← Back
BuildNYC
Office with commercial, 7-19 stories
15 WEST 39TH STREET
MANHATTAN · BIN 1016044
💬 Discuss this project
1925Year Built
16Stories
O6Building Class
M1-9A/R12Zoning
79,056 sfGross Floor Area
23Units
LL97 Covered10 Active Violations 6 unresolved · 4 paperwork only 6 old, status unconfirmed ▸FISP: UNSAFE
Office with commercial, 7-19 stories · Owner of record: 15 W 39th St NY · 6,172 sf lot · 12.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsShow- Lain Cheng Northern Star Realty1 filing
RoofAT&T, AT&T Mobility5p · 4 filings · 16 docs
Floor 3Northern Strar Realty3p · 1 filing · 7 docs
Floor 2
Floor 1Northern Strar Realty1 filing · 2 docs
BasementNorthern Strar Realty1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Northern Star Realty NY6407/08/2026
15 West 39th St NY2403/22/2026
L.H. Charney Associates503/21/2026
Javse Realty303/21/2026
Cannon Media303/21/2026
Corcon103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Construction Permit Services603/21/2026
YBL NY203/21/2026
Lombardo Building Consultants103/21/2026
Expediting103/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Jacobs TelecommunGeneral Contractor903/21/2026
888 AssociatesScaffold904/09/2026
Electro Puentes Link WireGeneral Contractor603/21/2026
Best NY ConstructionGeneral Contractor407/08/2026
Five Stars Electrical ContractingElectrical303/21/2026
Polo Electric Corp D/B/AElectrical103/21/2026
Walton Electrical ConstructionElectrical103/21/2026
888 AssociatesGeneral Contractor107/08/2026
Patriot ElectricElectrical103/21/2026
JascoScaffold107/08/2026
Mazza ElectricElectrical103/21/2026
Maximum ElectricElectrical103/21/2026
Deboccia Electric ConstructionElectrical103/21/2026
Pugliese FrankElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524105/03/2024
A&B World Consulting5704103/05/2024
Scherer Design Group7921209/23/2022
Elevated Engineering3692208/31/2020
Building Lifecycle
All (114)Filed (9)Permit Issued (16)Signed Off (2)Facade (FISP) (13)Violation (60)Objection (10)Special Inspection (4)
10/13/2026
Violation issued (ECB, open)
Unknown
08/24/2026
Violation issued (ECB, open)
Unknown
06/04/2026
Cycle 9 facade report submitted
06/03/2026
Cycle 9 facade inspection completed
04/20/2026
Violation issued (ECB, open)
Local Law
03/31/2026
Violation issued (ECB, open)
Construction
03/02/2026
Permit issued — Sidewalk Shed
M00550533-I1-SH
02/27/2026
Violation issued (ECB, open)
Unknown
02/27/2026
Violation issued (ECB, closed)
Construction
02/27/2025
Permit issued — Structural
M00990712-I1-ST
01/10/2025
Permit issued — Suspended Scaffold
M01064162-I1-SC
11/26/2024
Permit issued — Sidewalk Shed
M00550533-I1-SH
11/21/2024
Permit issued — Suspended Scaffold
M01064162-I1-SC
11/01/2024
Violation issued (ECB, closed)
Unknown
07/03/2024
Permit issued — Structural
M00990712-I1-ST
06/13/2024
Filed — Alteration
Application for the installation and use of suspended scaffolding as per plans filed here. No change in egress, use or occupancy.
M01064162-I1
06/13/2024
Permit issued — Suspended Scaffold
M01064162-I1-SC
06/05/2024
Violation issued (ECB, closed)
Construction
05/29/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/03/2024
Filed — Alteration
M00990712-I1
04/12/2024
Permit issued — General Construction
M01013084-I1-GC
03/14/2024
Violation issued (ECB, open)
Local Law
03/12/2024
Violation issued (ECB, open)
Construction
03/05/2024
Filed — Alteration
JOB FILED TO FIT-OUT EXIST. OFFICE/SHOWROOM FLOOR INCLUDING NEW NON-BEARING PARTITION, NEW PAINTING AND LIGHTING AS PER PLAN. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
M01013084-I1
03/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Bomstein
03/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Alexander Bomstein
03/01/2024
Special inspection requirement — Interior lighting power
Alexander Bomstein
02/29/2024
Special inspection requirement — Final
JAMES CHENG
02/03/2023
Violation issued (ECB, open)
Construction
10/04/2022
Permit issued — Antenna
M08008489-I1-AN
09/23/2022
Filed — Alteration
M08008489-I1
07/19/2022
Violation issued (ECB, closed)
Construction
07/19/2022
Violation issued (ECB, closed)
Construction
07/08/2022
Permit issued — Sidewalk Shed
M00550533-I1-SH
05/12/2022
Signed off — Alteration
M00357857-I1
12/17/2021
Violation issued (ECB, closed)
Construction
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/18/2021
Violation issued (ECB, closed)
Construction
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
07/22/2021
Cycle 9 facade report submitted
07/22/2021
Cycle 9 facade report signed — UNSAFE
07/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/22/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/21/2021
Cycle 9 facade inspection completed
07/13/2021
Permit issued — Sidewalk Shed
M00550533-I1-SH
07/08/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M00550533-I1
07/08/2021
Permit issued — Sidewalk Shed
M00550533-I1-SH
05/26/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2021
Violation issued (ECB, closed)
Construction
03/17/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2021
Violation issued (ECB, closed)
Construction
01/20/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/22/2020
Violation issued (ECB, closed)
Construction
11/25/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/26/2020
Violation issued (ECB, closed)
Construction
10/07/2020
Signed off — Alteration
NEW T-MOBILE ANTENNA INSTALLATION ON THE ROOF. EXTERIOR CABINETS ON NEW STEEL PLATFORM ON THE ROOF. INSTALL RELATED SECTORS OF ANTENNAS ON THE ROOF. ALL IN CONFORMANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00017505-I1
09/03/2020
Violation issued (ECB, closed)
Construction
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit Issued888 Associates03/02/2026
DOB NOWStructuralPermit IssuedBest NY Construction02/27/2025
DOB NOWSuspended ScaffoldPermit IssuedJava Builders01/10/2025
DOB NOWSidewalk ShedPermit Issued888 Associates11/26/2024
DOB NOWSuspended ScaffoldPermit Issued888 Associates11/21/2024
DOB NOWStructuralPermit IssuedBest NY Construction07/03/2024
DOB NOWSuspended ScaffoldPermit IssuedJava Builders06/13/2024
DOB NOWGeneral ConstructionPermit Issued888 Associates04/12/2024
DOB NOWAntennaPermit IssuedArmentum Digital Infrastr10/04/2022
DOB NOWSidewalk ShedPermit Issued888 Associates07/08/2022
DOB NOWSidewalk ShedPermit Issued888 Associates07/13/2021
DOB NOWSidewalk ShedPermit IssuedJasco07/08/2021
DOB NOWAntennaSigned-offArmentum Digital Infrastr09/01/2020
DOB NOWAntennaPermit IssuedArmentum Digital Infrastr02/25/2019
DOB NOWAntennaSigned-offElectro Puentes Link Wire02/12/2019
DOB NOWAntennaSigned-offElectro Puentes Link Wire08/29/2018
BIS—ISSUED888 Associates08/14/2024
BISPLISSUEDXH&RC Plumbing and Heating03/14/2022
BIS—ISSUED888 Associates03/11/2022
BIS—ISSUED888 Associates11/18/2020
BISOTISSUEDBrooklyn Construction Service09/29/2020
BIS—ISSUED888 Associates03/12/2020
BISOTISSUEDJacobs Telecommun10/19/2017
BISOTISSUEDEmpire Erectors & Electric04/05/2017
BISOTISSUEDJacobs Telecommun07/19/2016
BISOTISSUEDEmpire Erectors & Electric06/08/2016
BIS—ISSUEDEmpire Erectors & Electric06/08/2016
BISOTISSUEDJacobs Telecommun04/29/2016
BISEQISSUEDAtco Restoration11/25/2015
BISOTISSUEDBechtel Infrastructure An06/05/2015
BISOTISSUEDJKT Construction03/31/2015
BISMHISSUEDJKT Construction03/31/2015
BISFPISSUEDMaster Fire Systems10/15/2014
BISSPISSUEDMetro Fire Protection07/22/2014
BISPLISSUEDS.K. Piping & Heating07/16/2014
BISEQISSUEDJKT Construction07/03/2014
BISOTISSUEDJKT Construction07/03/2014
BISMHISSUEDJKT Construction07/03/2014
BISEQISSUEDJKT Construction03/24/2014
BISOTISSUEDJKT Construction03/24/2014
+ 26 more permits on file
4 projects · most recent 07/19/2021
FiledStatusContractorScope
07/19/2021Permit IssuedRichard Neu—
03/18/2019Permit IssuedStar Electrical Contractors—
08/21/2018Permit IssuedStar Electrical Contractors—
08/02/2018CompleteRC3 Electric2 meters, 1 new_meters
1 project · most recent 07/08/2021
Sidewalk Shed
FiledStatusContractorScope
07/08/2021Permit Issued888 AssociatesSidewalk Shed
1 project · most recent 06/13/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/13/2024Permit IssuedJava BuildersSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/01/2024Fire-Resistant Penetrations and JointsAlexander Bomsteinspecial
03/01/2024Energy Code Compliance InspectionsAlexander Bomsteinprogress
03/01/2024Interior lighting powerAlexander Bomsteinenergy_progress
02/29/2024FinalJAMES CHENGprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AT&TTelecom siteRoof
Project M08008489 Alteration · Permit Entire · 09/23/2022
AT&T MobilityTelecom siteRoof
Project M00084367 Alteration · Permit Entire · 10/31/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 520 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch7
09/06/2026M00084367-I1Request digital key ↗
09/03/2026M00550533-I1Request digital key ↗
09/01/2026M08008489-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
09/06/2026M00017505-P1Request digital key ↗
09/04/2026M00357857-I1Request digital key ↗
08/14/2026M00017505-I1Request digital key ↗
▸Applications & Permits115
▸BISPLAN / WORK APPROVAL APPLICATION75
07/15/2024100730498Open ↗
07/05/2024100730498Open ↗
04/19/2024100730498Open ↗
Showing 3 of 75 on file for this type
▸BISWORK PERMIT APPLICATION39
08/14/2024100730498Open ↗
03/15/2022121424333Open ↗
09/29/2020140940490Open ↗
Showing 3 of 39 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/19/2020100730498Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISADDRESS - NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications99
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION54
10/25/2019100730498Open ↗
06/28/2019123768495Open ↗
12/12/2016121569203Open ↗
Showing 3 of 54 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
06/28/2019123768495Open ↗
06/08/2016122796322Open ↗
06/08/2016122796331Open ↗
Showing 3 of 12 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
08/19/2020140940490Open ↗
06/28/2019123768495Open ↗
06/08/2016122796322Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/06/2026M00017505-I1Open ↗
09/06/2026M00017505-P1Open ↗
09/06/2026M00084367-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/19/2020140940490Open ↗
11/18/2015140430399Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/19/2020140940490Open ↗
11/18/2015140430399Open ↗
Showing 2 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026M01013084-I1Open ↗
09/01/2026M01013084-I1Open ↗
09/01/2026M01013084-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M01013084-I1Open ↗
▸Trade Schedules & Equipment43
▸BISSELF-CERT PLUMBING NOTICE15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
02/17/2022100730498Open ↗
06/19/2017121480940Open ↗
Showing 2 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* FIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
11/23/2021100730498Open ↗
▸BIS* FIRE ALARM (FA) APPLICATION1
11/23/2021100730498Open ↗
▸Environmental & Asbestos26
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
08/19/2020140940490Open ↗
04/26/2016122715981Open ↗
Showing 2 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/06/2026M00017505-P1Open ↗
09/06/2026M00084367-I1Open ↗
09/04/2026M00357857-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS16
06/28/2019123768495Open ↗
06/06/2016122398280Open ↗
05/13/2016122715981Open ↗
Showing 3 of 16 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
06/09/2016122398280Open ↗
06/06/2016122398280Open ↗
07/21/2015121956703Open ↗
Showing 3 of 12 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/02/2022122715981Open ↗
11/05/2020140940490Open ↗
09/23/2020140940490Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/02/2022122715981Open ↗
11/05/2020140940490Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/02/2022122715981Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/19/2020140940490Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY18
03/03/2022102092575Open ↗
03/02/2022122715981Open ↗
03/02/2022122715981Open ↗
Showing 3 of 18 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19754
03/03/2022102092575Open ↗
02/25/2022100977999Open ↗
02/22/2022110141098Open ↗
Showing 3 of 4 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS3
02/22/2022140430399Open ↗
02/22/2022140430399Open ↗
02/22/2022140132862Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/02/2022122715981Open ↗
▸Approvals, Objections & Sign-offs60
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST28
03/07/2022122715981Open ↗
03/04/2022102092575Open ↗
03/04/2022104329460Open ↗
Showing 3 of 28 on file for this type
▸BISADMINISTRATIVE OBJECTIONS12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE9
07/15/2024100730498Open ↗
04/19/2024100730498Open ↗
04/09/2024100730498Open ↗
Showing 3 of 9 on file for this type
▸BISFINAL4
03/02/2022122715981Open ↗
02/22/2022140430399Open ↗
02/22/2022140132862Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/19/2017121480940Open ↗
06/09/2016122398280Open ↗
Showing 2 of 3 on file for this type
▸BISSUPERSEDING LETTER3
03/15/2022121424333Open ↗
03/13/2020100730498Open ↗
11/09/2017122715981Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership53
▸BISCOST AFFIDAVIT48
03/04/2022122715981Open ↗
08/19/2020140940490Open ↗
07/31/2020100730498Open ↗
Showing 3 of 48 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW35
03/03/2022104329460Open ↗
02/22/2022104272118Open ↗
02/22/2022110141098Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms35
▸BISEFILING COVER SHEET21
06/28/2019123768495Open ↗
06/08/2016122796322Open ↗
06/08/2016122796331Open ↗
Showing 3 of 21 on file for this type
▸BISADDITIONAL INFORMATION8
05/16/2024100730498Open ↗
05/03/2024100730498Open ↗
12/15/2020100730498Open ↗
Showing 3 of 8 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/19/2020140940490Open ↗
11/18/2015140430399Open ↗
Showing 2 of 3 on file for this type
▸BISBOROUGH INTAKE FORM3
08/14/2024100730498Open ↗
02/10/2022123768495Open ↗
10/25/2019100730498Open ↗
▸Other Documents11
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7793
02/25/2022100977999Open ↗
02/22/2022110141098Open ↗
02/22/2022104272118Open ↗
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN2
02/22/2022140430399Open ↗
02/22/2022140132862Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* FIRE STOPS 27-3451
02/22/2022104272118Open ↗
▸BISPLOT DIAGRAM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01064162-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01064162-I1Open ↗