← Back
Walk-up apt, over six families with stores
150-07 41ST AVENUE
QUEENS · Murray Hill-Broadway Flushing · BIN 4803805
💬 Discuss this project
2020Year Built
4Stories
C7Building Class
R5Zoning
7,266 sfGross Floor Area
18Units
Rent Stabilized0 Open Violations
Walk-up apt, over six families with stores · 5,259 sf lot · 1.38 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 21p · 1 filing · 20 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIERA CONTRACTING904/09/2026
HAWK CONTRACTING OF NY IN703/22/2026
HANK CONTRACTING OF NY IN303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DRAFT MASTER ENGINEERING PC1006/17/2024
GREEN DESIGN307/29/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FULL CIRCLE PLUMBING CORP.Plumbing807/08/2026
RICHARD NEUElectrical103/22/2026
TRIERA CONTRACTING INCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DRAFT MASTER ENGINEERING7011006/17/2024
Building Lifecycle
All (79)Filed (13)Permit Issued (9)Signed Off (9)Violation (16)Inspection (2)Special Inspection (30)
03/28/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
Q00364468-I1
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S4
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S6
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S2
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S3
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S1
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S5
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S7
08/27/2024
Signed off — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-I1
07/18/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
07/17/2024
Permit issued — Boiler Equipment
Q01020580-S6-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S2-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S7-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S4-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S5-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S3-BE
06/25/2024
Permit issued — Boiler Equipment
Q01020580-S1-BE
06/17/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-P2
06/12/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
06/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
06/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
06/12/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
06/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY GURBALL
06/03/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S4
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S6
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S2
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S3
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S1
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S5
04/29/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-S7
04/22/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-P1
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Maintenance information
ANTHONY GURBALL
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ANTHONY GURBALL
04/22/2024
Special inspection requirement — Heating Systems
ANTHONY GURBALL
04/12/2024
Permit issued — Boiler Equipment
Q01020580-I1-BE
03/19/2024
Filed — Alteration
INSTALLATION OF (1) GAS NAVIEN NCB 240/130H HOT WATER SUPPLY BOILER ON 3RD FLOOR FOR APT #2 ON 3RD FLOOR
Q01020580-I1
10/05/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP07/17/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP06/25/2024
DOB NOWBoiler EquipmentSigned-offFULL CIRCLE PLUMBING CORP04/12/2024
DOB NOWSidewalk ShedSigned-offTRIERA CONTRACTING INC06/30/2020
BISPLISSUEDFULL CIRCLE PLUMBING CORP.08/07/2024
BIS—ISSUEDDROMOS CORPORATION03/19/2024
BIS—ISSUEDDROMOS CORPORATION11/02/2023
BISPLISSUEDFULL CIRCLE PLUMBING CORP.08/08/2023
BISEQISSUEDHAWK CONTRACTING OF NY IN04/05/2022
BIS—ISSUEDHAWK CONTRACTING OF NY IN04/05/2022
BISPLISSUEDFULL CIRCLE PLUMBING CORP.10/09/2021
BIS—ISSUEDHAWK CONTRACTING OF NY IN08/03/2021
BIS—ISSUEDHAWK CONTRACTING OF NY IN03/10/2021
BIS—ISSUEDHAWK CONTRACTING OF NY IN03/10/2021
BISEQISSUEDHAWK CONTRACTING OF NY IN03/10/2021
BISPLISSUEDFULL CIRCLE PLUMBING CORP.09/21/2020
BISEQISSUEDHAWK CONTRACTING OF NY IN03/06/2020
BIS—ISSUEDHAWK CONTRACTING OF NY IN03/06/2020
BIS—ISSUEDHAWK CONTRACTING OF NY IN03/06/2020
3 projects · most recent 11/11/2021
General Wiring
FiledStatusContractorScope
11/11/2021CompleteJAM ELECTRICAL CORP—
09/15/2020CompleteKJK ELECTRIC INCGeneral Wiring
06/30/2020CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/18/2024Pass-Final Boiler Equipment InspectionPassView ↗
06/03/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
06/12/2024Heating SystemsANTHONY GURBALLspecial
06/12/2024HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
06/12/2024HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
06/12/2024Maintenance informationANTHONY GURBALLenergy_progress
06/12/2024HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
04/22/2024Heating SystemsANTHONY GURBALLspecial
04/22/2024Maintenance informationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
04/22/2024Heating SystemsANTHONY GURBALLspecial
04/22/2024HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
04/22/2024Maintenance informationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
04/22/2024Heating SystemsANTHONY GURBALLspecial
04/22/2024Maintenance informationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
04/22/2024Heating SystemsANTHONY GURBALLspecial
04/22/2024HVAC-R and service water piping design and insulationANTHONY GURBALLenergy_progress
04/22/2024Maintenance informationANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating equipmentANTHONY GURBALLenergy_progress
04/22/2024HVAC-R and service water heating system controlsANTHONY GURBALLenergy_progress
Latest 25 of 35.
▾Documents — 215 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch10
08/23/2026Q01020580-P2Request digital key ↗
08/23/2026Q01020580-S7Request digital key ↗
08/23/2026Q01020580-S6Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
08/28/2026Q00364468-I1Request digital key ↗
08/15/2026Q00364468-P1Request digital key ↗
08/15/2026Q00364468-P2Request digital key ↗
▸Applications & Permits44
▸BISPLAN / WORK APPROVAL APPLICATION29
06/11/2025421482201Open ↗
06/06/2025421482201Open ↗
05/30/2025421482201Open ↗
Showing 3 of 29 on file for this type
▸BISWORK PERMIT APPLICATION9
05/30/2025421482201Open ↗
03/14/2025421482201Open ↗
11/22/2023421482201Open ↗
Showing 3 of 9 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/06/2025421731558Open ↗
08/11/2023421731558Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/01/2025421482201Open ↗
07/01/2025421482201Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/08/2023421482201Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
01/06/2025421731558Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISVERIFY TAX LOT1
01/14/2025421482201Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
01/13/2025421482201Open ↗
▸BISZONING DIAGRAM1
05/02/2019421482201Open ↗
▸Seals & Professional Certifications35
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/28/2026Q00364468-I1Open ↗
08/28/2026Q00364468-P2Open ↗
08/28/2026Q00364468-P1Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
03/14/2020421482201Open ↗
03/14/2020421482201Open ↗
03/14/2020421482201Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026Q01020580-S1Open ↗
08/29/2026Q01020580-S5Open ↗
08/26/2026Q01020580-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026Q01020580-S1Open ↗
08/29/2026Q01020580-S5Open ↗
08/26/2026Q01020580-S3Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING10
10/11/2024421482201Open ↗
10/09/2024421482201Open ↗
09/06/2024421482201Open ↗
Showing 3 of 10 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/16/2017421482201Open ↗
▸BISSPRINKLER SYSTEMS1
01/09/2024421482201Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST3
11/18/2024421731558Open ↗
04/03/2018421482201Open ↗
03/22/2018421602073Open ↗
▸BISSTREET TREE SIGNOFF1
01/13/2025421482201Open ↗
▸Energy Compliance23
▸DOB NOWPreliminary Commissioning Report Certification8
08/13/2026Q01020580-S5Open ↗
08/13/2026Q01020580-S3Open ↗
08/13/2026Q01020580-S2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
03/14/2020421482201Open ↗
03/14/2020421482201Open ↗
04/05/2019421482201Open ↗
Showing 3 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
11/21/2023421482201Open ↗
▸BISINTERIOR LIGHTING POWER1
11/21/2023421482201Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/21/2023421482201Open ↗
▸BISFENESTRATION AREAS1
11/21/2023421482201Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/21/2023421482201Open ↗
▸BISLIGHTING IN DWELLING UNITS1
11/21/2023421482201Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/21/2023421482201Open ↗
▸BISELECTRIC MOTORS1
11/21/2023421482201Open ↗
▸BISLIGHTING CONTROLS1
11/21/2023421482201Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/21/2025421482201Open ↗
▸Inspections & Test Reports14
▸BISCONCRETE - CAST-IN-PLACE1
11/21/2023421482201Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/29/2023421482201Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/10/2024421482201Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/21/2023421482201Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/21/2023421482201Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/21/2023421482201Open ↗
▸BISMASONRY1
11/21/2023421482201Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
11/21/2023421482201Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/01/2022421482201Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/21/2023421482201Open ↗
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER1
03/14/2020421482201Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/02/2019421482201Open ↗
▸BISMECHANICAL SYSTEMS1
01/09/2024421482201Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
03/14/2020421482201Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE5
06/06/2025421482201Open ↗
05/30/2025421482201Open ↗
05/30/2024421482201Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
06/09/2025421482201Open ↗
06/09/2025421482201Open ↗
04/26/2018421482201Open ↗
▸BISSUPERSEDING LETTER2
03/14/2025421482201Open ↗
09/29/2021421482201Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/09/2025421482201Open ↗
09/29/2021421482201Open ↗
03/14/2020421482201Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
03/14/2025421482201Open ↗
03/14/2020421482201Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction1
01/06/2025421731558Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
01/06/2025421731558Open ↗
▸Filing & Intake Forms28
▸BISADDITIONAL INFORMATION20
07/01/2025421482201Open ↗
07/01/2025421482201Open ↗
04/16/2025421482201Open ↗
Showing 3 of 20 on file for this type
▸BISEFILING COVER SHEET5
07/20/2019421731558Open ↗
03/22/2018421602073Open ↗
01/24/2018421482201Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
05/30/2025421482201Open ↗
03/14/2025421482201Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/22/2018421602073Open ↗
▸Other Documents10
▸BISPLOT DIAGRAM2
10/24/2017421482201Open ↗
10/24/2017421482201Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
01/06/2025421731558Open ↗
▸BISLOWEST FLOOR ELEVATION1
11/21/2023421482201Open ↗
▸BISVESTIBULES1
11/21/2023421482201Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
11/21/2023421482201Open ↗
▸BISMAINTENANCE INFORMATION1
11/21/2023421482201Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
01/06/2025421731558Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
11/21/2023421482201Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/06/2025421731558Open ↗