BuildNYC
Office with commercial, 7-19 stories
15 WEST 37TH STREET
MANHATTAN · BIN 1015967
💬 Discuss this project
1920Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
129,465 sfGross Floor Area
22Units
LL97 Covered4 Active Violations 1 unresolved · 3 paperwork only 1 likely answered 4 old, status unconfirmed ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 1537 Realty · 9,194 sf lot · 14.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsAT&TUnder Construction1 filing
RoofAT&T5p · 5 filings · 14 docs
PenthouseKamber Management LLC1p · 1 filing · 2 docs
Floor 13Kamber Management LLC1 filing · 6 docs
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21537 Realty, LLC C/O Kamber Managem1p · 1 filing · 5 docs
Floor 1Kamber Management LLCUnder Construction2 filings · 6 docs
CellarKamber Management LLC1 filing · 6 docs
Site & exterior1537 Realty, LLC C/O Kamber Managem5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1537 Realty7007/08/2026
Jerrick Associates807/08/2026
1537 Associates703/21/2026
1537 Associates LLC-C O Kamber203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Reform Architecture207/01/2026
A Saxon Design Group201/30/2025
FL&M Engineering Design & Inspection604/15/2024
Tectonic Engineering808/16/2023
Baileys Engineering111/27/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen1403/21/2026
CCM Services Group303/21/2026
Hierarch-E203/21/2026
Green Studio603/21/2026
Millennium Designs of New York203/21/2026
Evangelista103/21/2026
AE Design Solution203/21/2026
Millennium Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LCS RestorationScaffold1207/08/2026
KR ProjectsGeneral Contractor407/08/2026
Hudson Plumbing & MCHPlumbing407/08/2026
LCS Restorationspecialty_contractor304/09/2026
Jacobs TelecommunGeneral Contractor307/08/2026
Jerrick AssociatesScaffold207/08/2026
Hylan Datacom & ElectricalElectrical203/21/2026
Harari DavidElectrical103/21/2026
Electrical SolutionsElectrical103/21/2026
IP YuElectrical103/21/2026
Samson ElectricElectrical103/21/2026
Omd ElectricalElectrical103/22/2026
High Quality Electric ofElectrical103/21/2026
I.P. ElectricElectrical103/21/2026
Blue Hudson ConstructionGeneral Contractor108/05/2026
Digital Contracting ServcsGeneral Contractor104/09/2026
Pma Construction ServicesGeneral Contractor107/08/2026
Citi-Wide ElectricElectrical103/22/2026
HV ElectricElectrical103/21/2026
Vertex ElectricElectrical103/21/2026
Ohm's ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
R Marsac Consulting329201/30/2025
Tectonic Engineering Cons106708/16/2023
Geiger Engineering689107/08/2021
Building Lifecycle
All (189)Filed (21)Permit Issued (26)Signed Off (6)Facade (FISP) (24)Violation (60)Inspection (1)Objection (34)Special Inspection (17)
08/04/2026
Permit issued — General Construction
M01424073-I1-GC
07/01/2026
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF VESTIBULE AND PARTITIONS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01424073-I1
05/21/2026
Objection resolved — Addressed
04/29/2026
Objection raised — Scope
04/29/2026
Objection raised — Cost
04/29/2026
Objection raised — Accessibility
04/13/2026
Cycle 9 facade report signed — SAFE
04/08/2026
Cycle 9 facade inspection completed
04/01/2026
Filed — Alteration
HEREBY FILING FOR THE INSTALLATION OF VESTIBULE AND PARTITIONS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01360364-I1
03/19/2026
Violation issued (ECB, closed)
Construction
03/11/2026
Permit issued — Sidewalk Shed
M00675248-I1-SH
03/10/2026
Cycle 9 facade report submitted
03/06/2026
Permit issued — Plumbing
M08047254-I1-PL
02/27/2026
Violation issued (ECB, closed)
Construction
02/16/2026
Special inspection requirement — Final
02/09/2026
Signed off — Alteration
Facade repairs as per plans filed herewith. No change in use, egress or occupancy.
M00528337-I1
02/05/2026
Signed off — Alteration
AT&T - Installation of new equipment platform and sector frame on the rooftop (10097550) as per plans. No change to use, egress or occupancy.
M08038363-I1
02/05/2026
Signed off — Alteration
Replacement of existing antennas on the rooftop (AT&T 10097550) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egress or occupancy.
M00789576-I1
11/30/2025
Cycle 9 facade report submitted
11/26/2025
Cycle 9 facade report signed — UNSAFE
11/25/2025
Cycle 9 facade inspection completed
08/19/2025
Signed off — Alteration
M01138164-I1
08/19/2025
Signed off — Alteration
Dish: Installation of new telecommunication antenna sectors,GPS & equipment cabinet on a new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance with 5/98.No change in use,egress or occupancy
M00995511-I1
07/07/2025
Permit issued — Suspended Scaffold
M00988806-I1-SC
06/15/2025
Cycle 9 facade report submitted
06/13/2025
Cycle 9 facade inspection completed
06/10/2025
Cycle 9 facade report signed — UNSAFE
05/06/2025
Permit issued — Sidewalk Shed
M00675248-I1-SH
04/22/2025
Permit issued — General Construction
M00528337-I1-GC
04/09/2025
Permit issued — Suspended Scaffold
M01138164-I1-SC
04/03/2025
Permit issued — Plumbing
M08047254-I1-PL
02/20/2025
Inspection — No Access-Final PL - More than 10 Requested Floors
No Access
View inspection ↗
02/14/2025
Objection resolved — Addressed
02/11/2025
Objection raised — Other
01/30/2025
Filed — Alteration
Dish: Installation of new telecommunication antenna sectors,GPS & equipment cabinet on a new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance with 5/98.No change in use,egress or occupancy
M00995511-P1
11/25/2024
Cycle 9 facade report submitted
11/25/2024
Cycle 9 facade report signed — UNSAFE
11/14/2024
Cycle 9 facade inspection completed
11/08/2024
Filed — Alteration
M01138164-I1
10/04/2024
Permit issued — Antenna
M00995511-I1-AN
05/21/2024
Permit issued — Antenna
M00789576-I1-AN
05/07/2024
Permit issued — Sidewalk Shed
M00675248-I1-SH
04/29/2024
Permit issued — Plumbing
M08047254-I1-PL
04/25/2024
Permit issued — General Construction
M00528337-I1-GC
04/15/2024
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE CODE 2014, NO CHANGES IN USE, EGRESS AND OCCUPANCY UNDER THIS APPLICATION.
M00675248-P1
03/11/2024
Objection resolved — Addressed
03/01/2024
Cycle 9 facade report submitted
02/29/2024
Objection raised — Zoning
02/22/2024
Filed — Alteration
Dish: Installation of new telecommunication antenna sectors,GPS & equipment cabinet on a new platform on roof. Installation of conduits&service room connection in cellar as per plans.All work is in compliance with 5/98.No change in use,egress or occupancy
M00995511-I1
02/06/2024
Permit issued — Suspended Scaffold
M00988806-I1-SC
02/05/2024
Filed — Alteration
Renewal of SR22-04041
M00988806-I1
01/18/2024
Cycle 9 facade inspection completed
01/16/2024
Violation issued (ECB, closed)
Local Law
09/15/2023
Objection resolved — Addressed
09/11/2023
Cycle 9 facade report signed — UNSAFE
09/01/2023
Special inspection requirement — Structural Steel - High Strength Bolting
Manojkumar Patel
09/01/2023
Special inspection requirement — Structural Steel - Details
Manojkumar Patel
09/01/2023
Special inspection requirement — Structural Steel - Welding
Manojkumar Patel
09/01/2023
Special inspection requirement — Final
Manojkumar Patel
09/01/2023
Special inspection requirement — Post-installed Anchors
Manojkumar Patel
Latest 60 of 189 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBlue Hudson Construction08/04/2026
DOB NOWSidewalk ShedPermit IssuedLCS Restoration03/11/2026
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH03/06/2026
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting07/07/2025
DOB NOWSidewalk ShedPermit IssuedLCS Restoration05/06/2025
DOB NOWGeneral ConstructionSigned-offLCS Restoration04/22/2025
DOB NOWSuspended ScaffoldSigned-offPPM Telecom04/09/2025
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH04/03/2025
DOB NOWAntennaSigned-offPma Construction Services10/04/2024
DOB NOWAntennaSigned-offDigital Contracting Servcs05/21/2024
DOB NOWSidewalk ShedPermit IssuedLCS Restoration05/07/2024
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH04/29/2024
DOB NOWGeneral ConstructionSigned-offLCS Restoration04/25/2024
DOB NOWSuspended ScaffoldPermit IssuedPedrol Contracting02/06/2024
DOB NOWSidewalk ShedPermit IssuedLCS Restoration05/26/2023
DOB NOWSidewalk ShedPermit IssuedLCS Restoration05/16/2023
DOB NOWPlumbingPermit IssuedHudson Plumbing & MCH05/04/2023
DOB NOWGeneral ConstructionSigned-offLCS Restoration04/28/2023
DOB NOWAntennaSigned-offArmentum Digital Infrastr04/26/2023
DOB NOWStructuralSigned-offArmentum Digital Infrastr04/26/2023
DOB NOWMechanical SystemsPermit IssuedArmentum Digital Infrastr04/25/2023
DOB NOWGeneral ConstructionSigned-offKR Projects05/12/2022
DOB NOWSidewalk ShedPermit IssuedLCS Restoration02/10/2022
DOB NOWGeneral ConstructionSigned-offKR Projects02/08/2022
DOB NOWSidewalk ShedSigned-offGE 2A Construction04/19/2018
DOB NOWSidewalk ShedSigned-offGE 2A Construction11/29/2017
BISMHISSUEDIdk Cooling08/13/2019
BISOTISSUEDJerrick Associates04/05/2018
BISOTISSUEDInterior Management03/09/2018
BISMHISSUEDInterior Management03/09/2018
BISPLISSUEDHenry Myers P & H12/14/2017
BISSPISSUEDKG Sprinkler12/14/2017
BISMHISSUEDInterior Management11/06/2017
BISOTISSUEDInterior Management11/06/2017
BISOTISSUEDA.R. Equipment09/13/2017
BISPLISSUEDPlumbing & Heating Doctor02/03/2017
BISMHISSUEDAlal Better Construction02/01/2017
BISOTISSUEDAlal Better Construction02/01/2017
BISOTISSUEDClear Cell Management11/14/2016
BISMHISSUEDIdk Cooling10/31/2016
+ 36 more permits on file
1 project · most recent 08/16/2023
Generators
FiledStatusContractorScopeMake / Model / Capacity
08/16/2023Permit IssuedJacobs TelecommunGenerators
Generators
Cummins CUMMINS C30N6 30 kW · Generator ×4
9 projects · most recent 10/24/2024
General Wiring Lighting
FiledStatusContractorScope
10/24/2024Permit IssuedVertex ElectricGeneral Wiring
05/13/2024Permit IssuedCiti-Wide ElectricGeneral Wiring
07/12/2023Permit IssuedFamularo Electrical ContractingGeneral Wiring
05/24/2023Permit IssuedHigh Quality Electric of—
04/19/2023Permit IssuedOmd Electrical1 meters, 1 new_meters
11/06/2019Permit IssuedAllstate Electrical ContGeneral Wiring
09/07/2018Permit IssuedHV ElectricGeneral Wiring
06/12/2018CompleteEinstein ElectricalGeneral Wiring
03/23/2018Permit IssuedTesta Electric CoGeneral Wiring, Lighting
2 projects · most recent 04/15/2024
Sidewalk Shed
FiledStatusContractorScope
04/15/2024Permit IssuedLCS RestorationSidewalk Shed
07/17/2023Permit IssuedLCS RestorationSidewalk Shed
1 project · most recent 02/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
02/05/2024Permit IssuedPedrol ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
02/20/2025No Access-Final PL - More than 10 Requested FloorsNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/16/2026Final—progress
09/01/2023Structural Steel - High Strength BoltingManojkumar Patelspecial
09/01/2023Structural Steel - DetailsManojkumar Patelspecial
09/01/2023Structural Steel - WeldingManojkumar Patelspecial
09/01/2023FinalManojkumar Patelprogress
09/01/2023Post-installed AnchorsManojkumar Patelspecial
07/06/2023FinalANTONIO GUALTIERIprogress
07/06/2023Structural Steel - High Strength BoltingANTONIO GUALTIERIspecial
07/06/2023Mechanical SystemsANTONIO GUALTIERIspecial
07/06/2023FinalANTONIO GUALTIERIprogress
07/06/2023Post-installed AnchorsANTONIO GUALTIERIspecial
07/06/2023Structural Steel - DetailsANTONIO GUALTIERIspecial
07/06/2023Structural Steel - WeldingANTONIO GUALTIERIspecial
05/25/2021MasonryELISHA GEIGERspecial
05/25/2021FinalELISHA GEIGERprogress
05/25/2021Structural Stability – Alterations of existing buildingsELISHA GEIGERspecial
11/21/2017FinalPAUL BAILEYprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteRoof
Project M08038361 Alteration · Permit Entire · 12/19/2022
Project M08038363 Alteration · LOC Issued · 12/19/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 509 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
09/06/2026M00002892-I1Request digital key ↗
09/06/2026M00012407-I1Request digital key ↗
09/03/2026M00528337-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits94
▸BISPLAN / WORK APPROVAL APPLICATION48
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
07/09/2018123148138Open ↗
Showing 3 of 48 on file for this type
▸BISWORK PERMIT APPLICATION45
08/13/2019123870597Open ↗
08/01/2019123709969Open ↗
04/06/2018123428923Open ↗
Showing 3 of 45 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications132
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
08/01/2019123709969Open ↗
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
Showing 3 of 54 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST20
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
04/05/2018123428923Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/06/2026M00012407-I1Open ↗
09/03/2026M00528337-I1Open ↗
09/02/2026M00675248-I1Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
04/05/2018123428923Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/28/2026M08038363-P1Open ↗
08/28/2026M08038363-P1Open ↗
08/28/2026M08038363-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026M00002892-I1Open ↗
08/28/2026M08038363-P1Open ↗
08/26/2026M08038363-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment37
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
07/26/2018123148138Open ↗
07/12/2017122908470Open ↗
03/22/2016122450766Open ↗
Showing 3 of 8 on file for this type
▸BISEQUIPMENT USE PERMITS7
07/26/2018123148138Open ↗
07/24/2018123148138Open ↗
07/12/2017122908470Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/09/2018123148138Open ↗
06/29/2018123148138Open ↗
11/02/2017123148138Open ↗
Showing 3 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
04/12/2017121847074Open ↗
▸Safety & Tenant Protection1
▸BISST-1: Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos44
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
06/26/2019123870597Open ↗
04/05/2018123428923Open ↗
11/02/2017123148138Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/06/2026M00012407-I1Open ↗
09/03/2026M00528337-I1Open ↗
09/01/2026M00789576-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance42
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS27
08/01/2019123709969Open ↗
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
Showing 3 of 27 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS10
12/14/2021123709969Open ↗
07/23/2018123148138Open ↗
06/14/2018123428923Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/14/2021123709969Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/14/2021123709969Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs46
▸BISADMINISTRATIVE OBJECTIONS18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
12/15/2021123709969Open ↗
07/23/2018123148138Open ↗
06/14/2018123428923Open ↗
Showing 3 of 18 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/23/2018123148138Open ↗
07/24/2017122908470Open ↗
04/01/2015140162384Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
06/20/2017123003739Open ↗
▸Cost, Insurance & Ownership45
▸BISCOST AFFIDAVIT45
12/14/2021123709969Open ↗
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
Showing 3 of 45 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET28
08/01/2019123709969Open ↗
06/26/2019123870597Open ↗
04/05/2018123428923Open ↗
Showing 3 of 28 on file for this type
▸BISBOROUGH INTAKE FORM6
07/23/2018123148138Open ↗
06/29/2018123148138Open ↗
06/14/2018123428923Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
07/09/2018123148138Open ↗
05/21/2018123148138Open ↗
02/18/2016122450766Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
07/18/2017122908470Open ↗
Showing 1 of 3 on file for this type
▸BISSupporting Document: Fee Deferment1
06/20/2017123003739Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01138164-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M00988806-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00988806-I1Open ↗