← Back
Three families
150-03 61 ROAD
QUEENS · BIN 4141325
💬 Discuss this project
1950Year Built
2Stories
C0Building Class
R4Zoning
2,475 sfGross Floor Area
3Units
Three families · 2,000 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/22/2019$1.1M—Private party → Private party$448/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ALBERTO ROMAN208/09/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYX ENGINEERING, PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LG ELITE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AR-TECH ENGINEERING, P.C.6659208/09/2020
Building Lifecycle
All (8)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (4)
01/06/2021
Signed off — Alteration
FILING TO PERFORM GAS TEST FOR (2) GAS METER AND REPLACE (1)H.W.H.,(1)BOILER AND NEW INSTALL (1)H.W.H.,(1)BOILER IN THE CELLAR. REPAIR & REPLACE GAS PIPING CONNECTED TO THE GAS METER AS NECESSARY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00311630-I1
08/09/2020
Filed — Alteration
FILING TO PERFORM GAS TEST FOR (2) GAS METER AND REPLACE (1)H.W.H.,(1)BOILER AND NEW INSTALL (1)H.W.H.,(1)BOILER IN THE CELLAR. REPAIR & REPLACE GAS PIPING CONNECTED TO THE GAS METER AS NECESSARY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00311630-P1
08/09/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
08/09/2020
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
08/09/2020
Special inspection requirement — HVAC and service water heating system controls
ALBERTO ROMAN
08/09/2020
Special inspection requirement — HVAC and service water heating equipment
ALBERTO ROMAN
03/06/2020
Permit issued — Plumbing
Q00311630-I1-PL
02/24/2020
Filed — Alteration
FILING TO PERFORM GAS TEST FOR (2) GAS METER AND REPLACE (1)H.W.H.,(1)BOILER AND NEW INSTALL (1)H.W.H.,(1)BOILER IN THE CELLAR. REPAIR & REPLACE GAS PIPING CONNECTED TO THE GAS METER AS NECESSARY. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q00311630-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC03/06/2020
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
08/09/2020Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
08/09/2020Energy Code Compliance InspectionsALBERTO ROMANprogress
08/09/2020HVAC and service water heating system controls ALBERTO ROMANenergy_progress
08/09/2020HVAC and service water heating equipment ALBERTO ROMANenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing2
08/28/2026Q00311630-I1Request digital key ↗
08/15/2026Q00311630-P1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026Q00311630-P1Open ↗
09/02/2026Q00311630-P1Open ↗
09/02/2026Q00311630-P1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00311630-I1Open ↗
08/13/2026Q00311630-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026Q00311630-P1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/28/2026Q00311630-I1Open ↗
08/13/2026Q00311630-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/28/2026Q00311630-I1Open ↗
08/13/2026Q00311630-P1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00311630-I1Open ↗