← Back
Building
15 WEST END AVENUE
BIN 3859497
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Floor 21p · 1 filing
Floor 11 filing
Site & exterior3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LBS CONSULTING SERVICES5607/08/2026
15 WEST END303/21/2026
15 WEST END AVENUE203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KINDO HOLDINGS, LLC1605/19/2023
ENTHINK ENGINEERS LLC506/08/2022
DOKA ENGINEERING PC108/30/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LBS CONSULTING SERVICES3403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G-NADO INCGeneral Contractor1207/08/2026
PROFESSIONAL LINE CORPGeneral Contractor507/08/2026
CHESAKL ENTERPRISES INCGeneral Contractor407/08/2026
AMOK INCFire Protection307/08/2026
AMOK INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZARINA KINDO, RA49001005/19/2023
ENTHINK ENGINEERS LLC6247406/08/2022
A&B WORLD CONSULTING, INC5704101/05/2021
Building Lifecycle
All (166)Filed (22)Permit Issued (18)Signed Off (11)Inspection (5)Objection (80)Special Inspection (30)
09/14/2023
Signed off — Alteration
Structural work in conjunction with a new building
B00520404-I1
06/20/2023
Signed off — Alteration
Mechanical work in conjunction with NB Application #321588643
B00404695-I1
06/14/2023
Signed off — Alteration
Installation of the temporary standpipe in conjunction with NB #321588643
B00475112-I1
06/09/2023
Signed off — Alteration
Plumbing work in conjunction with NB Application #321588643
B00404856-I1
05/19/2023
Filed — Alteration
Plumbing work in conjunction with NB Application #321588643
B00404856-P3
05/19/2023
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
05/19/2023
Special inspection requirement — HVAC and service water heating equipment
ZARINA KINDO
05/19/2023
Special inspection requirement — HVAC insulation and sealing
ZARINA KINDO
05/19/2023
Special inspection requirement — HVAC and service water heating system controls
ZARINA KINDO
05/19/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ZARINA KINDO
05/17/2023
Filed — Alteration
Plumbing work in conjunction with NB Application #321588643
B00404856-P2
05/17/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ZARINA KINDO
05/17/2023
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
05/17/2023
Special inspection requirement — HVAC insulation and sealing
ZARINA KINDO
05/17/2023
Special inspection requirement — HVAC and service water heating system controls
ZARINA KINDO
05/17/2023
Special inspection requirement — HVAC and service water heating equipment
ZARINA KINDO
04/12/2023
Signed off — Alteration
Use of small cranes during construction
B00584335-I1
03/31/2023
Signed off — Alteration
Installation of the construction fence around the property in conjunction with a new building
B00479170-I1
03/31/2023
Signed off — Alteration
B00637642-I1
03/31/2023
Signed off — Alteration
Installation of overhead and roof protection in conjunction with a new building
B00527147-I1
03/31/2023
Permit issued — Mechanical Systems
B00404695-I1-MS
03/07/2023
Inspection — Certified Medical Gas - MG - PL - Finish
Certified
View inspection ↗
03/07/2023
Inspection — Certified Medical Gas - MG - PL - Roughing
Certified
View inspection ↗
03/07/2023
Inspection — Certified Medical Gas - MG - PL - Test
Certified
View inspection ↗
03/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/18/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00566815-I1
01/18/2023
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00619941-I1
10/27/2022
Special inspection requirement — Final
ZARINA KINDO
10/27/2022
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
10/27/2022
Special inspection requirement — Shutoff dampers
ZARINA KINDO
10/27/2022
Special inspection requirement — Mechanical Systems
ZARINA KINDO
10/27/2022
Special inspection requirement — HVAC and service water heating system controls
ZARINA KINDO
10/27/2022
Special inspection requirement — HVAC insulation and sealing
ZARINA KINDO
10/27/2022
Special inspection requirement — HVAC and service water heating equipment
ZARINA KINDO
09/21/2022
Permit issued — Standpipe
B00475112-I1-EW-SD
09/18/2022
Objection resolved — Addressed
09/16/2022
Objection raised — Admin
09/12/2022
Filed — Alteration
Mechanical work in conjunction with NB Application #321588643
B00404695-P1
09/11/2022
Special inspection requirement — Final
ZARINA KINDO
09/11/2022
Special inspection requirement — Mechanical Systems
09/11/2022
Special inspection requirement — Energy Code Compliance Inspections
ZARINA KINDO
09/11/2022
Special inspection requirement — HVAC and service water heating equipment
ZARINA KINDO
09/11/2022
Special inspection requirement — Shutoff dampers
ZARINA KINDO
09/11/2022
Special inspection requirement — HVAC and service water heating system controls
ZARINA KINDO
09/11/2022
Special inspection requirement — HVAC insulation and sealing
ZARINA KINDO
09/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/02/2022
Permit issued — Structural
B00520404-I1-ST
07/11/2022
Permit issued — Protection and Mechanical Methods
B00527147-I1-PM
07/04/2022
Permit issued — Protection and Mechanical Methods
B00584335-I1-PM
06/13/2022
Special inspection requirement — Post-installed Anchors
Sunil Saigal
06/08/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00619941-P2
06/08/2022
Special inspection requirement — Post-installed Anchors
Sunil Saigal
03/28/2022
Objection resolved — Addressed
03/24/2022
Permit issued — Standpipe
B00475112-I1-EW-SD
03/24/2022
Objection raised — Scope
03/22/2022
Permit issued — Plumbing
B00404856-I1-PL
03/22/2022
Special inspection requirement — Structural Steel - Welding
ZARINA KINDO
03/22/2022
Special inspection requirement — Concrete - Cast-In-Place
ZARINA KINDO
03/22/2022
Special inspection requirement — Structural Cold-Formed Steel
ZARINA KINDO
03/22/2022
Special inspection requirement — Final
XIONGCAI GU
Latest 60 of 166 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offG-NADO INC03/31/2023
DOB NOWStandpipeSigned-offAMOK INC09/21/2022
DOB NOWStructuralSigned-offG-NADO INC08/02/2022
DOB NOWProtection and Mechanical MethodsSigned-offG-NADO INC07/11/2022
DOB NOWProtection and Mechanical MethodsSigned-offCHESAKL ENTERPRISES INC07/04/2022
DOB NOWStandpipeSigned-offAMOK INC03/24/2022
DOB NOWPlumbingSigned-offAMOK INC03/22/2022
DOB NOWConstruction FenceSigned-offG-NADO INC03/21/2022
DOB NOWProtection and Mechanical MethodsSigned-offPROFESSIONAL LINE CORP01/09/2022
DOB NOWSupported ScaffoldSigned-offPROFESSIONAL LINE CORP11/08/2021
DOB NOWProtection and Mechanical MethodsSigned-offCHESAKL ENTERPRISES INC09/23/2021
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP08/11/2021
DOB NOWStructuralSigned-offG-NADO INC07/07/2021
DOB NOWProtection and Mechanical MethodsSigned-offG-NADO INC07/07/2021
DOB NOWPlumbingSigned-offAMOK INC06/10/2021
DOB NOWConstruction FenceSigned-offG-NADO INC03/10/2021
DOB NOWStandpipeSigned-offAMOK INC03/10/2021
DOB NOWStructuralSigned-offG-NADO INC09/09/2020
BIS—ISSUEDG-NADO INC01/03/2023
BIS—ISSUEDG-NADO INC08/31/2022
BIS—ISSUEDG-NADO INC09/28/2021
BIS—ISSUEDG-NADO INC04/15/2021
BIS—ISSUEDG-NADO INC04/15/2021
BIS—ISSUEDNADKOS INC01/24/2018
BISEQISSUEDNADKOS INC01/24/2018
3 projects · most recent 09/28/2022
FiledStatusContractorScope
09/28/2022CompleteSTAR ELEC'L CONTRACTORS C—
01/30/2022CompleteACCURATE ELEC'L CORP.1 meters, 1 new_meters
07/29/2021CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/07/2023Certified Medical Gas - MG - PL - FinishCertifiedView ↗
03/07/2023Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
03/07/2023Certified Medical Gas - MG - PL - TestCertifiedView ↗
03/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
05/19/2023Energy Code Compliance InspectionsZARINA KINDOprogress
05/19/2023HVAC and service water heating equipment ZARINA KINDOenergy_progress
05/19/2023HVAC insulation and sealing ZARINA KINDOenergy_progress
05/19/2023HVAC and service water heating system controls ZARINA KINDOenergy_progress
05/19/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationZARINA KINDOspecial
05/17/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationZARINA KINDOspecial
05/17/2023Energy Code Compliance InspectionsZARINA KINDOprogress
05/17/2023HVAC insulation and sealing ZARINA KINDOenergy_progress
05/17/2023HVAC and service water heating system controls ZARINA KINDOenergy_progress
05/17/2023HVAC and service water heating equipment ZARINA KINDOenergy_progress
10/27/2022FinalZARINA KINDOprogress
10/27/2022Energy Code Compliance InspectionsZARINA KINDOprogress
10/27/2022Shutoff dampersZARINA KINDOenergy_progress
10/27/2022Mechanical SystemsZARINA KINDOspecial
10/27/2022HVAC and service water heating system controls ZARINA KINDOenergy_progress
10/27/2022HVAC insulation and sealing ZARINA KINDOenergy_progress
10/27/2022HVAC and service water heating equipment ZARINA KINDOenergy_progress
09/11/2022FinalZARINA KINDOprogress
09/11/2022Mechanical Systems—special
09/11/2022Energy Code Compliance InspectionsZARINA KINDOprogress
09/11/2022HVAC and service water heating equipment ZARINA KINDOenergy_progress
09/11/2022Shutoff dampersZARINA KINDOenergy_progress
09/11/2022HVAC and service water heating system controls ZARINA KINDOenergy_progress
09/11/2022HVAC insulation and sealing ZARINA KINDOenergy_progress
06/13/2022Post-installed AnchorsSunil Saigalspecial
Latest 25 of 50.
▾Documents — 95 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch12
09/01/2026B00566815-I1Request digital key ↗
08/31/2026B00637642-I1Request digital key ↗
08/30/2026B00520404-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing5
08/27/2026B00404856-P4Request digital key ↗
08/27/2026B00404856-P3Request digital key ↗
08/27/2026B00404856-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Structural3
09/02/2026B00356650-I1Request digital key ↗
08/15/2026B00356650-P2Request digital key ↗
08/15/2026B00356650-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/28/2026B00404695-I1Request digital key ↗
08/15/2026B00404695-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
08/15/2026B00475112-I1Request digital key ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature26
09/01/2026B00404695-I1Open ↗
09/01/2026B00404695-I1Open ↗
09/01/2026B00404695-I1Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
09/01/2026B00479170-I1Open ↗
09/01/2026B00584335-I1Open ↗
08/31/2026B00637642-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/02/2026B00619941-I1Open ↗
09/01/2026B00404695-I1Open ↗
08/31/2026B00404856-P3Open ↗
Showing 3 of 20 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00404695-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00404695-I1Open ↗
▸Filing & Intake Forms1
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00527147-P2Open ↗