03/07/2025Final—progress
03/07/2025Fire-Resistance Rated Construction—progress
03/07/2025Mechanical SystemsAnthony Rini, IIIspecial
03/07/2025Energy Code Compliance InspectionsAnthony Rini, IIIprogress
03/07/2025FinalAnthony Rini, IIIprogress
03/07/2024HVAC-R and service water heating equipmentBalser Richardenergy_progress
03/07/2024HVAC-R and service water heating system controlsBalser Richardenergy_progress
03/07/2024Interior lighting powerBalser Richardenergy_progress
03/07/2024HVAC-R and service water piping design and insulationBalser Richardenergy_progress
03/07/2024Fire-Resistant Penetrations and JointsBalser Richardspecial
03/07/2024Mechanical SystemsBalser Richardspecial
Latest 25 of 70.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Cedar Street CreativeOfficeFloor 5
Project M01242517 Alteration · LOC Issued · 07/07/2025
MotorinoRestaurant / Food ServiceFloor 1
Project M01191917 Alteration · Approved · 05/29/2025
Project M01191934 Alteration · Approved · 05/28/2025
Project M01191958 Alteration · Approved · 05/28/2025
Project M01191893 Alteration · Approved · 05/17/2025
Project M01191838 Alteration · Approved · 05/16/2025
VelemOfficeFloors 2, 3
Project M01192581 Alteration · Permit Entire · 03/23/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 606 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch20
08/31/2026M00857092-S1Request digital key ↗
08/31/2026M00857092-S3Request digital key ↗
08/31/2026M00857092-P1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00269250-I1Request digital key ↗
09/04/2026M00269250-P1Request digital key ↗
09/03/2026M00469284-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00269286-I1Request digital key ↗
09/03/2026M00469331-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00469284-I1Request digital key ↗
▸Applications & Permits101
▸BISPLAN / WORK APPROVAL APPLICATION50
11/18/2025123698409Open ↗
03/27/2020123854392Open ↗
03/10/2020122361069Open ↗
Showing 3 of 50 on file for this type
▸BISWORK PERMIT APPLICATION28
04/24/2023123698409Open ↗
02/02/2022123698409Open ↗
07/31/2020123698409Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWLPC Approval/Permit16
09/04/2026M00269250-P1Open ↗
09/04/2026M00269250-I1Open ↗
08/31/2026M00857092-I1Open ↗
Showing 3 of 16 on file for this type
▸BISPLACE OF ASSEMBLY5
10/12/2021120848716Open ↗
09/06/2019120848716Open ↗
09/05/2019120848716Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUSPENDED SCAFFOLD APPLICATION1
11/08/2017123351620Open ↗
▸Seals & Professional Certifications137
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
02/20/2020123854392Open ↗
11/14/2019123060944Open ↗
11/14/2019123060944Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/02/2026M00862039-I1Open ↗
09/02/2026M00862039-I1Open ↗
09/02/2026M01192581-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/05/2026M00269286-I1Open ↗
09/04/2026M00269250-P1Open ↗
09/04/2026M00269250-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/21/2026M00857092-S1Open ↗
09/02/2026M00862039-I1Open ↗
09/02/2026M00862039-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
02/20/2020123854392Open ↗
10/18/2018123060944Open ↗
10/10/2017140704628Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/20/2020123854392Open ↗
10/18/2018123060944Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/10/2017140704628Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/10/2017140704628Open ↗
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS3
09/21/2016122492052Open ↗
Showing 1 of 3 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes5
02/20/2020123854392Open ↗
11/01/2019123698409Open ↗
10/18/2018123060944Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan3
09/04/2026M00269250-I1Open ↗
09/04/2026M00269250-P1Open ↗
08/13/2026M00269286-I1Open ↗
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/16/2017123351620Open ↗
▸Environmental & Asbestos39
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/03/2026M00469284-I1Open ↗
08/31/2026M00857092-I1Open ↗
08/24/2026M01192581-S1Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
11/01/2019123698409Open ↗
10/18/2018123060944Open ↗
11/24/2017123174313Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
03/26/2020123854392Open ↗
11/08/2017123351620Open ↗
▸BISASBESTOS: EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00931471-I1Open ↗
▸Energy Compliance40
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS20
02/20/2020123854392Open ↗
11/14/2019123060944Open ↗
11/12/2019123060944Open ↗
Showing 3 of 20 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
11/14/2019123060944Open ↗
11/12/2019123060944Open ↗
11/04/2019123060944Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/29/2020123698409Open ↗
07/29/2020123698409Open ↗
07/18/2020123854392Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/10/2017140704628Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/14/2019123060944Open ↗
10/18/2018123060944Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/29/2020123698409Open ↗
10/10/2017140704628Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
10/18/2018123060944Open ↗
▸BISHYDRO FLOW TEST LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs95
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST51
01/21/2021122361069Open ↗
03/17/2020122361069Open ↗
02/14/2020122361069Open ↗
Showing 3 of 51 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE17
03/10/2020122361069Open ↗
02/25/2020122361069Open ↗
02/19/2020122361069Open ↗
Showing 3 of 17 on file for this type
▸BISLANDMARKS APPROVAL14
04/17/2020123698409Open ↗
02/20/2020123854392Open ↗
11/14/2019123060944Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER2
04/24/2023123698409Open ↗
02/02/2022123698409Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
02/20/2020123854392Open ↗
11/14/2019123060944Open ↗
11/12/2019123060944Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms79
▸BISBOROUGH INTAKE FORM35
10/12/2021120848716Open ↗
03/27/2020123854392Open ↗
03/17/2020122361069Open ↗
Showing 3 of 35 on file for this type
▸BISADDITIONAL INFORMATION25
10/19/2020121022428Open ↗
10/15/2020121022428Open ↗
06/25/2020121022428Open ↗
Showing 3 of 25 on file for this type
▸BISEFILING COVER SHEET18
02/20/2020123854392Open ↗
11/01/2019123698409Open ↗
10/18/2018123060944Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/10/2017140704628Open ↗
▸Other Documents17
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
06/02/2021121022428Open ↗
10/18/2018123060944Open ↗
Showing 2 of 7 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
04/14/2020122361069Open ↗
04/14/2020122361069Open ↗
04/14/2020122361069Open ↗
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/13/2026M01192581-I1Open ↗
08/13/2026M01242517-I1Open ↗
▸BISSAFETY MONITORING PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01007526-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01007526-I1Open ↗