2025Year Built
6Stories
D6Building Class
R6AZoning
45,334 sfGross Floor Area
40Units
0 Open Violations
Elevator apt, fireproof with stores · Owner of record: 15002 PROPERTY LLC · 12,236 sf lot · 3.7 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 1 filing · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 5
Floor 41p · 1 filing · 20 docs
Floor 3
Floor 23p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar4p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15002 PROPERTY7307/08/2026
OWNERS REP903/22/2026
CONSTRUCTION MNGT AA603/22/2026
SIRIUS SAFETY CONSULTANTS203/22/2026
EXCAVATION CONSULTANTS OF103/22/2026
150-02 LLC DBA NORTHERN BLVD CAR103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/16/2022$8.6M—NORTHERN BOULEVARD JOINT VENTURE LLC → 15002 PROPERTY LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY3603/21/2026
YBL NY203/21/2026
AE DESIGN SOLUTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION MNGT. AA,LLCGeneral Contractor1707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor903/21/2026
EXCAVATION CONSULTANTS OFGeneral Contractor507/08/2026
SAFEPIPE PLUMBING INCFire Protection207/08/2026
DPH PLUMBING & HTG CORPPlumbing207/08/2026
SAFEPIPE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131407/30/2025
Building Lifecycle
All (130)Filed (24)Permit Issued (6)Signed Off (12)Violation (12)Objection (46)Special Inspection (30)
05/27/2026
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-Z3
05/27/2026
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S3
12/23/2025
Special inspection requirement — Lighting in dwelling units
Fran Huang
12/23/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
STEVE LIN
12/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
12/23/2025
Special inspection requirement — Air barrier - visual inspection
Fran Huang
12/23/2025
Special inspection requirement — Metering
Fran Huang
12/23/2025
Special inspection requirement — Electrical motors and elevators
Fran Huang
12/23/2025
Special inspection requirement — Masonry
Fran Huang
12/23/2025
Special inspection requirement — Lowest Floor Elevation
Fran Huang
12/23/2025
Special inspection requirement — Air barrier — testing
Fran Huang
12/23/2025
Special inspection requirement — Insulation placement and R values
Fran Huang
12/23/2025
Special inspection requirement — Fenestration air leakage
Fran Huang
12/23/2025
Special inspection requirement — Protection of exposed foundation insulation
Fran Huang
12/23/2025
Special inspection requirement — Lighting controls
Fran Huang
12/23/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Fran Huang
12/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
12/23/2025
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
12/23/2025
Special inspection requirement — Subgrade Inspections
Fran Huang
12/23/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Fran Huang
12/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
12/23/2025
Special inspection requirement — Fenestration areas
Fran Huang
12/23/2025
Special inspection requirement — Exterior lighting power
Fran Huang
12/23/2025
Special inspection requirement — Interior lighting power
Fran Huang
12/23/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Fran Huang
12/23/2025
Special inspection requirement — Maintenance information
Fran Huang
12/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
12/23/2025
Special inspection requirement — Vestibules
Fran Huang
12/15/2025
Objection resolved — Addressed
12/12/2025
Objection raised — Admin
12/12/2025
Objection resolved — Addressed
11/14/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S1
10/29/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S2
10/13/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S8
10/13/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S4
10/13/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S5
10/13/2025
Signed off — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-S7
08/21/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fran Huang
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
08/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
08/05/2025
Objection raised — Admin
07/30/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-A2
06/27/2025
Violation issued (ECB, closed)
Construction
06/16/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-A1
05/08/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-P9
04/25/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-P8
04/22/2025
Violation issued (ECB, closed)
Site Safety
04/22/2025
Violation issued (ECB, closed)
Construction
04/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01038019-I1
04/16/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01038011-I1
04/16/2025
Signed off — Alteration
Q01056131-I1
04/04/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-P6
02/05/2025
Filed — New Building
PLUMBING WORK IN CONJUNCTION WITH NB APPLICATION #Q08037315.
Q08037315-P4
11/19/2024
Violation issued (ECB, closed)
Construction
10/29/2024
Signed off — Alteration
Q00858319-I1
10/18/2024
Filed — Alteration
Q01056131-P1
10/02/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/20/2024
Objection resolved — Addressed
08/20/2024
Objection resolved — Addressed
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC06/06/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/20/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/09/2024
DOB NOWConstruction FenceSigned-offEXCAVATION CONSULTANTS OF11/28/2023
DOB NOWConstruction FenceSigned-offEXCAVATION CONSULTANTS OF08/28/2023
DOB NOWConstruction FenceSigned-offEXCAVATION CONSULTANTS OF04/25/2023
BIS—ISSUEDEXCAVATION CONSULTANTS OF05/04/2023
BISEQISSUEDEXCAVATION CONSULTANTS OF05/04/2023
BISOTISSUEDTOWER CREATIONS CORP09/30/2019
BISPLISSUEDM BURTON P & H CORP09/03/2019
BISPLISSUEDM BURTON P & H CORP09/07/2012
BISMHISSUEDTELETEMP06/02/2006
BISOTISSUEDBURTON PLUMBING & HEATING03/03/2005
BISPLISSUEDM BURTON P & H CORP02/09/2005
BISPLISSUEDM BURTON P & H CORP10/22/1999
BIS—ISSUEDNORTHERN BLVD CAR WASH IMC06/01/1999
BIS—ISSUEDNA07/15/1996
BISOTISSUEDKATZ SHEET METAL09/07/1993
BISMHISSUEDKATZ SHEET METAL01/28/1993
BIS—ISSUEDDOLA CONSTR. CORP04/08/1992
BIS—ISSUEDNORTHERN BLVD CAR WASH INC11/14/1990
1 project · most recent 07/30/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/30/2025Signed-offCONSTRUCTION MNGT. AA,LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUZ-HA24NHA1 2 tons · Vrf Outdoor ×42
PUY-A24NHA7-BS 2 tons · Vrf Outdoor ×2
PUZ-A12NKA7 1 tons · Vrf Outdoor ×1
Aaon RN-008-8-0-EB09-3LB 8 tons · Rooftop Unit ×2
Gree GMW-24WL/C-T(U) 2 tons · Heat Pump Outdoor ×43
GMW-24WL/C-T(U), 4LIV18HP230V1AO 2 tons · Heat Pump Outdoor ×2
Ventilation
Greenheck CUE-080-VG 175 CFM · Exhaust Fan ×6
SQ-97-VG 180 CFM · Exhaust Fan ×4
CUE-060-VG 100 CFM · Exhaust Fan ×2
CUE-070-VG 175 CFM · Exhaust Fan ×2
CUE-090-VG 400 CFM · Exhaust Fan ×2
CUE-100HP-VG 225 CFM · Exhaust Fan ×2
SP-A90-130-VG 70 CFM · Exhaust Fan ×2
SQ-60-VG 75 CFM · Exhaust Fan ×1
Fantech FG 6M EC 90 CFM · Exhaust Fan ×3
Rupp Air DU12HRA 350 CFM · Exhaust Fan ×14
RA-SIF10DD 180 CFM · Kitchen Exhaust ×4
DFA-100-RA 90 CFM ×3
CFA-D150-RA 70 CFM ×2
DU33HRA 400 CFM · Exhaust Fan ×1
1 project · most recent 07/30/2025
Sprinkler System
FiledStatusContractorScope
07/30/2025Signed-offSAFEPIPE PLUMBING INCSprinkler System
1 project · most recent 07/30/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/30/2025Signed-offSAFEPIPE PLUMBING INCGas, Storm, Water/Sanitary
6 projects · most recent 06/13/2025
General Wiring
FiledStatusContractorScope
06/13/2025CompleteRIGHTWAY ELECTRICAL INCGeneral Wiring
10/01/2024CompleteRIGHTWAY ELECTRICAL INC—
05/15/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
05/15/2024CompleteINTELOGIC ELECTRIC, INC.General Wiring
04/23/2024CompleteSOLAS ELECTRICAL CORP—
04/26/2019CompleteWILLDAN ELECTRICAL OF NY—
1 project · most recent 07/30/2025
Concrete
FiledStatusContractorScope
07/30/2025Signed-offCONSTRUCTION MNGT. AA,LLCConcrete
1 project · most recent 07/30/2025
Fence
FiledStatusContractorScope
07/30/2025Signed-offCONSTRUCTION MNGT. AA,LLCFence
1 project · most recent 07/30/2025
Earthwork
FiledStatusContractorScope
07/30/2025Signed-offCONSTRUCTION MNGT. AA,LLCEarthwork
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
12/23/2025Maintenance informationFran Huangenergy_progress
12/23/2025Air barrier - visual inspectionFran Huangenergy_progress
12/23/2025Electrical motors and elevatorsFran Huangenergy_progress
12/23/2025MeteringFran Huangenergy_progress
12/23/2025Protection of exposed foundation insulationFran Huangenergy_progress
12/23/2025VestibulesFran Huangenergy_progress
12/23/2025Fenestration and door U-factor and product ratingsFran Huangenergy_progress
12/23/2025Fenestration air leakageFran Huangenergy_progress
12/23/2025Lighting in dwelling unitsFran Huangenergy_progress
12/23/2025Insulation placement and R valuesFran Huangenergy_progress
12/23/2025Lighting controlsFran Huangenergy_progress
12/23/2025Wall Panels, Curtain Walls, and VeneersFran Huangspecial
12/23/2025Subsurface Investigations (Borings/Test Pits)STEVE LINspecial
12/23/2025Exterior Insulation and Finish Systems (EIFS)Fran Huangspecial
12/23/2025Fire-Resistant Penetrations and JointsFran Huangspecial
12/23/2025Concrete - Cast-In-PlaceFran Huangspecial
12/23/2025MasonryFran Huangspecial
12/23/2025Subgrade InspectionsFran Huangspecial
12/23/2025Excavations - Sheeting, Shoring, and BracingFran Huangspecial
12/23/2025Lowest Floor ElevationFran Huangprogress
12/23/2025Energy Code Compliance InspectionsFran Huangprogress
12/23/2025Fire-Resistance Rated ConstructionFran Huangprogress
12/23/2025Fenestration areasFran Huangenergy_progress
12/23/2025Air barrier — testing Fran Huangenergy_progress
12/23/2025Exterior lighting powerFran Huangenergy_progress
Latest 25 of 150.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch23
08/24/2026Q00858319-I1Request digital key ↗
08/24/2026Q08037315-A5Request digital key ↗
08/24/2026Q08037315-A2Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
08/24/2026Q08037315-A5Request digital key ↗
08/24/2026Q08037315-A1Request digital key ↗
Showing 2 of 3 on file for this type
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION16
01/23/2026421744134Open ↗
01/23/2026402078979Open ↗
01/23/2026400879395Open ↗
Showing 3 of 16 on file for this type
▸BISWORK PERMIT APPLICATION6
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
07/18/2023421947086Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
12/01/2025421843811Open ↗
12/01/2025421843811Open ↗
12/01/2025421843811Open ↗
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
12/20/2019421744134Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
08/22/2024440818386Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/24/2026Q08037315-P2Open ↗
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
Showing 3 of 6 on file for this type
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/01/2025421843811Open ↗
▸Seals & Professional Certifications170
▸DOB NOWProgress Inspector Seal & Signature80
09/29/2026Q08037315-S4Open ↗
09/29/2026Q08037315-S4Open ↗
09/23/2026Q08037315-S1Open ↗
Showing 3 of 80 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature61
09/29/2026Q08037315-S4Open ↗
09/29/2026Q08037315-S4Open ↗
09/29/2026Q08037315-S4Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/24/2026Q00858319-I1Open ↗
08/24/2026Q08037315-S4Open ↗
08/24/2026Q08037315-A5Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
09/19/2019421744134Open ↗
07/31/2019400879395Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
09/19/2019421744134Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
07/09/2024440818386Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/19/2019421744134Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/09/2024440818386Open ↗
▸Trade Schedules & Equipment13
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
08/24/2026Q08037315-P2Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
08/20/2019400879395Open ↗
06/09/2017400879395Open ↗
06/09/2017400879395Open ↗
▸BISGAS CUT-OFF3
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
07/18/2023421947086Open ↗
▸BISSEWER CUT-OFF2
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist6
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
▸BISSTREET TREE CHECKLIST2
08/22/2024440818386Open ↗
08/22/2024440818386Open ↗
▸BISANTI-HARASSMENT CHECKLIST1
07/18/2023421947086Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/18/2023421947086Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/22/2024440818386Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/24/2026Q08037315-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWOER: Notice to Proceed11
08/24/2026Q08037315-S4Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-S7Open ↗
08/24/2026Q08037315-S5Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
07/09/2024440818386Open ↗
10/02/2019421744134Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
08/24/2026Q08037315-S3Open ↗
08/24/2026Q08037315-S1Open ↗
▸Inspections & Test Reports9
▸DOB NOWSOIL REPORT7
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/24/2026Q08037315-S4Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs10
▸BISLETTERS - SUPPORTING DOCUMENTATION8
08/16/2023421947086Open ↗
08/16/2023421947086Open ↗
08/16/2023421947086Open ↗
Showing 3 of 8 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM2
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/18/2023421947086Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
08/16/2023421947086Open ↗
▸BISCOST AFFIDAVIT1
09/19/2019421744134Open ↗
▸Filing & Intake Forms15
▸BISBOROUGH INTAKE FORM7
08/16/2023421947086Open ↗
07/18/2023421947086Open ↗
03/10/2023421947086Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET4
03/10/2023421947086Open ↗
12/28/2022421947086Open ↗
12/27/2022421947086Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
08/22/2024440818386Open ↗
03/04/2020421744134Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
07/09/2024440818386Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/09/2024440818386Open ↗
▸Other Documents23
▸DOB NOWSite Survey: Initial6
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProperty Ownership Certification6
08/24/2026Q08037315-A5Open ↗
08/24/2026Q08037315-A1Open ↗
08/24/2026Q08037315-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/24/2026Q08037315-S5Open ↗
08/24/2026Q08037315-S4Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/09/2024440818386Open ↗
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
03/04/2020421744134Open ↗
▸BISRESTRICTION: DEED1
12/01/2025421843811Open ↗