← Back
Factory, light manufacturing
15 WEST 46 STREET
MANHATTAN · Midtown-Times Square · BIN 1034327
💬 Discuss this project
1920Year Built
10Stories
F5Building Class
C6-4.5Zoning
25,857 sfGross Floor Area
2Units
LL97 Covered0 Open ViolationsFISP: No Report Filed
Factory, light manufacturing · Owner of record: 15 WEST 46 LLC · 3,406 sf lot · 7.59 FAR built · Flood zone X
Locations of Work
StructuralElectricalMechanicalPlumbingEquipmentGeneral
Filed — no permit issued1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXTELL DEVELOPMENT1707/08/2026
CELTIC SERVICES NYC1604/09/2026
15 WEST REALTY ASSOCIATES203/21/2026
15 WEST 46 LLC103/22/2026
15 W REALTY ASSOC C O HEMATIAN103/21/2026
FIVE BOROUGH GENERAL CONTRACTING103/21/2026
15 WEST RL103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/04/2025$24.8M—— → —$957/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ANCORA ENGINEERING, PLLC1009/25/2025
AP PROFESSIONAL ENGINEERING PLLC507/08/2025
TOHFAZ UDDIN PE PC204/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITE DEM1603/21/2026
Rigid Structural Design, LLC403/21/2026
CELTIC SERVICES NYC203/21/2026
ARCHI PRO GROUP103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CELTIC SERVICES NYC INCGeneral Contractor707/08/2026
ALEXANDER EUGENEElectrical103/21/2026
DEPENDABLE MECHANICAL CORFire Protection106/28/2026
COLGATE ENTERPRISE CORPGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ANCORA ENGINEERING, PLLC6818409/25/2025
AP PROFESSIONAL ENGINEERI5974307/08/2025
Building Lifecycle
All (62)Filed (17)Permit Issued (7)Signed Off (2)Facade (FISP) (9)Violation (13)Inspection (4)Objection (2)Special Inspection (8)
12/11/2025
Signed off — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-I1
12/09/2025
Signed off — Alteration
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205132-I1
12/01/2025
Objection resolved — Addressed
10/27/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
10/27/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
10/15/2025
Objection raised — Other
10/14/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
09/25/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-P5
09/25/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-P4
09/25/2025
Special inspection requirement — Demolition
Gregory Moormann
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Gregory Moormann
07/08/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
M01189060-P4
07/08/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
M01189060-P5
07/02/2025
Permit issued — Full Demolition
M01088612-I1-FD
06/19/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
M01189060-P3
06/17/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-P3
06/16/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/27/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
M01189060-P2
05/27/2025
Permit issued — Standpipe
M01197976-I1-EW-SD
05/27/2025
Special inspection requirement — Post-installed Anchors
GURVINDER SINGH
05/27/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
GURVINDER SINGH
05/20/2025
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. SIDEWALK SHED SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. DEMOLITION IS FILED UNDER SEPARATE APPLICATION.
M01189060-P1
05/08/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-P2
05/08/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-P1
05/08/2025
Special inspection requirement — Demolition
Gregory Moormann
05/08/2025
Special inspection requirement — Structural Stability – Alterations of existing Buildings
Gregory Moormann
05/06/2025
Permit issued — Construction Fence
M01088612-S3-FN
05/02/2025
Permit issued — Protection and Mechanical Methods
M01088612-S1-PMM
04/28/2025
Filed — Alteration
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205132-P1
04/28/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-S3
04/18/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
GURVINDER SINGH
04/18/2025
Special inspection requirement — Post-installed Anchors
GURVINDER SINGH
04/16/2025
Permit issued — Protection and Mechanical Methods
M01205132-I1-PMM
04/15/2025
Filed — Alteration
Installation Of Temporary Single Personnel/Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01205132-I1
04/10/2025
Filed — Alteration
M01197976-I1
04/08/2025
Violation issued (ECB, closed)
Local Law
04/04/2025
Permit issued — Protection and Mechanical Methods
M01088612-S2-PMM
03/18/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-S2
03/13/2025
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-S1
02/05/2025
Permit issued — General Construction
M01173057-I1-GC
09/17/2024
Filed — Full Demolition
installation of chute to lower debris from floor to floor and mechanical means to assist
M01088612-I1
06/17/2024
Violation issued (ECB, closed)
Construction
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/05/2017
Violation issued (ECB, closed)
Elevators
06/25/2015
Cycle 8 facade report submitted
06/25/2015
Cycle 8 facade report signed — SWARMP
06/25/2015
Cycle 7 facade report submitted
06/25/2015
Cycle 7 facade report signed — SWARMP
05/07/2015
Cycle 8 facade inspection completed
05/07/2015
Cycle 7 facade inspection completed
03/03/2015
Violation issued (ECB, closed)
Local Law
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/10/2010
Violation issued (ECB, closed)
Construction
03/31/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/13/2007
Cycle 6 facade report submitted
02/05/2007
Cycle 6 facade report signed — SWARMP
05/18/2005
Cycle 6 facade inspection completed
08/08/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/25/1993
Violation issued (ECB, closed)
Construction
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offCELTIC SERVICES NYC INC07/02/2025
DOB NOWStandpipePermit IssuedDEPENDABLE MECHANICAL COR05/27/2025
DOB NOWConstruction FenceSigned-offCELTIC SERVICES NYC INC05/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offCELTIC SERVICES NYC INC05/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offCOLGATE ENTERPRISE CORP04/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offCELTIC SERVICES NYC INC04/04/2025
DOB NOWGeneral ConstructionSigned-offCELTIC SERVICES NYC INC02/05/2025
BISMHISSUEDMICHAEL JAMES INDUSTRIES07/28/2014
BISOTISSUEDFIVE BOROUGH GEN CONT LLC05/30/2013
BISBLISSUEDMETRO INCORPORATED11/28/2000
BISPLISSUEDMETRO INCORPORATED11/28/2000
BISEQISSUEDTBR INC05/16/2000
BISEQISSUEDA. SILMAC GLASS CORP08/22/1996
BISOTISSUEDA. SILMAC GLASS CORP08/22/1996
2 projects · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025CompleteNASH ELECTRIC SERVICES IN—
03/13/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
1 project · most recent 09/25/2025
Fence
FiledStatusContractorScope
09/25/2025Signed-offCELTIC SERVICES NYC INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/27/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
10/27/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
10/14/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
06/16/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
09/25/2025DemolitionGregory Moormannspecial
09/25/2025Structural Stability – Alterations of existing BuildingsGregory Moormannspecial
05/27/2025Post-installed AnchorsGURVINDER SINGHspecial
05/27/2025Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
05/08/2025DemolitionGregory Moormannspecial
05/08/2025Structural Stability – Alterations of existing BuildingsGregory Moormannspecial
04/18/2025Alternative Materials - OTCR Buildings Bulletin NumberGURVINDER SINGHspecial
04/18/2025Post-installed AnchorsGURVINDER SINGHspecial
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/24/2026M01197976-I1Request digital key ↗
08/24/2026M01205132-P1Request digital key ↗
08/24/2026M01205132-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/30/2014121894012Open ↗
05/31/2013121635267Open ↗
▸BISWORK PERMIT APPLICATION2
07/31/2014121894012Open ↗
05/31/2013121635267Open ↗
▸Seals & Professional Certifications22
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/24/2026M01197976-I1Open ↗
08/24/2026M01205132-P1Open ↗
08/24/2026M01205132-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
10/15/2014121894012Open ↗
07/30/2014121894012Open ↗
08/29/2013121635267Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/30/2014121894012Open ↗
05/31/2013121635267Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026M01088612-P5Open ↗
08/23/2026M01088612-P5Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/30/2014121894012Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
05/31/2013121635267Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION-PERMIT1
09/29/2014121894012Open ↗
▸BISEQUIPMENT USE PERMITS1
09/29/2014121894012Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026M01088612-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026M01088612-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026M01088612-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026M01088612-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026M01197976-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/21/2026M01088612-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026M01088612-I1Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/15/2014121894012Open ↗
07/30/2014121894012Open ↗
05/31/2013121635267Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/15/2014121894012Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
10/15/2014121894012Open ↗
08/29/2013121635267Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/30/2014121894012Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
10/15/2014121894012Open ↗
07/30/2014121894012Open ↗
08/29/2013121635267Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
07/30/2014121894012Open ↗
05/31/2013121635267Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/21/2026M01088612-P1Open ↗
08/21/2026M01088612-I1Open ↗
08/21/2026M01088612-P5Open ↗
▸DOB NOWStructure Photographs3
08/13/2026M01088612-P1Open ↗
08/13/2026M01088612-I1Open ↗
08/13/2026M01088612-P5Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026M01088612-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1